Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hamilton Heights-Sugar Hill

672 St Nicholas Avenue, Manhattan

10030 · 49 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
7open immediately hazardous violations · 14 per 100 apartments
B21Hazardous, open
A7Non-hazardous, open
!22Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company672 ASSOCIATES, LLC
Landlord (head officer or owner)Alan Shamah

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    10
  2. Peeling paint and plaster
    6
  3. Plumbing, sinks and toilets
    5
  4. Mice or rats
    4
  5. Roaches
    4
  6. Mold
    3
  7. Lead paint
    1
  8. Leaks and water damage
    1
  9. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C76 days
from 46 closed · NYC typical: 87 days
B91 days
from 27 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 16, 2026 · Violation #19383544
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection the drain pipe at sink in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19350499
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19314113
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290159
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290155
  • B
    Plumbing, sinks and toiletsReplace the broken or defective base cabinet at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19290158
  • B
    MoldTrace and repair the source and abate the visible mold condition more then 10 sq ft of mold on the south wall, the east wall and the ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290154
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall and east wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19290157
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at the ceiling in the private hallwayIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208857
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at the south wall in the foyerIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208858
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19208859
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19208861
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste- pipe under the washbasin in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208864
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at the waste-pipe under the sink in the kitchenetteIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208860
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 5th room from east at southIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19049860
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19034050
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the private hallwayIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19034051
  • B
    Other repairsProperly repair with similar material the broken or defective wood subfloor in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19034052
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at the ceiling at basementIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19034060
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2026 · fix by May 27, 2026 overdue · Violation #18825118
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18775221
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18775222
  • B
    Other repairsProperly repair with similar material the broken or defective sloping wood floor in the 1st private hallway from eastIssued Apr 26, 2024 · fix by May 31, 2024 overdue · Violation #16926945
  • B
    Other repairsProperly repair with similar material the broken or defective sloping wood floor in the 1st room from eastIssued Apr 26, 2024 · fix by May 31, 2024 overdue · Violation #16926944
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceilling in the kitchenIssued Jan 10, 2022 · fix by Feb 14, 2022 overdue · Violation #14770178
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Mar 6, 2019 · fix by Apr 10, 2019 overdue · Violation #10760258
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Mar 6, 2019 · fix by Apr 10, 2019 overdue · Violation #10760229
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Mar 6, 2019 · fix by Apr 10, 2019 overdue · Violation #10760260

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

402017
132018
402019
162020
272021
92022
332023
342024
162025
392026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 413 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.