Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hamilton Heights-Sugar Hill

710 Riverside Drive, Manhattan

10031 · 37 apartments · 6 stories · City Council district 7

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 16 per 100 apartments
B36Hazardous, open
A17Non-hazardous, open
!59Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Open in Google Maps ↗

Who owns and manages it

Owning company710 Riverside Drive Condominium
Landlord (head officer or owner)Christopher Alker

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    26
  2. Peeling paint and plaster
    20
  3. Leaks and water damage
    7
  4. Missing smoke or CO detector
    2
  5. Plumbing, sinks and toilets
    1
  6. Mold
    1
  7. Roaches
    1
  8. Broken doors or locks
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C90 days
from 3 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Oct 10, 2023 · fix by Nov 14, 2023 overdue · Violation #16293582
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued Jun 6, 2022 · fix by Jul 11, 2022 overdue · Violation #15188693
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Jun 6, 2022 · fix by Jul 11, 2022 overdue · Violation #15188694
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Jun 6, 2022 · fix by Jul 11, 2022 overdue · Violation #15188692
  • B
    MoldTrace and repair the source and abate the visible mold condition 5 sq ft at east wall in the bathroomIssued Jan 20, 2022 · fix by Feb 24, 2022 overdue · Violation #14789933
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 4th story balcony…Issued Oct 20, 2021 · fix by Nov 24, 2021 overdue · Violation #14625090
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 2nd story balcony…Issued Oct 20, 2021 · fix by Nov 24, 2021 overdue · Violation #14625089
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from northIssued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605172
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 4th story balcony…Issued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605186
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 4th story balcony…Issued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605185
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond sill at 2nd story balcony…Issued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605184
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 8, 2021 · fix by Oct 14, 2021 overdue · Violation #14605179
  • B
    Other repairsProperly repair the broken or defective spring balance at lower and upper window sashes at north wall in the 4th room from north at eastIssued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605175
  • B
    Other repairsProperly repair the broken or defective spring balance at lower window sash at east wall in the bathroomIssued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605174
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605173
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Oct 8, 2021 · fix by Nov 12, 2021 overdue · Violation #14605171
  • B
    Other repairsProperly repair the broken or defective spring counter balance at lower sash in the 1st room from northIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568984
  • B
    Other repairsReplace with new the broken or defective spring counter balance at lower and upper sash in the 3rd room from northIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568986
  • B
    Other repairsReplace with new the broken or defective spring counter balance at lower sash in the kitchenIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568985
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east wall and floor in the bathroomIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568983
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568981
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceilng in the bathroomIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568980
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Sep 22, 2021 · fix by Oct 27, 2021 overdue · Violation #14568979
  • B
    Other repairsReplace with new the broken or defective spring balance in lower window sash at south wall in the 3rd room from northIssued Sep 20, 2021 · fix by Oct 25, 2021 overdue · Violation #14559734
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Sep 20, 2021 · fix by Oct 25, 2021 overdue · Violation #14559732
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 20, 2021 · fix by Sep 26, 2021 overdue · Violation #14559730
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Sep 20, 2021 · fix by Sep 26, 2021 overdue · Violation #14559729
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 20, 2021 · fix by Oct 16, 2021 overdue · Violation #14559733
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 2nd room from northIssued Sep 20, 2021 · fix by Sep 26, 2021 overdue · Violation #14559735
  • B
    Broken doors or locksArrange and make self-closing the doors in the entranceIssued Jun 17, 2019 · fix by Jul 22, 2019 overdue · Violation #13122684
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121196
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121156
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of air conditioner unit installed at window 2nd story balcony obstructing the egress at west 2 stack fire escape…Issued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121168
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121220
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121216
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121214
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all ceilings and all walls through-out in the entire apartmentIssued Jun 14, 2019 · fix by Jul 19, 2019 overdue · Violation #13121212
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 5th room from eastIssued Jan 23, 2019 · fix by Feb 27, 2019 overdue · Violation #12865669
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from eastIssued Jan 23, 2019 · fix by Feb 27, 2019 overdue · Violation #12865664
  • B
    Other repairsProperly repair with similar material the broken or defective the wood floor in the 2nd room from eastIssued Jan 23, 2019 · fix by Feb 27, 2019 overdue · Violation #12865649
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all wall in the 2nd room from eastIssued Jan 23, 2019 · fix by Feb 27, 2019 overdue · Violation #12865646
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of floor elevated 5 to 6 inches higher than the entrance at public hall in the kitchenIssued Aug 24, 2017 · fix by Sep 1, 2017 overdue · Violation #11937593

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

322017
122018
282019
382021
62022
22023
12025
42026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 206 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.