Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Inwood

120 Sherman Avenue, Manhattan

10034 · 30 apartments · 5 stories · City Council district 10

By · Updated · Data from NYC HPD

C
25open immediately hazardous violations · 83 per 100 apartments
B42Hazardous, open
A8Non-hazardous, open
!67Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company120-128 SHERMAN LLC
Landlord (head officer or owner)Sefik Gunes

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    26
  2. Lead paint
    13
  3. Broken doors or locks
    10
  4. Peeling paint and plaster
    9
  5. Leaks and water damage
    5
  6. Mice or rats
    4
  7. Plumbing, sinks and toilets
    3
  8. Missing smoke or CO detector
    2
  9. Mold
    2
  10. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C81 days
from 54 closed · NYC typical: 87 days
B95 days
from 39 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash at 1st window from south at west wall at public hall, 1st storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301792
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west wall at public hall, 1st storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19301791
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 14, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19301786
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240783
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240776
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 4th room from north at westIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19240779
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19206322
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste- pipe at the wash basin in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19206313
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 15, 2026 · fix by Oct 11, 2026 overdue · rent impairing · Violation #19206325
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet but less than 30 square feet observed at the ceiling in the…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19206315
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2026 · fix by Oct 11, 2026 overdue · Violation #19206323
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste- line at the bathtub in the bathroomIssued Sep 15, 2026 · fix by Oct 20, 2026 overdue · rent impairing · Violation #19206314
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19206321
  • B
    Other repairsProperly repair with similar material the broken or defective lower spring balance at the north window in the 1st room from north at eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206316
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206311
  • B
    Other repairsProperly repair or replace the broken or defective lower spring balance at the north window in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206317
  • B
    Other repairsProperly repair or replace the broken or defective lower spring balance at the west window in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206318
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206319
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19206310
  • B
    Broken doors or locksProperly repair or replace the broken or defective the door at entrance in the 2nd room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175851
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175844
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19175850
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175855
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from east at northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19175854
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash/basin in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175848
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175846
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175853
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175857
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at southIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19175856
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19145665
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19145666
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at east bulkhead doorIssued Jan 28, 2026 · fix by Feb 11, 2026 overdue · Violation #18596540
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued May 5, 2025 · fix by May 11, 2025 overdue · Violation #17868377
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389246
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door at south wall in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389252
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east and north walls in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389251
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389250
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389249
  • B
    Plumbing, sinks and toiletsReplace with new the missing wash basin in the bathroomIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17389247
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles at west section at public hall, 1st storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · Violation #17146544
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile at east section at public hall, 1st storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · Violation #17146547
  • B
    Other repairsRemove all encumbrances consisting of dry wall and building supplies at east section at public hall, 1st storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · rent impairing · Violation #17146546
  • B
    Other repairsRemove all encumbrances consisting of dry wall and building supplies at east section at public hall, 1st storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · rent impairing · Violation #17146545
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at north wall at 5th story at public hallIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17026974
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles at 5th story at public hallIssued Jun 10, 2024 · fix by Jul 15, 2024 overdue · Violation #17026973
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at south bulkhead doorIssued Jun 7, 2024 · fix by Jun 21, 2024 overdue · Violation #17026976
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance doorIssued Jun 7, 2024 · fix by Jun 21, 2024 overdue · Violation #17026968
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at building entrance doorIssued Jun 7, 2024 · fix by Jul 12, 2024 overdue · Violation #17026969
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective door at north bulkhead to roofIssued Jun 7, 2024 · fix by Jun 21, 2024 overdue · Violation #17026977
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective misaligned door leading to west yard at 1st sty at public hallIssued Jun 3, 2024 · fix by Jun 17, 2024 overdue · Violation #17018170
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347299
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347296
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347301
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347300
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347298
  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347302
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2023 · fix by Nov 20, 2023 overdue · Violation #16347303
  • C
    Broken doors or locksProperly repair or replace the broken or defective locking device at building front entrance door , 1st storyIssued Oct 10, 2023 · fix by Oct 16, 2023 overdue · Violation #16293913
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16279228
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at east, north, and south walls in the bathroomIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16279229

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

342017
232019
282020
342021
452022
422023
642024
142025
582026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 435 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.