Housing violations · Washington Heights (North)
160 Wadsworth Avenue, Manhattan
10033 · 57 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
15 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster96
- Other repairs69
- Missing smoke or CO detector39
- Broken doors or locks23
- Leaks and water damage22
- Lead paint9
- Mold8
- Mice or rats7
- Plumbing, sinks and toilets6
- Electrical problems6
- Bedbugs3
- Roaches2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective north window frame in the 5th room from eastIssued Nov 15, 2023 · fix by Dec 20, 2023 overdue · Violation #16377715
- BBroken doors or locksProperly repair or replace the broken or defective closet door frame at south wall in the 5th room from eastIssued Nov 15, 2023 · fix by Dec 20, 2023 overdue · Violation #16377713
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 5th room from eastIssued Nov 15, 2023 · fix by Dec 20, 2023 overdue · Violation #16377714
- BOther repairsProperly repair or replace the broken or defective wood window trim at 2nd window from east at south wall in the 5th room from northIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246065
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246067
- BOther repairsProperly repair or replace the broken or defective closet frame at east wall in the 1st room from northIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246063
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246066
- BOther repairsProperly repair or replace the broken or defective window frame at west wall in the 1st room from northIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246062
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south wall in the 5th room from northIssued Sep 26, 2023 · fix by Oct 31, 2023 overdue · Violation #16246064
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Jan 21, 2022 · fix by Feb 25, 2022 overdue · rent impairing · Violation #14782916
- BLead paintProperly repair with similar material the broken or defective 1st marble tread from bottom at steps leading to roof at public hall, 6th storyIssued May 17, 2021 · fix by Jun 21, 2021 overdue · Violation #14343755
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in bulkhead area at public hall, 6th storyIssued May 17, 2021 · fix by Jun 21, 2021 overdue · rent impairing · Violation #14343739
- BOther repairsProperly repair with similar material the broken or defective fire retardant materail at ceili ng at public hall, 6th storyIssued May 17, 2021 · fix by Jun 21, 2021 overdue · Violation #14343749
- BOther repairsProperly repair with similar material the broken or defective 2nd marble tread from bottom at stairs in bulkhead at public hall, 6th storyIssued May 17, 2021 · fix by Jun 21, 2021 overdue · Violation #14344206
- BMoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at east and north walls. in the bathroomIssued Feb 28, 2020 · fix by Apr 3, 2020 overdue · Violation #13623874
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 4th bathroom from eastIssued Jan 28, 2020 · fix by Mar 3, 2020 overdue · Violation #13531424
- BLeaks and water damageRepair the leaky and/or defective faucets at bath tub in the 4th bathroom from eastIssued Jan 28, 2020 · fix by Mar 3, 2020 overdue · Violation #13531425
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jan 23, 2020 · fix by Feb 27, 2020 overdue · Violation #13530557
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north, east, south and west walls in the bathroomIssued Jan 23, 2020 · fix by Feb 27, 2020 overdue · Violation #13530558
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Jan 23, 2020 · fix by Feb 27, 2020 overdue · Violation #13530556
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color broken plaster at east wall in the 3rd bathroom from eastIssued Jan 15, 2020 · fix by Feb 19, 2020 overdue · Violation #13491519
- BOther repairsReplace with new the broken or defective ceramic tile at east wall in the 3rd bathroom from eastIssued Jan 15, 2020 · fix by Feb 19, 2020 overdue · Violation #13491518
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the 3rd bathroom from eastIssued Jan 15, 2020 · fix by Feb 19, 2020 overdue · Violation #13491520
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 5th room from eastIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491031
- BPlumbing, sinks and toiletsProperly repair the broken or defective base cabinet at wash basin in the bathroomIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491030
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491029
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491025
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 7, 2020 · fix by Jan 28, 2020 overdue · Violation #13491023
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491024
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 7, 2020 · fix by Jan 28, 2020 overdue · Violation #13491022
- BMoldTrace and repair the source and abate the visible mold condition at north wall in the bathroomIssued Jan 7, 2020 · fix by Feb 11, 2020 overdue · Violation #13491027
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling. in the bathroomIssued Oct 31, 2019 · fix by Dec 5, 2019 overdue · Violation #13323613
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from eastIssued Oct 31, 2019 · fix by Dec 5, 2019 overdue · Violation #13323611
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling. in the 5th room from eastIssued Oct 31, 2019 · fix by Dec 5, 2019 overdue · Violation #13323614
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroomIssued Oct 24, 2018 · fix by Nov 28, 2018 overdue · Violation #12698678
- COther repairsReplace with new the broken or defective wire glass at upper window sash at public hall stairs, 3rd storyIssued Oct 24, 2018 · fix by Nov 1, 2018 overdue · Violation #12698711
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 24, 2018 · fix by Nov 28, 2018 overdue · Violation #12698684
- BMoldTrace and repair the source and abate the nuisance consisting of mold 8 sq ft at ceiling and east wall in the bathroomIssued Oct 24, 2018 · fix by Nov 28, 2018 overdue · Violation #12698677
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from eastIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503378
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503386
- CLead paint& 309 m/d law abate the nuisance consisting of hasp and padlock installed at room exterior door leading to fire escape window in the 1st room from eastIssued Aug 1, 2018 · fix by Aug 9, 2018 overdue · Violation #12503379
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503385
- BBroken doors or locksArrange and make self-closing the doors in the entranceIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503384
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503383
- BBroken doors or locksReplace with new the broken or defective marble door saddle in the bathroomIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503382
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchenIssued Aug 1, 2018 · fix by Sep 5, 2018 overdue · Violation #12503380
- BOther repairsProperly repair with similar material the broken or defective fire retadrent material at ceiling and all walls north bulkhead at public hall, 6th storyIssued Jul 17, 2018 · fix by Aug 21, 2018 overdue · Violation #12480018
- BOther repairsProperly repair with similar material the broken or defective fire retadrent material at ceiling and all walls south bulkhead at public hall, 6th storyIssued Jul 17, 2018 · fix by Aug 21, 2018 overdue · Violation #12480016
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th storyIssued Jul 17, 2018 · fix by Aug 21, 2018 overdue · Violation #12480014
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th storyIssued Jul 17, 2018 · fix by Aug 21, 2018 overdue · Violation #12480013
- BOther repairsRemove all encumbrances consisting of construction material and tools at bulkhead at public hallIssued Aug 25, 2017 · fix by Sep 29, 2017 overdue · rent impairing · Violation #11942249
- BOther repairsReplace with new the broken or defective marble baseboard at east wall at bulkhead at public hallIssued Aug 25, 2017 · fix by Sep 29, 2017 overdue · Violation #11942255
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at bulkhead ceiling at public hallIssued Aug 25, 2017 · fix by Sep 29, 2017 overdue · Violation #11942242
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at bulkhead ceiling and all walls at public hallIssued Aug 25, 2017 · fix by Sep 29, 2017 overdue · Violation #11942245
- BOther repairsProperly repair the broken or defective intercom systemIssued Aug 14, 2017 · fix by Sep 18, 2017 overdue · Violation #11922515
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). ( defective)Issued Aug 14, 2017 · fix by Sep 18, 2017 overdue · Violation #11922554
- BPlumbing, sinks and toiletsSection 27-2005 adm code properly repair with similar material the broken or defective ceramic tiles at all walls at bathtub in the bathroomIssued Mar 31, 2016 · fix by May 5, 2016 overdue · Violation #11172060
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Sep 21, 2015 · fix by Oct 26, 2015 overdue · Violation #10866780
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed wires at ceiling in the bathroomIssued Sep 21, 2015 · fix by Oct 26, 2015 overdue · Violation #10866775
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color paint and plaster at ceiling in the bathroomIssued Sep 21, 2015 · fix by Oct 26, 2015 overdue · Violation #10866776
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.