Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Remsen Village

352 East 96 Street, Brooklyn

11212 · 4 apartments · 2 stories · City Council district 41

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 400 per 100 apartments
B52Hazardous, open
A30Non-hazardous, open
!89Past the fix-by date

11 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyTHOY RESIDENCE TRUST

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    21
  2. Broken doors or locks
    20
  3. Peeling paint and plaster
    17
  4. Missing smoke or CO detector
    11
  5. Leaks and water damage
    9
  6. Plumbing, sinks and toilets
    8
  7. Mice or rats
    4
  8. Roaches
    4
  9. Bedbugs
    2
  10. Mold
    1
  11. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C164 days
from 2 closed · NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at bulkhead at public hall, 2nd storyIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19251772
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead at public hall, 2nd storyIssued Oct 5, 2026 · fix by Oct 19, 2026 overdue · Violation #19251771
  • B
    Leaks and water damageRepair the roof so that it will not leak at skylight at public hall, 2nd storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19251773
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste pipes of the bathtub drainage, in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19232634
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor tiles, in the 1st room from east at northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232625
  • B
    Other repairsRemove all encumbrances consisting of plants pot and wood ladder free standing at the landing floor, at 1st public hall bulkhead from north at center, 2nd storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19232643
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19232624
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232623
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the north and east walls, in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232622
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 25, 2026 · fix by Oct 21, 2026 overdue · Violation #19232621
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges springs at the front entrance to building, , 1st storyIssued Sep 25, 2026 · fix by Oct 9, 2026 overdue · Violation #19232644
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles, in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232630
  • B
    Other repairsProperly secure the loose wood tread 8th from bottom up, at public hall stairs, 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232647
  • B
    Other repairsRemove all encumbrances consisting of refrigerator free standing on the floor, at public hall, 2nd storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19232642
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges springs, in the entranceIssued Sep 25, 2026 · fix by Oct 9, 2026 overdue · Violation #19232637
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges springs at the east entrance to vestibule, at public hall, 1st storyIssued Sep 25, 2026 · fix by Oct 9, 2026 overdue · Violation #19232638
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232636
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232635
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste pipes of the drainages at wash basin 1st from west at north in the bathroomIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19232633
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east wall, in the 1st room from east at northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232629
  • B
    Broken doors or locksProperly secure the loose wood door 4th from south at west of the base cabinet at west , in the kitchenIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232627
  • B
    Broken doors or locksProperly secure the loose doors at 3rd wall cabinets from south at west, in the kitchenIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19232626
  • B
    Other repairsRemove all encumbrances consisting of refrigirator at public hall, 2nd storyIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19194035
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 5, 2026 · fix by Jul 1, 2026 overdue · Violation #18979833
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd room from eastIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979840
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979839
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979838
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979837
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979836
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from east at northIssued Jun 5, 2026 · fix by Jul 10, 2026 overdue · Violation #18979835
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 5, 2026 · fix by Jul 1, 2026 overdue · Violation #18979834
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 5, 2026 · fix by Jun 19, 2026 overdue · Violation #18979841
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16143477
  • B
    Broken doors or locksProperly repair or replace the broken or defective wooden door in the 4th room from east at southIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143470
  • B
    Broken doors or locksReplace with new the missing door knob at door in the entranceIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143472
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entranceIssued Aug 7, 2023 · fix by Aug 21, 2023 overdue · Violation #16143471
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143463
  • B
    Plumbing, sinks and toiletsProperly secure the loose sink and counter top in the kitchenIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143464
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wooden base cabinet at wash basin in the bathroomIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143466
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143467
  • B
    Broken doors or locksProperly repair or replace the broken or defective wooden door and door knob in the bathroomIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143468
  • B
    Broken doors or locksProperly repair or replace the broken or defective wooden door in the 4th room from east at northIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143469
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartmentIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16143474
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 7, 2023 · fix by Sep 2, 2023 overdue · Violation #16143478
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396116
  • B
    Plumbing, sinks and toiletsReplace with new the broken or defective base cabinet at sink in the kitchenIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396108
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396109
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396110
  • B
    Plumbing, sinks and toiletsReplace with new the broken or defective wood counter top at sink in the kitchenIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396112
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 3, 2022 · fix by Oct 29, 2022 overdue · Violation #15396113
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · Violation #15396115
  • B
    Plumbing, sinks and toiletsReplace the broken or defective at wash basin in the bathroomIssued Oct 3, 2022 · fix by Nov 7, 2022 overdue · rent impairing · Violation #15396117
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 29, 2022 · fix by Apr 24, 2022 overdue · Violation #15068277
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 29, 2022 · fix by Apr 24, 2022 overdue · Violation #15068275
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchenIssued Nov 30, 2018 · fix by Jan 4, 2019 overdue · Violation #12777983
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Nov 30, 2018 · fix by Jan 4, 2019 overdue · Violation #12777919
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Nov 30, 2018 · fix by Jan 4, 2019 overdue · Violation #12777927
  • C
    Broken doors or locksProvide ready access to buildings heating system door lockedat cellar at cellarIssued Nov 30, 2018 · fix by Dec 8, 2018 overdue · Violation #12778024
  • B
    Other repairsReplace with new the broken or defective radiator air valves in the entire apartmentIssued Jan 22, 2018 · fix by Feb 26, 2018 overdue · Violation #12201235
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rulesIssued Jan 22, 2018 · fix by Feb 26, 2018 overdue · Violation #12201244

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42017
92018
12021
182022
212023
12024
12025
492026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 176 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.