Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

1392 St Nicholas Avenue, Manhattan

10033 · 18 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
6open immediately hazardous violations · 33 per 100 apartments
B9Hazardous, open
A6Non-hazardous, open
!18Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company560 West 180 St. NYC LLC
Landlord (head officer or owner)Rick Herman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    8
  2. Lead paint
    3
  3. Mold
    2
  4. Leaks and water damage
    2
  5. Missing smoke or CO detector
    2
  6. Peeling paint and plaster
    2
  7. Roaches
    1
  8. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C122 days
from 16 closed · NYC typical: 87 days
B121 days
from 28 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19235237
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19235238
  • C
    MoldTrace and repair the source and abate the visible mold condition greater then 10 sqft at south and east walls in the 1st bathroom from northIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19220453
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchenIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815632
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815635
  • B
    Missing smoke or CO detectorFile certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations. in the entire apartmentIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815636
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchenIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815634
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south walls in the bathroomIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815629
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and south wall in the bathroomIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18815628
  • C
    Lead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Oct 17, 2025 · fix by Oct 21, 2025 overdue · Violation #18309010
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Oct 17, 2025 · fix by Oct 21, 2025 overdue · Violation #18309011
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18087614
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic-tiles at east wall in the bathroomIssued Jul 10, 2025 · fix by Aug 14, 2025 overdue · Violation #18087616
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 5th room from east at northIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17934171
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 14, 2020 · fix by Sep 7, 2020 overdue · Violation #13764550

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

62017
642018
112019
122020
62021
12022
272023
72024
252025
202026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 412 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.