Housing violations · Hamilton Heights-Sugar Hill
745 Riverside Drive, Manhattan
10031 · 77 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster43
- Other repairs41
- Leaks and water damage19
- Broken doors or locks17
- Electrical problems14
- Missing smoke or CO detector9
- Mice or rats6
- Roaches4
- Plumbing, sinks and toilets4
- Bedbugs3
- No heat or hot water3
- Mold3
- Missing window guards3
- Lead paint2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 4 closed · NYC typical: 87 days
from 1 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18735455
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18735456
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17931410
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17931411
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893160
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893161
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893159
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 15, 2025 · fix by Jun 19, 2025 overdue · Violation #17893158
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the kitchenIssued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17235700
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 3, 2024 · fix by Sep 29, 2024 overdue · Violation #17235703
- BBroken doors or locksRefit door in the entranceIssued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17235704
- BOther repairsProperly repair with similar material the broken or defective broken ceramic floor tiles in the kitchenIssued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17235701
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 3, 2024 · fix by Sep 29, 2024 overdue · Violation #17235702
- BOther repairsProperly repair with similar material the broken or defective sloping unlevel wood floor in the private hallwayIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16980124
- BOther repairsProperly repair with similar material the broken or defective sloping unlevel wood floor in the 2nd room from northIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16980125
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 28, 2024 · fix by Apr 3, 2024 overdue · Violation #16704024
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Feb 28, 2024 · fix by Apr 3, 2024 overdue · Violation #16704025
- BOther repairsAbate the infestation consisting of vermin ants in the entire apartmentIssued Feb 28, 2024 · fix by Apr 3, 2024 overdue · Violation #16704026
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the 3rd room from northIssued Nov 29, 2022 · fix by Nov 29, 2022 overdue · rent impairing · Violation #15581948
- BMoldTrace and repair the source and abate the visible mold condition at wood floor approximately 5 square feet in the 1st room from northIssued Nov 3, 2022 · fix by Dec 8, 2022 overdue · Violation #15476280
- BOther repairsProvide adequate light of not less than 60 watts incandescent or equivalent illumination at public hall stairs, 5th story, section at southIssued Oct 17, 2022 · fix by Nov 21, 2022 overdue · Violation #15423114
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · Violation #15350307
- BOther repairsProperly repair the broken or defective intercom connection from building entrance to intercom panel at north wall in the kitchenIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · Violation #15350305
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 2, 2022 · fix by Sep 28, 2022 overdue · Violation #15350304
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2022 · fix by Sep 28, 2022 overdue · Violation #15350303
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Sep 2, 2022 · fix by Oct 7, 2022 overdue · Violation #15350306
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jul 6, 2022 · fix by Aug 10, 2022 overdue · Violation #15239040
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from northIssued Jul 6, 2022 · fix by Aug 10, 2022 overdue · Violation #15252927
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jul 6, 2022 · fix by Aug 10, 2022 overdue · Violation #15239039
- CBroken doors or locksArrange and make self-closing the doors in the entranceIssued Feb 18, 2022 · fix by Mar 16, 2022 overdue · Violation #14834908
- COther repairsProvide ready access to buildings heating system at cellarIssued Jan 18, 2022 · fix by Jan 24, 2022 overdue · Violation #14787053
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenIssued Feb 16, 2021 · fix by Mar 23, 2021 overdue · Violation #13992285
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Feb 16, 2021 · fix by Mar 23, 2021 overdue · Violation #13992284
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 16, 2021 · fix by Mar 14, 2021 overdue · Violation #13992283
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 16, 2021 · fix by Mar 14, 2021 overdue · Violation #13992282
- BBroken doors or locksReplace with new the missing closet door at south wall in the private hallwayIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13592704
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 21, 2020 · fix by Mar 13, 2020 overdue · Violation #13592564
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13592562
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13592561
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from northIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13592560
- BOther repairsProperly repair the broken or defective spring balance at lower sash 2nd window from north at east wall in the 4th room from northIssued Feb 21, 2020 · fix by Mar 27, 2020 overdue · Violation #13592559
- BOther repairsProperly repair with similar material the broken or defective ceramic tile walls throughout in the 1st bathroom from north at eastIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · Violation #13533941
- BPlumbing, sinks and toiletsReplace the broken or defective wash basin at east wall in the 1st bathroom from north at eastIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · rent impairing · Violation #13533940
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 13, 2020 · fix by Mar 5, 2020 overdue · Violation #13533939
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 13, 2020 · fix by Mar 5, 2020 overdue · Violation #13533938
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · Violation #13533937
- BPlumbing, sinks and toiletsReplace with new the broken or defective base cabinet sink at east wall in the kitchenIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · Violation #13533936
- BBroken doors or locksReplace with new the broken or defective gasket seal on refrigerator freezer door in the kitchenIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · Violation #13533935
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st bathroom from north at eastIssued Feb 13, 2020 · fix by Mar 19, 2020 overdue · Violation #13533942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at wall east in the 1st room from northIssued Jan 28, 2020 · fix by Mar 3, 2020 overdue · Violation #13531426
- BBroken doors or locksProperly repair the broken or defective closet door in the 1st foyer from eastIssued Jan 28, 2020 · fix by Mar 3, 2020 overdue · Violation #13531427
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at west wall at public hall, 6th story, section ''745'', 1st from west at northIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278069
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at west wall at public hall, 5th story, section ''745'', 1st from west at northIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278070
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 24, 2019 · fix by Oct 22, 2019 overdue · Violation #13278082
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278081
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278080
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at north wall at public hall, 2nd story, section ''745'', 1st from east at southIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278078
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at north wall at public hall, 4th story, section ''745'', 1st from east at southIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278077
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at north wall at public hall, 5th story, section ''745'', 1st from east at southIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278076
- BElectrical problemsReplace with new the missing electerical outlet child safety cover plate at north wall at public hall, 6th story, section ''745'', 1st from east at southIssued Sep 24, 2019 · fix by Oct 29, 2019 overdue · Violation #13278075
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.