Housing violations · Harlem (South)
17 St Nicholas Avenue, Manhattan
10026 · 34 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster36
- Other repairs34
- Missing smoke or CO detector24
- Leaks and water damage16
- Mice or rats12
- Plumbing, sinks and toilets9
- Broken doors or locks9
- Roaches9
- No heat or hot water4
- Lead paint3
- Electrical problems2
- Mold2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 132 closed · NYC typical: 87 days
from 142 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 6th room from northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346975
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the foyerIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19331641
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 28, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19331643
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331639
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Oct 28, 2026 · fix by Dec 2, 2026 · rent impairing · Violation #19331640
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 28, 2026 · fix by Oct 28, 2026 overdue · rent impairing · Violation #19331642
- BPlumbing, sinks and toiletsRepair the broken or defective connection at drain pipe at base cabinet under wash basin in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19279254
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the foyerIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19279256
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at vestibule ceiling at public hall, 1st storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19209837
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling north south and west wall in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19179889
- COther repairsProperly repair with similar material the broken or defective marble saddle in the bathroomIssued Sep 10, 2026 · fix by Sep 16, 2026 overdue · Violation #19179891
- COther repairsProperly repair with similar material the broken or defective warped wood floors in the private hallwayIssued Sep 10, 2026 · fix by Sep 16, 2026 overdue · Violation #19179895
- BOther repairsProperly repair with similar material the broken or defective warped wood floors in the 3rd room from north at westIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19179897
- BOther repairsProperly repair with similar material the broken or defective warped wood floors in the 3rd room from north at eastIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19179896
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling north south and west wall in the bathroomIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19179888
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at hopper door at public hall, 4th storyIssued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19082310
- BBroken doors or locksProperly repair or replace the broken or defective latch set at hopper door at public hall, 4th storyIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19082311
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571788
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18577848
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571789
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 3, 2025 · fix by Dec 29, 2025 overdue · Violation #18477967
- BOther repairs& 309 m/d law abate the nuisance consisting of lower sash window stuck shut at east wall in the kitchenIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18477965
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Dec 3, 2025 · fix by Jan 7, 2026 overdue · Violation #18477966
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 18, 2025 · fix by Dec 14, 2025 overdue · Violation #18376142
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at balcony at fire escape, 6th story, section ''front''Issued Sep 29, 2025 · fix by Nov 3, 2025 overdue · Violation #18253955
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 29, 2025 · fix by Sep 28, 2025 overdue · rent impairing · Violation #18257683
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 26, 2025 · fix by Oct 31, 2025 overdue · Violation #18253954
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 26, 2025 · fix by Sep 26, 2025 overdue · rent impairing · Violation #18253952
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective rotten floor at wood base cabinet at sink in the kitchenIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18247561
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the bathroomIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18245324
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · rent impairing · Violation #18245344
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18245345
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18245350
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18245347
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 22, 2025 · fix by Oct 27, 2025 overdue · Violation #18245326
- BOther repairsProperly repair with similar material the broken or defective marble saddle in the bathroomIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18231495
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective vanity cabinet at wash basin in the bathroomIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18231494
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18231492
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18231490
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18231487
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231496
- BOther repairsProperly repair or replace the broken or defective metal hydronic baseboard radiator covers in the 2nd room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231497
- BOther repairsProperly repair or replace the broken or defective light fixture at the ceiling in the private hallwayIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231498
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallwayIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231499
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 3rd room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231500
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231485
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the foyerIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231507
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231488
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north wall, east wall, and west wall in the 4th room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231502
- BOther repairsProperly repair or replace the broken or defective metal hydronic baseboard radiator covers in the 4th room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231503
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at the south wall in the 4th room from eastIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231504
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the foyerIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231508
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18230051
- BLeaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231482
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18230050
- BBroken doors or locksProperly repair with similar material the broken or defective rubber gasket at the refridgerator door in the kitchenIssued Sep 17, 2025 · fix by Oct 22, 2025 overdue · Violation #18231484
- BBroken doors or locksProperly repair or replace the broken or defective hinges at north 1 entrance door in the 2nd room from eastIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216754
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at west 1 door in the entranceIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216751
- BOther repairsProperly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroomIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216755
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Sep 10, 2025 · fix by Oct 15, 2025 overdue · Violation #18216750
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.