Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Remsen Village

36 East 95 Street, Brooklyn

11212 · 4 apartments · 2 stories · City Council district 41

By · Updated · Data from NYC HPD

C
40open immediately hazardous violations · 1,000 per 100 apartments
B54Hazardous, open
A34Non-hazardous, open
!128Past the fix-by date

17 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyLOANCARE
Landlord (head officer or owner)Colleen Mcentee

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    29
  2. Broken doors or locks
    26
  3. Other repairs
    25
  4. Leaks and water damage
    14
  5. Missing smoke or CO detector
    11
  6. Bedbugs
    6
  7. Mice or rats
    5
  8. No heat or hot water
    5
  9. Mold
    4
  10. Roaches
    3
  11. Electrical problems
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C86 days
from 18 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at vestibuleIssued Aug 25, 2025 · fix by Sep 8, 2025 overdue · Violation #18180925
  • C
    Broken doors or locksRemove the illegal fastening consisting of key operated double cylinder lock installed at building entrance doorIssued Aug 25, 2025 · fix by Aug 31, 2025 overdue · rent impairing · Violation #18180932
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Aug 25, 2025 · fix by Aug 31, 2025 overdue · Violation #18180933
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at light fixture at ceiling at public hall, 2nd storyIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18180926
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 2nd storyIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17545603
  • B
    Other repairsProperly repair with similar material the broken or defective ceiling with fire retardant material at public hall, 2nd storyIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · Violation #17545605
  • C
    Broken doors or locksRemove the illegal fastening key operated double cylinder lock at front entrance door to building , 1st storyIssued Dec 12, 2024 · fix by Dec 18, 2024 overdue · rent impairing · Violation #17545607
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basementIssued Dec 12, 2024 · fix by Dec 18, 2024 overdue · Violation #17545602
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 2nd storyIssued Dec 12, 2024 · fix by Jan 16, 2025 overdue · rent impairing · Violation #17545604
  • B
    Other repairsProperly repair with similar material the broken or defective wood tread 1st from bottom at intermediate landing at public hall stairs, 2nd storyIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16642670
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16642671
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16642672
  • B
    MoldTrace and repair the source and abate the visible mold condition approx., 1 square foot, on the ceiling and south wall. in the bathroomIssued Jun 15, 2023 · fix by Jul 20, 2023 overdue · Violation #16046109
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 2 square feet at ceiling and approximately 3 square feet at west wall in the…Issued May 12, 2023 · fix by Jun 16, 2023 overdue · Violation #15984738
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective at apartment in the entranceIssued Apr 14, 2023 · fix by Apr 28, 2023 overdue · Violation #15926727
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926713
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926706
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling and west wall approxiamately 12 square feet in the bathroomIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926703
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926721
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926704
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Apr 14, 2023 · fix by May 19, 2023 overdue · Violation #15926722
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basementIssued Mar 20, 2023 · fix by Mar 26, 2023 overdue · Violation #15788386
  • C
    Broken doors or locksRemove the illegal fastening consisting of double cylinder lock on building entrance door at public hall, 1st storyIssued Mar 20, 2023 · fix by Mar 26, 2023 overdue · rent impairing · Violation #15788387
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Mar 16, 2023 · fix by Mar 22, 2023 overdue · Violation #15774837
  • B
    Other repairsProperly repair with similar material the broken or defective wood tread, 3rd up from bottom at public hall stairs, 1st storyIssued Mar 16, 2023 · fix by Apr 20, 2023 overdue · Violation #15774827
  • B
    Other repairsProperly repair with similar material the broken or defective wood tread, 2nd down from top at public hall stairs, 1st storyIssued Mar 16, 2023 · fix by Apr 20, 2023 overdue · Violation #15774828
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall stairs, 2nd storyIssued Mar 16, 2023 · fix by Apr 20, 2023 overdue · rent impairing · Violation #15774833
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling at roof bulkhead at public hall stairs, 2nd storyIssued Mar 16, 2023 · fix by Apr 20, 2023 overdue · rent impairing · Violation #15774829
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748961
  • B
    Broken doors or locksReplace with new the broken or defective door in the entranceIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748956
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at window recess in the 1st room from eastIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748963
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from eastIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748962
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyerIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748957
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door locked at basementIssued Mar 2, 2023 · fix by Mar 8, 2023 overdue · Violation #15748959
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at criling in the kitchenIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748960
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north at westIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748958
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the entire apartmentIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748955
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748954
  • B
    MoldTrace and repair the source and abate the visible mold condition approxmaitaly 10 square feet at west wall in the bathroomIssued Mar 2, 2023 · fix by Apr 6, 2023 overdue · Violation #15748953
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at public hall, 1st storyIssued Feb 28, 2023 · fix by Mar 6, 2023 overdue · Violation #15739183
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Feb 16, 2023 · fix by Feb 22, 2023 overdue · Violation #15710130
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Feb 15, 2023 · fix by Mar 1, 2023 overdue · Violation #15722265
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 15, 2023 · fix by Mar 13, 2023 overdue · Violation #15722264
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 15, 2023 · fix by Mar 13, 2023 overdue · Violation #15722263
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Feb 15, 2023 · fix by Feb 21, 2023 overdue · Violation #15722262
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 9, 2023 · fix by Feb 9, 2023 overdue · rent impairing · Violation #15710129
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from eastIssued Feb 3, 2023 · fix by Feb 3, 2023 overdue · rent impairing · Violation #15698754
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 3, 2023 · fix by Feb 9, 2023 overdue · Violation #15698755
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at sink cabinet in the kitchenIssued Jan 26, 2023 · fix by Mar 2, 2023 overdue · Violation #15680256
  • C
    Broken doors or locksProvide ready access to buildings heating system at 1st story east 1 door locked , 1st storyIssued Jan 26, 2023 · fix by Feb 1, 2023 overdue · Violation #15680252
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from eastIssued Jan 26, 2023 · fix by Jan 26, 2023 overdue · rent impairing · Violation #15680251
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Jan 26, 2023 · fix by Mar 2, 2023 overdue · Violation #15680254
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jan 26, 2023 · fix by Mar 2, 2023 overdue · Violation #15680255
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling in the bulkhead at 2nd story public hall stairs at public hall…Issued Jan 23, 2023 · fix by Feb 27, 2023 overdue · Violation #15671318
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 2nd storyIssued Jan 23, 2023 · fix by Feb 27, 2023 overdue · rent impairing · Violation #15671320
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Jan 23, 2023 · fix by Jan 29, 2023 overdue · Violation #15671315
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd storyIssued Jan 23, 2023 · fix by Feb 27, 2023 overdue · Violation #15671321
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked to boiler room at cellarIssued Jan 20, 2023 · fix by Jan 26, 2023 overdue · Violation #15664428
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from east at southIssued Jan 17, 2023 · fix by Jan 16, 2023 overdue · rent impairing · Violation #15664427
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Jan 12, 2023 · fix by Jan 18, 2023 overdue · Violation #15657064

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12021
172022
1022023
112024
102025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 161 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.