Housing violations · Washington Heights (South)
1320 St Nicholas Avenue, Manhattan
10033 · 55 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint27
- Peeling paint and plaster19
- Other repairs15
- Roaches13
- Mice or rats8
- Leaks and water damage5
- Missing smoke or CO detector4
- Plumbing, sinks and toilets3
- Broken doors or locks3
- Mold3
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 101 closed · NYC typical: 87 days
from 177 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2026 · fix by Nov 20, 2026 · Violation #19336457
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 26, 2026 · fix by Nov 19, 2026 · Violation #19330275
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19214994
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19214995
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202848
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east at southIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202849
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from east at northIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19202847
- BOther repairsProperly repair or replace the broken or defective bell buzzard intercom system from street toIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19200576
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193667
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193659
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193668
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191527
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19193658
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19193670
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19193669
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19193657
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191528
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193661
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall, the north wall, the east wall, the west wall and the ceiling in…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193660
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical light fixture at ceiling in the 1st room from northIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193663
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19193665
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 10, 2026 · fix by Sep 5, 2026 overdue · Violation #19123565
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19123590
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Aug 10, 2026 · fix by Aug 24, 2026 overdue · Violation #19123587
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash on east window at south wall in the 3rd room from north at westIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111985
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 5th room from east at southIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111969
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19111993
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19111994
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111978
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and west wall in the 4th room from east at northIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111991
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash window at south wall in the 3rd room from north at eastIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19111983
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jul 23, 2026 · fix by Aug 27, 2026 overdue · Violation #19097869
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 10, 2026 · fix by Jul 6, 2026 overdue · Violation #18992461
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 10, 2026 · fix by Jul 6, 2026 overdue · Violation #18992460
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, east, south and north wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849328
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and east walls in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849331
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east walls in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849330
- CLead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Mar 17, 2026 · fix by Apr 10, 2026 overdue · Violation #18722827
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 17, 2026 · fix by Apr 10, 2026 overdue · Violation #18722828
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 13, 2025 · fix by Dec 7, 2025 overdue · Violation #18372562
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Nov 13, 2025 · fix by Dec 7, 2025 overdue · Violation #18372563
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to panel at north wall in the kitchenIssued Aug 26, 2025 · fix by Sep 30, 2025 overdue · Violation #18176340
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Aug 21, 2025 · fix by Sep 14, 2025 overdue · Violation #18179588
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 20, 2025 · fix by Sep 13, 2025 overdue · Violation #18179373
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 20, 2025 · fix by Sep 13, 2025 overdue · Violation #18179372
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 20, 2025 · fix by Sep 13, 2025 overdue · Violation #18179370
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 20, 2025 · fix by Sep 13, 2025 overdue · Violation #18179374
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to north wall in the 3rd room from eastIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18129240
- BOther repairsProperly repair or replace the broken or defective bell and return system from apartment to building front in the 3rd room from eastIssued Jun 18, 2025 · fix by Jul 23, 2025 overdue · Violation #18035172
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393735
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393736
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393737
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393738
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393739
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17393734
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Oct 25, 2024 · fix by Oct 29, 2024 overdue · Violation #17377382
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Oct 25, 2024 · fix by Oct 29, 2024 overdue · Violation #17377383
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 23, 2024 · fix by Oct 19, 2024 overdue · Violation #17291039
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 23, 2024 · fix by Oct 19, 2024 overdue · Violation #17291040
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 12, 2024 · fix by Sep 5, 2024 overdue · Violation #17188901
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.