Housing violations · Crown Heights (North)
255 Eastern Parkway, Brooklyn
11238 · 90 apartments · 6 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint104
- Peeling paint and plaster87
- Other repairs34
- Broken doors or locks27
- Leaks and water damage19
- Missing smoke or CO detector12
- Mold9
- Electrical problems7
- Plumbing, sinks and toilets6
- Mice or rats5
- Missing window guards4
- Roaches4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 19 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 5th bathroom from north at eastIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18613929
- BMoldTrace and repair the source and abate the visible mold condition at less than 10 sqft all walls and ceiling in the 4th bathroom from north at centerIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18591110
- BMoldTrace and repair the source and abate the visible mold condition at approximately 3sqft west wall in the 1st bathroom from northIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18306784
- BMoldTrace and repair the source and abate the visible mold condition at less than 10 sqft south wall in the 1st bathroom from northIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18306783
- BMoldTrace and repair the source and abate the visible mold condition at less than 10 sqft ceiling in the 1st bathroom from northIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18306785
- BMoldTrace and repair the source and abate the visible mold condition at, less than 10sfqt , north wall in the 1st bathroom from northIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18306781
- BMoldTrace and repair the source and abate the visible mold condition at less than 10 sqft east wall in the 1st bathroom from northIssued Oct 15, 2025 · fix by Nov 19, 2025 overdue · Violation #18306782
- CBroken doors or locksProperly repair or replace the broken or defective glass pane at door in the 3rd room from northIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18281933
- COther repairsProperly repair with similar material the broken or defective ceramic wall tiles at all walls in the bathroomIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18281932
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet at east and north wall in the foyerIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281925
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281924
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18281923
- COther repairsProperly repair with similar material the broken or defective hardwood floors in the private hallwayIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18281921
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the 5th room from north at westIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281920
- BElectrical problemsProperly repair or replace the broken or defective electrical light switch at north in the 5th room from north at westIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281919
- BLeaks and water damageRepair the leaky and/or defective faucets at sink at north in the kitchenIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281930
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at westIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281929
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north at westIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18281928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 5th room from north at centerIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281917
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north at centerIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281916
- BBroken doors or locksRefit wood door in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281922
- BOther repairsProperly repair or replace the broken or defective wood base cabinet at north in the kitchenIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281931
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the 5th room from north at westIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281927
- BOther repairsProperly repair with similar material the broken or defective wood base cabinet at west in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18281926
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243692
- BMoldTrace and repair the source and abate the visible mold condition at ,east closet walls greater than 10 sqft in the foyerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243677
- BPeeling paint and plasterProperly repair with similar material the broken or defective cracked fire retardant materials, plaster at ceiling at building 's northwest section at public…Issued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18246123
- BBroken doors or locksProperly secure the loose wood door saddle at north wall in the 5th room from north at centerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243686
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 5th room from north at westIssued Sep 23, 2025 · fix by Sep 29, 2025 overdue · Violation #18243688
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color cracked plaster at, west, east walls and ceiling in the 4th bathroom from north…Issued Sep 23, 2025 · fix by Sep 29, 2025 overdue · Violation #18243680
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from north at centerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243687
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ,east closet walls in the foyerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243676
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze the porcelain paint at bathtub , west wall, in the 4th bathroom from north at centerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243675
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet , at east wall, in the 4th room from north at westIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243674
- BElectrical problemsProperly repair or replace the broken or defective electrical light switch at east wall in the 4th room from north at westIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243673
- BOther repairsProperly repair or replace the broken or defective spring balances at lower window sash to fire escape , south wall , in the 5th room from north at eastIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18246121
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th bathroom from north at centerIssued Sep 23, 2025 · fix by Sep 29, 2025 overdue · Violation #18243681
- BBroken doors or locksProperly repair and abate unsafe electric wiring condition consisting of unlocked fuse box with exposed wires at west wall in the foyerIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243678
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from north at eastIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243698
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243697
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 23, 2025 · fix by Oct 19, 2025 overdue · Violation #18243691
- BBroken doors or locksProperly repair or replace the broken or defective loose knob at door to north wall in the 5th room from north at westIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243690
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from north at westIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243689
- BBroken doors or locksRefit the wood door at south wall in the 4th room from north at eastIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243696
- BOther repairsProperly repair with similar material the broken or defective rotten wood floor in the 4th room from north at eastIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243694
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243693
- BBroken doors or locksReplace with new the missing glass panes at french door at south wall in the 4th room from north at eastIssued Sep 23, 2025 · fix by Oct 28, 2025 overdue · Violation #18243695
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak fire retardant materials plaster ceiling in the 4th bathroom from north at centerIssued Jun 17, 2025 · fix by Jun 23, 2025 overdue · Violation #18014748
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 17, 2025 · fix by Jul 11, 2025 overdue · Violation #18043519
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 17, 2025 · fix by Jul 11, 2025 overdue · Violation #18043518
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at 2nd window frame from east at south wall in the 5th room from north at eastIssued Jun 17, 2025 · fix by Jun 23, 2025 overdue · Violation #18014759
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Jun 17, 2025 · fix by Jun 23, 2025 overdue · Violation #18014755
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jun 17, 2025 · fix by Jul 11, 2025 overdue · Violation #18043512
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak 583 ceiling in the 4th bathroom from north at centerIssued Jun 17, 2025 · fix by Jun 23, 2025 overdue · Violation #18014747
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18014790
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 4th bathroom from north at centerIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014745
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 4th room from north at eastIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014765
- BBroken doors or locksProperly repair or replace the broken or defective locking device at door in the entranceIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014784
- BOther repairsProperly repair or replace the broken or defective ceiling light fixture in the 2nd room from northIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014786
- BBroken doors or locksProperly repair and abate unsafe electric wiring condition consisting of unlocked defunct fuse box with exposed electrical wires at west wall in the foyerIssued Jun 17, 2025 · fix by Jul 22, 2025 overdue · Violation #18014787
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.