Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Remsen Village

556 East 94 Street, Brooklyn

11236 · 6 apartments · 3 stories · City Council district 42

By · Updated · Data from NYC HPD

C
54open immediately hazardous violations · 900 per 100 apartments
B87Hazardous, open
A17Non-hazardous, open
!133Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company556E 94TH STREET PARTNERS LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Broken doors or locks
    32
  2. Other repairs
    31
  3. Peeling paint and plaster
    24
  4. Mice or rats
    16
  5. Leaks and water damage
    15
  6. Missing smoke or CO detector
    10
  7. Roaches
    9
  8. Lead paint
    8
  9. Mold
    7
  10. Plumbing, sinks and toilets
    2
  11. Missing window guards
    2
  12. No heat or hot water
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C134 days
from 45 closed · NYC typical: 87 days
B98 days
from 11 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksProperly repair or replace the broken or defective loose and dislodged mortise locking device at door , west wall in the entranceIssued Nov 16, 2026 · Violation #19374034
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at northIssued Nov 16, 2026 · Violation #19374033
  • B
    Other repairsRemove all encumbrances consisting of aluminum a-framed ladder at south wall at public hall, 1st storyIssued Nov 16, 2026 · rent impairing · Violation #19374054
  • B
    Other repairsProperly repair or replace the broken or defective detached iron fence with protruded and exposed iron bar, at building front yardIssued Nov 16, 2026 · Violation #19374053
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Nov 16, 2026 · Violation #19374032
  • B
    Other repairsProperly repair with similar material the broken or defective cracked brick wall and mortar veneer with deteriorated and missing mortar at joints , 3rd story ,…Issued Nov 16, 2026 · Violation #19374052
  • B
    Other repairsReplace with new the missing guardrail and handrail at stair below grade , building front yardIssued Nov 16, 2026 · Violation #19374051
  • B
    Other repairsProperly repair with similar material the broken or defective cracked ceramic floor tiles at public hall, 1st storyIssued Nov 16, 2026 · Violation #19374050
  • C
    Other repairsProperly repair or replace the broken or defective cracked glass at, lower sash window to, south wall , at public hall, 1st storyIssued Nov 16, 2026 · Violation #19374049
  • B
    Other repairsProperly repair with similar material the broken or defective cracked wood floor planks in the 1st room from east at southIssued Nov 16, 2026 · Violation #19374048
  • B
    Other repairsProperly repair with similar material the broken or defective cracked wood floor plank in the 2nd room from east at northIssued Nov 16, 2026 · Violation #19374047
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at northIssued Nov 16, 2026 · Violation #19374046
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor with open joints in the 1st room from east at northIssued Nov 16, 2026 · Violation #19374045
  • B
    Other repairsProperly repair with similar material the broken or defective crcaked ceramic tiles at north wall in the bathroomIssued Nov 16, 2026 · Violation #19374044
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze the porcelain paint at, bathtub , north wall , in the bathroomIssued Nov 16, 2026 · Violation #19374041
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 16, 2026 · Violation #19374039
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 16, 2026 · Violation #19374038
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 16, 2026 · Violation #19374037
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 16, 2026 · Violation #19374036
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 16, 2026 · Violation #19374035
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19370706
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at lower window sash at 1st window from east at south creating cut hazard at public hall, 1st…Issued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19293442
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at window frame at north wall in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19289774
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19166669
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19099801
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19099802
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19095461
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2026 · fix by Aug 7, 2026 overdue · Violation #19078924
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2026 · fix by Aug 7, 2026 overdue · Violation #19078927
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2026 · fix by Aug 7, 2026 overdue · Violation #19078926
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2026 · fix by Aug 7, 2026 overdue · Violation #19078925
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty mechanical lock at building entrance door , 1st storyIssued Jul 13, 2026 · fix by Jul 19, 2026 overdue · Violation #19053188
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19065873
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 13, 2026 · fix by Aug 8, 2026 overdue · Violation #19065874
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at entrance to building at public hall, 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19065877
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Jul 13, 2026 · fix by Jul 19, 2026 overdue · Violation #19065876
  • B
    Broken doors or locksProperly repair or replace the broken or defective locking assembly at door in the entranceIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065875
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door to building at public hall, 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19065878
  • B
    Other repairsProperly secure the loose hand rail at north at public hall stairs, 1st storyIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065870
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19059615
  • B
    Broken doors or locksProperly repair or replace the broken or defective door knob at building front entrance door , 1st storyIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057367
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and latch set at door in the entranceIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057364
  • B
    Other repairsProperly secure the loose handrail at north at public hall stairs, 1st storyIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057365
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock and latch set at building front entrance door , 1st storyIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19057366
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 7, 2026 · fix by Aug 2, 2026 overdue · Violation #19053183
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of ants in the entire apartmentIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19053184
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · rent impairing · Violation #19053185
  • C
    Lead paintProvide ready access to buildings heating system locked door leading to cellar at boiler roomIssued Jul 7, 2026 · fix by Jul 13, 2026 overdue · Violation #19053186
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at northIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19053187
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 7, 2026 · fix by Aug 2, 2026 overdue · Violation #19053182
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18998131
  • B
    Broken doors or locksProperly repair or replace the broken or defective mail box lock for unit 3 at west wall in vestibule at public hall, 1st storyIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18998133
  • B
    Other repairsProperly secure the loose hand rail at west at public hall stairs, 1st storyIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18998134
  • B
    Broken doors or locksReplace with new the missing door knob and building front entrance door , 1st storyIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18998135
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 11, 2026 · fix by Jul 7, 2026 overdue · Violation #18998130
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 22, 2026 · fix by Jun 17, 2026 overdue · Violation #18948340
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued May 22, 2026 · fix by Jun 17, 2026 overdue · Violation #18948341
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lockset and its assemblies at the building 's entrance door , 1st storyIssued May 22, 2026 · fix by Jun 26, 2026 overdue · Violation #18948342
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and at west wall in the 1st room from east at northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18811662
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18811661

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

182018
582019
242020
472021
322022
132023
412024
482025
912026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 420 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.