Housing violations · Washington Heights (North)
371 Wadsworth Avenue, Manhattan
10040 · 41 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs22
- Mold12
- Roaches12
- Mice or rats10
- Peeling paint and plaster7
- Plumbing, sinks and toilets5
- Leaks and water damage4
- Lead paint4
- Missing smoke or CO detector2
- Broken doors or locks2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 55 closed · NYC typical: 87 days
from 122 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsProperly repair or replace the broken or defective marble balustrade at public hall stairs, 1st storyIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19332118
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346966
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346967
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from northIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327633
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327637
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color north wall back of sink counter in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327639
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327635
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327636
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19327634
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19327638
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at 2nd window head from east at north and east wall in the 3rd room from eastIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19200379
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936115
- BOther repairsProperly repair with similar material the broken or defective rotted wood floor in the 2nd room from eastIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936117
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft at east and south wall in the 6th room from eastIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18936119
- BLead paintProperly repair or replace the broken or defective spring balance at lower window sash 1st window from south at west wall, window leading to fire escape in the…Issued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936116
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of a key operated lock installed at the door to the room with fire escape window in the 6th room from eastIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18440401
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18473796
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north at eastIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18440412
- COther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18440413
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18343849
- COther repairs& 309 m/d law abate the nuisance consisting of air condition unit installed at window obstructing egress in the 2nd room from northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18343850
- BOther repairsProperly repair with similar material the broken or defective upper marble balustrade at public hall stairs, 1st storyIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18285689
- BLead paintProperly repair or replace the broken or defective latch set door leading to rear yard at public hall, 1st storyIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18208239
- BOther repairsFire escape defective. remove and replace with new the broken and defective bracket and leave all anchorages uncovered for inspection at 2nd story fire escape…Issued Aug 26, 2025 · fix by Sep 30, 2025 overdue · rent impairing · Violation #18183540
- BOther repairsProperly repair with similar material the broken or defective marble hand rail at public hall stairs, 1st storyIssued Aug 20, 2025 · fix by Sep 24, 2025 overdue · Violation #18170221
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18163184
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at ceiling and all walls in the 1st room from eastIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18163178
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed at door to fire escape window in the 5th room from eastIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18163370
- BMoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at north and west walls in the 2nd room from eastIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18163175
- BOther repairsProperly repair or replace the broken or defective mailbox at west at public hall, 1st storyIssued May 7, 2025 · fix by Jun 11, 2025 overdue · Violation #17876497
- BOther repairsProperly repair with similar material the broken or defective upper cabinet at west in the kitchenIssued May 7, 2025 · fix by Jun 11, 2025 overdue · Violation #17876491
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchenIssued May 7, 2025 · fix by Jun 11, 2025 overdue · Violation #17876492
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 7, 2025 · fix by Jun 2, 2025 overdue · Violation #17876506
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 7, 2025 · fix by Jun 2, 2025 overdue · Violation #17876507
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued May 7, 2025 · fix by Jun 11, 2025 overdue · Violation #17876490
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 7, 2025 · fix by Jun 2, 2025 overdue · Violation #17876509
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 7, 2025 · fix by Jun 2, 2025 overdue · Violation #17876510
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 8, 2025 · fix by May 4, 2025 overdue · Violation #17815986
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Feb 12, 2025 · fix by Mar 19, 2025 overdue · Violation #17692929
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2024 · fix by Nov 24, 2024 overdue · Violation #17380362
- BMoldTrace and repair the source and abate the visible mold condition approximately 15 sq at south wall in the kitchenIssued Apr 30, 2024 · fix by Jun 4, 2024 overdue · Violation #16934734
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 30, 2024 · fix by May 24, 2024 overdue · Violation #16939140
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 30, 2024 · fix by May 24, 2024 overdue · Violation #16939142
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles floor in the bathroomIssued Apr 22, 2024 · fix by May 27, 2024 overdue · Violation #16904481
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Apr 22, 2024 · fix by May 27, 2024 overdue · Violation #16904480
- BMoldTrace and repair the source and abate the visible mold condition approx 6 sq ft at north wall in the bathroomIssued Feb 7, 2024 · fix by Mar 13, 2024 overdue · Violation #16660937
- BMoldTrace and repair the source and abate the visible mold condition approx 3 sq.ft at ceiling and east wall in the bathroomIssued Feb 2, 2024 · fix by Mar 8, 2024 overdue · Violation #16652252
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at westIssued Oct 25, 2023 · fix by Nov 29, 2023 overdue · Violation #16329705
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at eastIssued Oct 25, 2023 · fix by Nov 29, 2023 overdue · Violation #16329706
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2023 · fix by Aug 15, 2023 overdue · Violation #16100363
- BPlumbing, sinks and toiletsReplace the broken or defective bathtub in the bathroomIssued May 18, 2023 · fix by Jun 22, 2023 overdue · rent impairing · Violation #15986117
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 18, 2023 · fix by Jun 13, 2023 overdue · Violation #15986135
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 18, 2023 · fix by Jun 13, 2023 overdue · Violation #15986134
- BMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 5 sqft ) and east wall ( approx 5 sqft) in the bathroomIssued Mar 30, 2023 · fix by May 4, 2023 overdue · Violation #15818339
- BMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 10 sqft ) and west wall ( approx 15 sqft ) in the foyerIssued Mar 30, 2023 · fix by May 4, 2023 overdue · Violation #15818335
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 2nd room from northIssued Mar 30, 2023 · fix by May 4, 2023 overdue · Violation #15818334
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx 10 sq.ft in the bathroomIssued Mar 14, 2023 · fix by Apr 18, 2023 overdue · Violation #15768292
- BMoldTrace and repair the source and abate the visible mold condition at west wall. approx 20 sq. ft in the foyerIssued Mar 8, 2023 · fix by Apr 12, 2023 overdue · Violation #15752289
- CMoldTrace and repair the source and abate the visible mold condition at west wall approx 20 sq.ft in the foyerIssued Mar 1, 2023 · fix by Mar 27, 2023 overdue · Violation #15754229
- BMoldTrace and repair the source and abate the visible mold condition at east wall approx sq.ft 6 in the bathroomIssued Jan 19, 2023 · fix by Feb 23, 2023 overdue · Violation #15675764
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.