Housing violations · Crown Heights (South)
1196 Eastern Parkway, Brooklyn
11213 · 75 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint53
- Other repairs25
- Peeling paint and plaster22
- Broken doors or locks11
- Leaks and water damage10
- Plumbing, sinks and toilets8
- Mold7
- Missing smoke or CO detector6
- Roaches5
- Mice or rats2
- Electrical problems2
- Missing window guards1
- No heat or hot water1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 46 closed · NYC typical: 87 days
from 167 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 4th story, section ''c'', at northwestIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19372069
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th story, section ''a'', at northeastIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19372066
- CLeaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 4th story, section ''a'', at northeastIssued Nov 13, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19372065
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 4th story, section ''d'', at southwestIssued Nov 13, 2026 · fix by Nov 27, 2026 · Violation #19372068
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277437
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277436
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277435
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275068
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275065
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275063
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275084
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274457
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275062
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275059
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274453
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275060
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275049
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19275047
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274489
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274514
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 1st room from northIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275080
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19274463
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19275076
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the bathroomIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19275074
- BBroken doors or locksReplace with new the missing glass pane at rear yard door at public hall, 1st story, section ''east''Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218026
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19218020
- BOther repairsRemove all encumbrances consisting of household items at public hall, 1st story, section ''east''Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · rent impairing · Violation #19218024
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of cracked glass pane at rear yard door at public hall, 1st story, section ''east''Issued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19218025
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218010
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218011
- BOther repairsReplace with new the missing escutcheon plate at top and bottom riser in the 2nd room from eastIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218017
- BOther repairsRemove all encumbrances consisting of household items at public hall, 1st story, section ''west''Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · rent impairing · Violation #19218022
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218012
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218027
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective glazing at bathtub in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967004
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective glazing at bathtub in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18967002
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at fire door leading to south yard , 1st storyIssued May 5, 2026 · fix by May 19, 2026 overdue · Violation #18850260
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18535378
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18535379
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2025 · fix by Dec 1, 2025 overdue · Violation #18358939
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2025 · fix by Dec 1, 2025 overdue · Violation #18358940
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2025 · fix by Dec 1, 2025 overdue · Violation #18358941
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 7, 2025 · fix by Dec 1, 2025 overdue · Violation #18358942
- BElectrical problemsProperly secure the loose electrical outlet cover at west wall in the 2nd room from eastIssued Jun 30, 2025 · fix by Aug 4, 2025 overdue · Violation #18063824
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918445
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchenIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17918447
- BBroken doors or locksProperly repair or replace the broken or defective rubber gaskets at refrigerator and freezer doors in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17893476
- CBroken doors or locksRemove device preventing door from being self-closing permanently installed sweep at door preventing it from being self closing in the entranceIssued May 19, 2025 · fix by Jun 2, 2025 overdue · Violation #17893479
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north and west walls in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17893475
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at sink in the kitchenIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17893474
- CPlumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued Jan 23, 2025 · fix by Jan 29, 2025 overdue · rent impairing · Violation #17641698
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17388914
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17397864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17397862
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17397860
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and west walls in the 1st room from northIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17397863
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 13, 2024 · fix by Oct 9, 2024 overdue · Violation #17265856
- BMoldTrace and repair the source and abate the visible mold condition less than 20 sq ft at the east wall in the 1st room from north at eastIssued Sep 13, 2024 · fix by Oct 18, 2024 overdue · Violation #17265843
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 2, 2024 · fix by May 2, 2024 overdue · rent impairing · Violation #16942400
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at east wall and ceiling in the private hallwayIssued Oct 4, 2023 · fix by Nov 8, 2023 overdue · Violation #16289431
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.