Housing violations · Washington Heights (North)
45 Thayer Street, Manhattan
10040 · 53 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs6
- Plumbing, sinks and toilets3
- Mold3
- Mice or rats3
- Roaches2
- Missing smoke or CO detector2
- Lead paint1
- Peeling paint and plaster1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 33 closed · NYC typical: 87 days
from 49 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste line at wash basin in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19367921
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yardIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18808164
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18803403
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at east wall in the bathroomIssued Mar 18, 2026 · fix by Apr 22, 2026 overdue · Violation #18714995
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued Dec 23, 2025 · fix by Jan 27, 2026 overdue · Violation #18524069
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 20, 2025 · fix by Dec 14, 2025 overdue · Violation #18405321
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 19, 2025 · fix by Dec 15, 2025 overdue · Violation #18377841
- BOther repairsProperly repair or replace the broken or defective wood floor in the 4th room from eastIssued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18377845
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18377844
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 19, 2025 · fix by Dec 24, 2025 overdue · Violation #18377843
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 19, 2025 · fix by Dec 15, 2025 overdue · Violation #18377842
- CPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel reglaze of the bathtub in the bathroomIssued Nov 10, 2025 · fix by Nov 16, 2025 overdue · Violation #18354947
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18268132
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 10, 2025 · fix by Oct 6, 2025 overdue · rent impairing · Violation #18208658
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from northIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933780
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd private hallway from northIssued Jun 4, 2025 · fix by Jul 9, 2025 overdue · Violation #17933781
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq fts at south wall in the bathroomIssued Nov 19, 2024 · fix by Dec 24, 2024 overdue · Violation #17426810
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Jul 29, 2024 · fix by Aug 4, 2024 overdue · Violation #17138439
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 16, 2024 · fix by Aug 11, 2024 overdue · Violation #17110958
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 6, 2021 · fix by Sep 1, 2021 overdue · Violation #14472774
- BMoldTrace and repair the source and abate the visible mold condition approximately 12 square feet at ceiling in the 1st room from north at eastIssued Mar 1, 2021 · fix by Apr 5, 2021 overdue · Violation #13994008
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.