Housing violations · Crown Heights (North)
1193 Eastern Parkway, Brooklyn
11213 · 16 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint8
- Other repairs3
- Electrical problems3
- Mold2
- Mice or rats2
- Peeling paint and plaster2
- Roaches2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 54 closed · NYC typical: 87 days
from 44 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition less than 3 sqft around bathtub in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19370697
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Aug 10, 2026 · fix by Sep 3, 2026 overdue · Violation #19133429
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Aug 10, 2026 · fix by Sep 3, 2026 overdue · Violation #19133428
- COther repairs& 309 m/d law abate the nuisance consisting of air conditioner obstructing egress at fire escape 2nd window from east at south wall in the 6th room from northIssued Aug 4, 2026 · fix by Aug 10, 2026 overdue · Violation #19122565
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of at ceiling in the 1st room from north at westIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · Violation #19065286
- BOther repairsProperly repair or replace the broken or defective missing light fixture at ceiling in the 1st room from north at westIssued Jun 24, 2026 · fix by Jul 29, 2026 overdue · Violation #19020690
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at north and east wall in the 1st room from north at westIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18352170
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 26, 2025 · fix by Sep 21, 2025 overdue · Violation #18187715
- CPlumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued Jul 7, 2025 · fix by Jul 13, 2025 overdue · rent impairing · Violation #18079071
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17663555
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 3, 2025 · fix by Mar 1, 2025 overdue · Violation #17663559
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 3, 2025 · fix by Mar 1, 2025 overdue · Violation #17663558
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures elecric outlet west wall in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17663554
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures electric outlet south wall in the 2nd room from northIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17663557
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchenIssued Feb 3, 2025 · fix by Mar 10, 2025 overdue · Violation #17663556
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Nov 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16363006
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Nov 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16363007
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Apr 17, 2023 · fix by May 11, 2023 overdue · Violation #15933848
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 17, 2023 · fix by May 11, 2023 overdue · Violation #15928726
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Mar 31, 2023 · fix by Apr 24, 2023 overdue · Violation #15895566
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Dec 27, 2021 · fix by Jan 20, 2022 overdue · Violation #14756101
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2021 · fix by Oct 17, 2021 overdue · Violation #14566556
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.