Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hamilton Heights-Sugar Hill

654 St Nicholas Avenue, Manhattan

10030 · 24 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
19open immediately hazardous violations · 79 per 100 apartments
B62Hazardous, open
A29Non-hazardous, open
!100Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyRICHARD WRIGHT LP
Landlord (head officer or owner)Janice Berthoud

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    23
  2. Leaks and water damage
    19
  3. Other repairs
    16
  4. Missing smoke or CO detector
    16
  5. Broken doors or locks
    8
  6. Electrical problems
    5
  7. Mice or rats
    5
  8. Roaches
    4
  9. Lead paint
    4
  10. Plumbing, sinks and toilets
    3
  11. Mold
    3
  12. No heat or hot water
    2
  13. Missing window guards
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C51 days
from 12 closed · NYC typical: 87 days
B121 days
from 11 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221583
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221578
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221585
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the private hallwayIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221584
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221582
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221581
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221580
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood entrance door in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221579
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19221577
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19171824
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19171822
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19171823
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19171821
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the foyerIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19144939
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at south wall in the bathroomIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19064346
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19035396
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jun 29, 2026 · fix by Jul 5, 2026 overdue · rent impairing · Violation #19035394
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19035395
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the 2nd bathroom from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037433
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at wash basin in the 1st bathroom from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · rent impairing · Violation #19037432
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991914
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991915
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18991916
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south walls in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991917
  • B
    Broken doors or locksProperly repair or replace the broken or defective gasket at refrigerator and freezer doors in the kitchenIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991918
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of household items obstructing egress window in the 1st room from east at southIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936586
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936588
  • B
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · rent impairing · Violation #18936585
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936587
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyerIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18782544
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the foyerIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791224
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the foyerIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791223
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the foyerIssued Apr 17, 2026 · fix by May 22, 2026 overdue · rent impairing · Violation #18791222
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Apr 17, 2026 · fix by May 22, 2026 overdue · rent impairing · Violation #18782543
  • B
    Leaks and water damageRepair the roof so that it will not leak above window soffit in the kitchenIssued Apr 17, 2026 · fix by May 22, 2026 overdue · rent impairing · Violation #18782548
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the foyerIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18782546
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 14, 2026 · fix by May 10, 2026 overdue · Violation #18782550
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18748980
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Mar 31, 2026 · fix by Apr 6, 2026 overdue · rent impairing · Violation #18748976
  • B
    Other repairsProperly repair or replace the broken or defective mechanical ventilation system at east wall in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18748977
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18748979
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the private hallwayIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18748982
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the private hallwayIssued Mar 31, 2026 · fix by May 5, 2026 overdue · rent impairing · Violation #18748981
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 5, 2026 · fix by Mar 31, 2026 overdue · Violation #18683768
  • B
    Other repairsRemove all encumbrances consisting of sofa chair and wooden table at public hall, 1st storyIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · rent impairing · Violation #18683772
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18683771
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at eastIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18683770
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18683767
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Mar 5, 2026 · fix by Apr 9, 2026 overdue · Violation #18683766
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18661964
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18661965
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling in the bathroomIssued Oct 10, 2025 · fix by Nov 14, 2025 overdue · Violation #18293896
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156241
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156242
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 11, 2025 · fix by Sep 6, 2025 overdue · Violation #18156246
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156247
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156268
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156261
  • B
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at wash basin [ low volume ] in the bathroomIssued Aug 11, 2025 · fix by Sep 15, 2025 overdue · rent impairing · Violation #18156270
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 11, 2025 · fix by Sep 15, 2025 overdue · Violation #18156269

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

142017
72018
42019
132020
292021
422022
182023
172024
282025
742026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 260 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.