Housing violations · Inwood
89 Seaman Avenue, Manhattan
10034 · 43 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
24 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs34
- Broken doors or locks21
- Peeling paint and plaster14
- Mice or rats14
- Roaches14
- No heat or hot water13
- Mold8
- Lead paint5
- Leaks and water damage4
- Electrical problems4
- Plumbing, sinks and toilets3
- Missing smoke or CO detector2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 101 closed · NYC typical: 87 days
from 146 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of refrigerator with doors intact near mailbox at public hall, 1st storyIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19356132
- BOther repairsRemove all encumbrances consisting of construction materials at public hall, 2nd storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19351214
- BOther repairsProperly repair or replace the broken or defective counter balance at upper window sash at window at east wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345992
- BOther repairsRemove all encumbrances consisting of garbage bags at public hall, 4th storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19190775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in closet at south wall in the private hallwayIssued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19077533
- BBroken doors or locksProperly repair or replace the broken or defective locks at windows on west wall in the 4th room from eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077532
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077529
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash and upper sash windows at north wall in the 2nd room from eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077528
- BOther repairsProperly repair or replace the broken or defective spring balance at upper and lower sash window at north wall in the bathroomIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077530
- BOther repairsProperly repair or replace the broken or defective spring balance at lower and upper sash windows at west wall in the 4th room from eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077531
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077534
- BOther repairsProperly repair or replace the broken or defective spring balance at upper and lower sash window at north wall in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077525
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077526
- BOther repairsProperly repair with similar material the broken or defective hardwood floor in the foyerIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19077527
- BOther repairsProperly repair or replace the broken or defective counter balance at upper sash at 1st winodw from south at west in the 4th room from eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19059312
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash at 1st winow from west at north in the 2nd room from eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19059310
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash at 2nd window from west at north in the 2nd room from eastIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19059311
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash at window at north wall in the kitchenIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19059306
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story, section ''south''Issued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18939060
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 5th story, section ''south''Issued May 19, 2026 · fix by Jun 23, 2026 overdue · rent impairing · Violation #18939062
- BOther repairsProperly repair with similar material the broken or defective marble tread 5th from bottom up at public hall stairs, 1st story, section ''north''Issued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18939059
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814985
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814988
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814981
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814987
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Apr 24, 2026 · fix by May 29, 2026 overdue · Violation #18814980
- COther repairsFire escape defective. replace with new the broken, defective and/or missing 1st rung from bottom at drop ladder in the 2nd stack from west at building rear at…Issued Apr 3, 2026 · fix by Apr 9, 2026 overdue · rent impairing · Violation #18763142
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door at bulkhead , section ''east''Issued Apr 3, 2026 · fix by Apr 17, 2026 overdue · Violation #18763199
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 3, 2026 · fix by Apr 29, 2026 overdue · Violation #18763219
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Apr 3, 2026 · fix by Apr 29, 2026 overdue · rent impairing · Violation #18763103
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18763220
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 3, 2026 · fix by Apr 29, 2026 overdue · Violation #18763099
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 2, 2026 · fix by Apr 28, 2026 overdue · Violation #18750591
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 2, 2026 · fix by Apr 28, 2026 overdue · Violation #18750592
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725084
- BOther repairsProperly repair with similar material the broken or defective vinyl floor panels in the kitchenIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725082
- BOther repairsProperly repair with similar material the broken or defective wooden floor panels in the 4th room from eastIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725079
- BBroken doors or locksProperly repair or replace the broken or defective north 2 closet door in the 1st room from eastIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725097
- BBroken doors or locksProperly repair or replace the broken or defective north 1 closet door in the 1st room from eastIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725096
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north and east wall at bulkhead at public hall, 5th story, section at…Issued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725042
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 5th story, section at southIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · rent impairing · Violation #18725050
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiing and all walls in the bathroomIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18725089
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at door to roof at bulkhead at public hall, 5th story, section at northIssued Mar 23, 2026 · fix by Apr 6, 2026 overdue · Violation #18725044
- BOther repairsProperly repair with similar material the broken or defective brick and mortar at 1st north building facade from east at parapet wallIssued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18695055
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective east bulkhead door at roofIssued Mar 10, 2026 · fix by Mar 24, 2026 overdue · Violation #18695072
- BOther repairsProperly repair with similar material the broken or defective brick and mortar at building facade at parapet wall at front courtIssued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18695064
- CBroken doors or locksRemove the illegal fastening consisting of push paddle alarm latching device at east bulkhead door at roofIssued Mar 10, 2026 · fix by Mar 16, 2026 overdue · rent impairing · Violation #18695074
- COther repairsProperly repair with similar material the broken or defective marble bull nosing at 8th tread from bottom up at public hall stairs at east , 5th storyIssued Mar 10, 2026 · fix by Mar 16, 2026 overdue · Violation #18695087
- COther repairs& 309 m/d law abate the nuisance consisting of free standing radiator at public hall, 4th storyIssued Mar 10, 2026 · fix by Mar 16, 2026 overdue · Violation #18695092
- BOther repairsProperly repair with similar material the broken or defective brick and mortar at 2nd north building facade from east at parapet wallIssued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18695056
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 9, 2026 · fix by Mar 8, 2026 overdue · rent impairing · Violation #18690428
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 9, 2026 · fix by Mar 8, 2026 overdue · rent impairing · Violation #18690427
- BLead paintProperly repair or replace the broken or defective east handrail at stairs leading to east court , 1st storyIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18690429
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 2, 2026 · fix by Mar 28, 2026 overdue · Violation #18672743
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18672742
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 29, 2026 · fix by Feb 24, 2026 overdue · Violation #18601013
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 29, 2026 · fix by Feb 24, 2026 overdue · Violation #18601012
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 9, 2026 · fix by Jan 8, 2026 overdue · rent impairing · Violation #18554684
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 29, 2025 · fix by Jan 12, 2026 overdue · Violation #18532273
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 23, 2025 · fix by Dec 23, 2025 overdue · rent impairing · Violation #18524817
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.