Housing violations · Inwood
34 Seaman Avenue, Manhattan
10034 · 60 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
16 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs61
- Peeling paint and plaster54
- Broken doors or locks22
- Leaks and water damage19
- Roaches12
- Mice or rats10
- No heat or hot water10
- Lead paint7
- Electrical problems5
- Missing smoke or CO detector5
- Plumbing, sinks and toilets5
- Mold4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 94 closed · NYC typical: 87 days
from 342 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProvide dwelling with a janitor or responsible person or janitorial serviceIssued Nov 12, 2026 · fix by Dec 17, 2026 · rent impairing · Violation #19367842
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Nov 12, 2026 · fix by Nov 26, 2026 · Violation #19366873
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19366874
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19366875
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 1st room from east at northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366877
- CBroken doors or locksProvide ready access to buildings heating system door locked in the basement at boiler room at eastIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19365695
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 10, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19365696
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 10, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19365697
- CBroken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19358903
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 9, 2026 · fix by Nov 7, 2026 overdue · rent impairing · Violation #19358904
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 9, 2026 · fix by Nov 7, 2026 overdue · rent impairing · Violation #19358902
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19321916
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · rent impairing · Violation #19321915
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19362940
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354629
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354630
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19354633
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall and ceiling in the 2nd room from eastIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354631
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19354628
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19353725
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19353724
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353721
- BOther repairsProvide dwelling with a janitor or responsible person or janitorial serviceIssued Nov 5, 2026 · fix by Dec 10, 2026 · rent impairing · Violation #19353723
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19353722
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling north and south walls in the 4th room from eastIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354632
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19353720
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19321906
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19321913
- BOther repairsProperly repair with similar material the broken or defective erroded brick and mortar at west parapet wall, north 1 roof (44 seaman ave) , 6th storyIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19321912
- BLead paintProperly repair or replace the broken or defective spring balance at lower sash at east wall window leading to fire escape in the 2nd room from eastIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19321909
- BOther repairsProperly repair with similar material the broken or defective cracked, lifting wood flooring in the 2nd room from eastIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19321908
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19321907
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321914
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321911
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19321919
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartmentIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321918
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321910
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321917
- BOther repairsProperly repair or replace the broken or defective lower window counter balance at east wall in the 2nd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269493
- BOther repairsProvide dwelling with a janitor or responsible person or janitorial serviceIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275239
- BBroken doors or locksReplace with new the missing door at entrance to room in the 2nd room from east at southIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19259034
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269479
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269484
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west and east wall in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269480
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269481
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269482
- BBroken doors or locksProperly repair or replace the broken or defective door at north wall in the 1st room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269483
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269485
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269486
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269487
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line drain pipe at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269489
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269490
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269491
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269492
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 5th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269494
- BLead paintProperly repair or replace the broken or defective spring balance at lower window sash at window leading to fire escape in the 2nd room from east at northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19259033
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19259029
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19259028
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east at southIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19247062
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19247065
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.