Housing violations · Washington Heights (South)
81 Wadsworth Avenue, Manhattan
10033 · 47 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster33
- Other repairs24
- Leaks and water damage21
- Lead paint14
- Plumbing, sinks and toilets11
- Roaches11
- Mice or rats10
- Broken doors or locks6
- Mold4
- Missing smoke or CO detector4
- Electrical problems2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 66 closed · NYC typical: 87 days
from 145 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 3rd room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180715
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180713
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19180723
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19180729
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180720
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180721
- BOther repairsProperly repair with similar material the broken or defective hardwood floor in the private hallwayIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180696
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180704
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180701
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19180700
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19180698
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft. observed at ceiling and all walls in the bathroomIssued Sep 3, 2026 · fix by Sep 29, 2026 overdue · Violation #19180697
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180695
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the private hallwayIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19180694
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east and west walls in the 2nd room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180693
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180722
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and east walls in the 4th room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180719
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 2nd room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19180692
- COther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 3, 2026 · fix by Sep 9, 2026 overdue · Violation #19180711
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180717
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180724
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180725
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchenIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19180708
- BPlumbing, sinks and toiletsReplace the broken or defective washbasin in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19180662
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south and west walls in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180649
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180673
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180736
- BOther repairsProperly repair or replace the broken or defective intercom / bell buzzer from panel at building entrance to south wall in the private hallwayIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180733
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180674
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19180634
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180690
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19180689
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19180635
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 2nd room from north at eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · rent impairing · Violation #19180687
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180637
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180633
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180688
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180646
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19180675
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19162262
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall, north wall in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19162258
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 25, 2026 · fix by Sep 18, 2026 overdue · Violation #19166582
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Aug 25, 2026 · fix by Aug 31, 2026 overdue · Violation #19162263
- BOther repairsProperly repair or replace the broken or defective lower sash window pane at 1st window from north in the 2nd room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19152293
- BOther repairsProperly repair or replace the broken or defective lower sash window pane at east wall in the 4th room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19152294
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148927
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 20, 2026 · fix by Sep 15, 2026 overdue · Violation #19148926
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19135718
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19135721
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 7, 2026 · fix by Aug 31, 2026 overdue · Violation #19132048
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 7, 2026 · fix by Aug 31, 2026 overdue · Violation #19132050
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 2nd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · rent impairing · Violation #19122942
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19122943
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 4th room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · rent impairing · Violation #19122944
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sqft observed in the bathroomIssued Aug 5, 2026 · fix by Aug 31, 2026 overdue · Violation #19122955
- CLead paintReplace or repair the self-closing doors that is missing or defective hinge on door leading to inner court at public hall, 1st storyIssued Aug 5, 2026 · fix by Aug 19, 2026 overdue · Violation #19122906
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pot stored on 4th story balcony 1st stack…Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19122921
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 4th room from eastIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19122945
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19108505
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19102501
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.