Housing violations · East Flatbush-Remsen Village
499 East 94 Street, Brooklyn
11212 · 4 apartments · 2 stories · City Council district 42
By Mantie Reid II · Updated · Data from NYC HPD
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs18
- Missing smoke or CO detector10
- Bedbugs6
- Peeling paint and plaster5
- Roaches5
- Mice or rats5
- Leaks and water damage5
- Broken doors or locks5
- Lead paint2
- Mold2
- Plumbing, sinks and toilets1
- No heat or hot water1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 3 closed · NYC typical: 87 days
from 1 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17930496
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17930488
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 2, 2025 · fix by Jun 28, 2025 overdue · Violation #17930486
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 2, 2025 · fix by Jun 28, 2025 overdue · Violation #17930487
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the 2nd room from eastIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · rent impairing · Violation #17930490
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the 1st room from east at southIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · rent impairing · Violation #17930491
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17930489
- CLeaks and water damageRepair the roof so that it will not leak at the ceiling in the bathroomIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · rent impairing · Violation #17930485
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at the vestibule at public hall, 1st storyIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17930495
- CLead paintProvide ready access to buildings heating system door leading to boiler room locked at boiler roomIssued Jun 2, 2025 · fix by Jun 8, 2025 overdue · Violation #17930493
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment door in the entranceIssued Jun 2, 2025 · fix by Jun 16, 2025 overdue · Violation #17930492
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at southIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923950
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923944
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923946
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 30, 2025 · fix by Jun 25, 2025 overdue · Violation #17923948
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 30, 2025 · fix by Jun 25, 2025 overdue · Violation #17923949
- CBroken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued May 30, 2025 · fix by Jun 5, 2025 overdue · Violation #17923942
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued May 30, 2025 · fix by Jun 5, 2025 overdue · rent impairing · Violation #17923943
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 30, 2025 · fix by May 29, 2025 overdue · rent impairing · Violation #17923941
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17923945
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17900906
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17900909
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17900908
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17900907
- CMice or ratsAbate the infestation consisting of rodents rat at building front yardIssued Oct 24, 2024 · fix by Nov 19, 2024 overdue · rent impairing · Violation #17357896
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at floor at public hall, 1st storyIssued Oct 24, 2024 · fix by Nov 28, 2024 overdue · Violation #17357895
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17229618
- BMoldTrace and repair the source and abate the visible mold condition approximately 1oo sq.ft at north wall, approximately 1oo sq.ft at south wall at cellarIssued Feb 14, 2024 · fix by Mar 20, 2024 overdue · Violation #16643914
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16643912
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16643913
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 27, 2023 · fix by Nov 1, 2023 overdue · Violation #16255534
- BLead paintProperly secure the loose wood treads 2nd and 3rd from bottom up at stairs leading to apartment 1a at public hall, 1st storyIssued Jul 19, 2018 · fix by Aug 23, 2018 overdue · Violation #12481414
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Mar 15, 2017 · fix by Mar 23, 2017 overdue · Violation #11690747
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued May 7, 2015 · fix by Jun 11, 2015 overdue · Violation #10700764
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued May 7, 2015 · fix by Jun 11, 2015 overdue · Violation #10700773
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued May 7, 2015 · fix by Jun 11, 2015 overdue · Violation #10700726
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued May 4, 2015 · fix by Jun 8, 2015 overdue · Violation #10696206
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wiring at ceiling in the 2nd room from eastIssued May 4, 2015 · fix by Jun 8, 2015 overdue · Violation #10696202
- BMissing smoke or CO detectorRepair or replace the smoke detector defectiveIssued May 4, 2015 · fix by Jun 8, 2015 overdue · Violation #10696216
- BOther repairsProperly repair with similar material the broken or defective erroded masonary brick wall from 2nd story to roof parpet wall at building frontIssued Apr 20, 2015 · fix by May 25, 2015 overdue · Violation #10672148
- BOther repairsProperly repair with similar material the broken or defective masonary window sill at north east window 2nd story font facade of buildingIssued Apr 17, 2015 · fix by May 22, 2015 overdue · Violation #10672117
- CBroken doors or locksPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system on…Issued Nov 26, 2007 · fix by Dec 2, 2007 overdue · Violation #7026431
- CBroken doors or locksProvide ready access to buildings heating system ( door locked )Issued Dec 4, 2003 · fix by Dec 15, 2003 overdue · Violation #4784263
- CBroken doors or locksProvide ready access to buildings heating system door locked to cellar,1story at public hallIssued Nov 28, 2000 · fix by Dec 9, 2000 overdue · Violation #3669164
- COther repairsMake safe by properly repairing the structural defect cracked brickworks northwest roof building front dob 3050341Issued Oct 1, 1996 · fix by Oct 21, 1996 overdue · rent impairing · Violation #1378308
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.