Housing violations · East Flatbush-Remsen Village
60 East 93 Street, Brooklyn
11212 · 34 apartments · 7 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
60 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs133
- Peeling paint and plaster107
- Leaks and water damage56
- Broken doors or locks50
- Mold41
- Roaches41
- Mice or rats41
- Missing smoke or CO detector31
- Plumbing, sinks and toilets27
- Electrical problems14
- No heat or hot water13
- Lead paint3
- Bedbugs3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 60 closed · NYC typical: 87 days
from 25 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19370679
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at ceiling in the bathroomIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19362687
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19305599
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 20, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19305598
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch assembly at building entrance door at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19305917
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at ceiling in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19309781
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19289773
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19276009
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at south wall in the bathroomIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19276007
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 6, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19276015
- CBroken doors or locksProvide ready access to buildings heating system door lock at public hall basement story at boiler roomIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19276016
- BPlumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19276013
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · rent impairing · Violation #19272017
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19272021
- BOther repairsProperly repair or replace the broken or defective ventilation system at east wall in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19272018
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19272020
- CMoldTrace and repair the source and abate the visible mold condition more than 30 sq.ft observed at ceiling in the bathroomIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19272019
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19272022
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in closet in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255838
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255839
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 29, 2026 · fix by Oct 5, 2026 overdue · rent impairing · Violation #19255841
- BOther repairsProperly repair or replace the broken or defective counter balance at lower sash window at east wall in the 2nd room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255843
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255842
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255840
- BOther repairsProperly repair or replace the broken or defective spring balance at lower window sash at west wall in the 1st room from northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239851
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19239848
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at electrical outlet at south wall in the kitchenIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239847
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239845
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch assembly at building front entrance door at public hallIssued Sep 25, 2026 · fix by Oct 9, 2026 overdue · Violation #19231657
- COther repairsProvide an adequate supply of gas to the fixtures at range in the entire apartmentIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19239846
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly at building front entrance door at public hallIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19231658
- BBroken doors or locksProperly repair or replace the broken or defective latch assembly device set at door at building frontIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239857
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239855
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq feet but less than 30sq feet observed at ceiling in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239854
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside the closet at east wall in the 2nd room from northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239852
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 2nd room from northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239850
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19239853
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 25, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19239849
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19230356
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · rent impairing · Violation #19224765
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19230357
- BBroken doors or locksProperly repair or replace the broken or defective latch set and door knob assembly at entrance doorIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224924
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224770
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · rent impairing · Violation #19224766
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224767
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin waste line in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · rent impairing · Violation #19224768
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 18, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19224914
- BBroken doors or locksProperly repair or replace the broken or defective latch set and door knob assembly at door to entrance in the 2nd room from north at eastIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224915
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 square feet in in the bathroomIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19224919
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224921
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19224922
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224771
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door to entranceIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19224923
- CNo heat or hot waterProvide hot water at all hot water fixtures in the kitchenIssued Sep 18, 2026 · fix by Sep 18, 2026 overdue · rent impairing · Violation #19224920
- BPlumbing, sinks and toiletsProperly secure the loose wash basin at north wall in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19224918
- CBroken doors or locksProvide ready access to buildings heating system locked grey metal door at west wall, cellar level, east section at boiler roomIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19224916
- BOther repairsProperly repair or replace the broken or defective ventilation system at south wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19217973
- BBroken doors or locksProperly repair or replace the broken or defective door lock in the 1st room from east at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19217974
- BOther repairsProperly repair or replace the broken or defective ventilation fan at west wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19217980
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19217981
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.