Housing violations · Crown Heights (North)
481 Eastern Parkway, Brooklyn
11216 · 17 apartments · 4 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
4 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster17
- Other repairs9
- Mice or rats6
- Lead paint5
- Roaches4
- Mold3
- Leaks and water damage2
- Broken doors or locks2
- Missing smoke or CO detector2
- Bedbugs1
- Plumbing, sinks and toilets1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 41 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 6, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19276779
- BOther repairsRefit lower sash window at south wall in the 1st room from east at southIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19259435
- BBedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249273
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from east at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249274
- BOther repairsProperly repair or replace the broken or defective lower sash at 2nd window at south in the 2nd room from east at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249275
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in washbasin at east wall in the bathroomIssued May 1, 2026 · fix by Jun 5, 2026 overdue · rent impairing · Violation #18827159
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18745516
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Mar 18, 2026 · fix by Apr 22, 2026 overdue · Violation #18705471
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Mar 18, 2026 · fix by Apr 22, 2026 overdue · Violation #18705470
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Mar 18, 2026 · fix by Mar 24, 2026 overdue · Violation #18705469
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18705868
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704790
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at westIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704786
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704787
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at eastIssued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704788
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 16, 2026 · fix by Apr 20, 2026 overdue · Violation #18704789
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18469708
- BOther repairsReplace with new the missing saddle in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18469707
- BBroken doors or locksProperly repair or replace the broken or defective corroded steel frame to bilco door , southeast section, building front yardIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18145118
- BPeeling paint and plasterProperly repair with similar material the broken or defective cracked ,spalled, fire retardant materials, plaster at ceiling at public hall, 4th storyIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18145120
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Aug 8, 2025 · fix by Sep 3, 2025 overdue · rent impairing · Violation #18145115
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Jul 23, 2025 · fix by Aug 27, 2025 overdue · Violation #18105009
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17799158
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from northIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17800028
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17800026
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, south wall in the 1st room from north at centerIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17800024
- BOther repairsProperly repair with similar material the broken or defective caulking around bath tub in the bathroomIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17799179
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17799176
- BOther repairsReplace the broken or defective bath tub in the bathroomIssued Mar 31, 2025 · fix by May 5, 2025 overdue · rent impairing · Violation #17799167
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17799157
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 31, 2025 · fix by Apr 24, 2025 overdue · Violation #17800115
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 31, 2025 · fix by Apr 24, 2025 overdue · Violation #17800094
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 31, 2025 · fix by Apr 24, 2025 overdue · Violation #17800093
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 31, 2025 · fix by Apr 24, 2025 overdue · Violation #17800092
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 31, 2025 · fix by Apr 24, 2025 overdue · Violation #17800091
- BOther repairsProperly repair with similar material the broken or defective fire retarded material at north wall at vestibule at public hall, 1st storyIssued Mar 28, 2025 · fix by May 2, 2025 overdue · Violation #17789376
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 24, 2025 · fix by Apr 19, 2025 overdue · Violation #17784059
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at east wall east wall in the bathroomIssued Feb 4, 2025 · fix by Mar 11, 2025 overdue · Violation #17676462
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17326268
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17326267
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17326269
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 8, 2024 · fix by Apr 3, 2024 overdue · Violation #16727522
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 8, 2024 · fix by Apr 3, 2024 overdue · Violation #16727521
- BMoldTrace and repair the source and abate the visible mold condition approx 20 sq ft at ceiling south and west wall in the bathroomIssued Oct 23, 2023 · fix by Nov 27, 2023 overdue · Violation #16328238
- BMoldTrace and repair the source and abate the visible mold condition approx 20 sq ft at ceiling south and west wall in the bathroomIssued Oct 23, 2023 · fix by Nov 27, 2023 overdue · Violation #16328240
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south wall in the kitchenIssued Jun 5, 2023 · fix by Jun 11, 2023 overdue · Violation #16015663
- BOther repairsProperly repair with similar material the broken or defective wooden floor at radiator in the 4th room from east at southIssued Jan 20, 2021 · fix by Feb 24, 2021 overdue · Violation #8304698
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.