Housing violations · Inwood
157 Vermilyea Avenue, Manhattan
10034 · 31 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Plumbing, sinks and toilets4
- Other repairs3
- Peeling paint and plaster2
- Broken doors or locks2
- Lead paint1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 46 closed · NYC typical: 87 days
from 51 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18757280
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18757281
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Mar 16, 2026 · fix by Mar 22, 2026 overdue · Violation #18680118
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at wash/basin in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18545091
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline pipe at wash/basin in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18545090
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective lower sink cabinet at east wall. in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18545088
- BPlumbing, sinks and toiletsRepair the broken or defective connection at wasteline underneath sink. in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18545089
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 5, 2026 · fix by Jan 19, 2026 overdue · Violation #18545092
- CLead paintProperly repair or replace the broken or defective glass pane at lower window sash at window leading to fire escape at public hall, 2nd storyIssued Oct 15, 2025 · fix by Oct 21, 2025 overdue · Violation #18294277
- BOther repairsProperly repair the broken or defective spring balance at lower window sash at south wall. in the 1st room from north at westIssued Mar 14, 2022 · fix by Apr 18, 2022 overdue · Violation #15000266
- BOther repairsProperly repair with similar material the broken or defective metal cornice at building front at roofIssued Jun 14, 2021 · fix by Jul 19, 2021 overdue · Violation #14340487
- BMoldTrace and repair the source and abate the visible mold condition approximately 10 square feet at south wall in the kitchenIssued Jun 9, 2021 · fix by Jul 14, 2021 overdue · Violation #14339837
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.