Housing violations · Washington Heights (North)
1795 Riverside Drive, Manhattan
10034 · 72 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster39
- Other repairs15
- Mold12
- Leaks and water damage11
- Broken doors or locks11
- Lead paint6
- Plumbing, sinks and toilets3
- Roaches3
- Missing smoke or CO detector2
- Bedbugs1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 20 closed · NYC typical: 87 days
from 54 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 1st fire escape from east at south,…Issued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366756
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyerIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589412
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589422
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589418
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from eastIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589414
- COther repairsProperly repair with similar material the broken or defective two broken ceramic floor tiles (1'x1') in the bathroomIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18589421
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from eastIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589415
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589416
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18589417
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Oct 28, 2025 · fix by Nov 11, 2025 overdue · Violation #18326540
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 4th room from east at southIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181292
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 4th room from eastIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181293
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181291
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective (porcelian enamel) by method of reglaze at bathtub in the bathroomIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181290
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17033435
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 25, 2023 · fix by Sep 29, 2023 overdue · Violation #16186915
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 4th room from east at northIssued Aug 25, 2023 · fix by Sep 29, 2023 overdue · Violation #16186930
- BMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 5 sqft ) in the bathroomIssued Aug 16, 2023 · fix by Sep 20, 2023 overdue · Violation #16170750
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from north at eastIssued May 5, 2023 · fix by Jun 9, 2023 overdue · Violation #15956106
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued May 5, 2023 · fix by Jun 9, 2023 overdue · Violation #15956095
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and south wall in the private hallwayIssued Apr 18, 2023 · fix by May 23, 2023 overdue · Violation #15923337
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the foyerIssued Apr 7, 2023 · fix by May 12, 2023 overdue · Violation #15918106
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 3, 2023 · fix by May 8, 2023 overdue · Violation #15878222
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 3, 2023 · fix by May 8, 2023 overdue · Violation #15878225
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 3, 2023 · fix by May 8, 2023 overdue · Violation #15878221
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 3, 2023 · fix by May 8, 2023 overdue · Violation #15878224
- BBroken doors or locksProperly repair with similar material the broken or defective wood frame at entrance door in the 3rd room from northIssued Apr 3, 2023 · fix by May 8, 2023 overdue · Violation #15878223
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the foyerIssued Mar 27, 2023 · fix by May 1, 2023 overdue · Violation #15858174
- BMoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at ceiling in the bathroomIssued Feb 14, 2023 · fix by Mar 21, 2023 overdue · Violation #15727615
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Dec 8, 2022 · fix by Jan 12, 2023 overdue · Violation #15606660
- BBroken doors or locksProperly repair with similar material the broken or defective wood door frame . at door in the 2nd room from northIssued Dec 8, 2022 · fix by Jan 12, 2023 overdue · Violation #15606658
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 8, 2022 · fix by Jan 3, 2023 overdue · Violation #15606659
- BMoldTrace and repair the source and abate the visible mold condition approx. 10 sq. ft. at ceiling in the bathroomIssued Nov 25, 2022 · fix by Dec 30, 2022 overdue · Violation #15516207
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 25, 2022 · fix by Dec 21, 2022 overdue · Violation #15583735
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 25, 2022 · fix by Dec 30, 2022 overdue · Violation #15583736
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroomIssued Nov 25, 2022 · fix by Dec 30, 2022 overdue · Violation #15583737
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet ,, in the bathroomIssued Nov 25, 2022 · fix by Dec 30, 2022 overdue · rent impairing · Violation #15583738
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the private hallwayIssued Nov 16, 2022 · fix by Dec 21, 2022 overdue · Violation #15516212
- BMoldTrace and repair the source and abate the visible mold condition approx 15 sq ft at south wall at closet in the 1st room from northIssued Oct 17, 2022 · fix by Nov 21, 2022 overdue · Violation #15424093
- BMoldTrace and repair the source and abate the visible mold condition at the ceiling inside closet approx. 10 sq. ft in the private hallwayIssued Sep 26, 2022 · fix by Oct 31, 2022 overdue · Violation #15391624
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 25, 2022 · fix by Jun 18, 2022 overdue · Violation #15179758
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 24, 2022 · fix by Jun 19, 2022 overdue · Violation #15178938
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued May 24, 2022 · fix by Jun 19, 2022 overdue · Violation #15178899
- BMoldTrace and repair the source and abate the visible mold condition and mildew inside of closet at south wall approximately 20 sq. ft. in the 1st room from east…Issued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14718760
- BMoldTrace and repair the source and abate the visible mold condition and mildew at ceiling approximately 10 sq. ft. in the bathroomIssued Dec 8, 2021 · fix by Jan 12, 2022 overdue · Violation #14718764
- BElectrical problemsProperly repair the broken or defective electrical light fixture at ceiling. in the foyerIssued Jul 28, 2021 · fix by Sep 1, 2021 overdue · Violation #14464612
- BMoldTrace and repair the source and abate the visible mold condition at ceiling inside closet in the 1st room from northIssued Jul 28, 2021 · fix by Sep 1, 2021 overdue · Violation #14464525
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartmentIssued Jul 28, 2021 · fix by Sep 1, 2021 overdue · Violation #14464609
- BMoldTrace and repair the source and abate the visible mold condition approx.6 sq ft. at east wall and south wall approx 12 sq ft. in the bathroomIssued Oct 30, 2019 · fix by Dec 4, 2019 overdue · Violation #13323306
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the foyerIssued Oct 30, 2019 · fix by Dec 4, 2019 overdue · Violation #13323310
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the private hallIssued Oct 30, 2019 · fix by Dec 4, 2019 overdue · Violation #13323312
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the foyerIssued Oct 30, 2019 · fix by Dec 4, 2019 overdue · Violation #13323313
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls approximately 18 square feet in the 1st bathroom from eastIssued Oct 21, 2019 · fix by Nov 25, 2019 overdue · Violation #13321538
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at westIssued Oct 21, 2019 · fix by Nov 25, 2019 overdue · Violation #13321537
- BOther repairsReplace with new the broken or defective escutcheon plate at riser in the bathroomIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13011631
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 15, 2019 · fix by May 13, 2019 overdue · Violation #13012659
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, west wall in the kitchenIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13011639
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, 1st closet from east at south wall wall in the 1st…Issued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13011637
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 15, 2019 · fix by May 13, 2019 overdue · Violation #13012658
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Sep 10, 2018 · fix by Oct 15, 2018 overdue · Violation #12571543
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.