Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bay Ridge

8220 Ft Hamilton Parkway, Brooklyn

11209 · 36 apartments · 4 stories · City Council district 47

By · Updated · Data from NYC HPD

C
50open immediately hazardous violations · 139 per 100 apartments
B156Hazardous, open
A49Non-hazardous, open
!211Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyFORT HAMILTON APARTMENTS LLC
Landlord (head officer or owner)Mitchell Shpelfogel

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    87
  2. Peeling paint and plaster
    56
  3. Broken doors or locks
    26
  4. Roaches
    17
  5. Leaks and water damage
    17
  6. Plumbing, sinks and toilets
    11
  7. Missing smoke or CO detector
    11
  8. Lead paint
    10
  9. Mice or rats
    8
  10. Mold
    5
  11. Missing window guards
    5
  12. Electrical problems
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C73 days
from 77 closed · NYC typical: 87 days
B77 days
from 170 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Other repairsRemove all encumbrances consisting of discarded tv set and furniture at public hall, 4th story, section at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19296738
  • B
    Other repairsRemove all encumbrances consisting of baby carriage at public hall at north , 2nd storyIssued Oct 15, 2026 · fix by Nov 19, 2026 · rent impairing · Violation #19294942
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the the floor, televisions , furnitures and garbages presented, at public…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19294943
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at the entrance door to inner court 1st from north at west, at public hall, 1st storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284364
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at entrance door to inner court 1st from north at west at public hall, 1st storyIssued Oct 13, 2026 · fix by Oct 27, 2026 overdue · Violation #19284363
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at northIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19268415
  • C
    Lead paintProvide ready access to buildings heating system no access to locked metal door leading to boiler at basement level, in center court at boiler roomIssued Oct 2, 2026 · fix by Oct 8, 2026 overdue · Violation #19268432
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19268397
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at southIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19268408
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at shower in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19251472
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10sqft less than 30sqft observed at south and west wall in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19251471
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 1st storyIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19242114
  • C
    Other repairsProperly repair or replace the broken or defective glass pane at north 1 window lower sash in the 3rd room from eastIssued Sep 24, 2026 · fix by Sep 30, 2026 overdue · Violation #19227821
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19227826
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19227825
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19227824
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19227823
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19227822
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at public hall at northwest , 4th storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19228966
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall at northwest , 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19228968
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19228971
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall at public hall, 1st storyIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19228970
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227810
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227808
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Sep 21, 2026 · fix by Oct 5, 2026 overdue · Violation #19227795
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling light fixture in the private hallwayIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227806
  • C
    Broken doors or locks& 309 m/d law abate the nuisance consisting of key operated lock installed at door to room with fire escape in the 4th room from northIssued Sep 21, 2026 · fix by Sep 27, 2026 overdue · Violation #19227812
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the 4th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227813
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, south and west walls in the 4th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19227814
  • C
    Broken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Sep 18, 2026 · fix by Sep 24, 2026 overdue · Violation #19227792
  • B
    Broken doors or locksProperly repair or replace the broken or defective door and sink basecabinet in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227830
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 4th story balcony at north building front at…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227303
  • B
    Other repairsRemove all encumbrances consisting of household items at stairs to bulkhead at public hall, 4th story, section at southIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · rent impairing · Violation #19227356
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19227717
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227724
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227744
  • B
    Other repairsProperly secure the loose ceiling light fixture in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227745
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 18, 2026 · fix by Oct 14, 2026 overdue · Violation #19227770
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19227841
  • B
    Other repairsProperly repair or replace the broken or defective radiator control knob in the 3rd room from eastIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227789
  • B
    Missing window guardsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes window guard at 2nd story balcony at north stack at west building…Issued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227301
  • B
    Other repairsProperly repair with similar material the broken or defective 1st, 6th & 8th marble treads from bottom at stairs at south section at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227351
  • B
    Other repairsProperly secure the loose hand rail at public hall stairs, 3rd story, section at southIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227353
  • B
    Other repairsProperly secure the loose railing at stairs to basement at north yardIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227306
  • B
    Other repairsProperly repair with similar material the broken or defective masonry at stairs to basement at north yardIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227309
  • B
    Other repairsProperly repair with similar material the broken or defective brick and mortar joints at east 1 window at 2nd & 3rd stories at north building front facadeIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227320
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227332
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227334
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door to inner court at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 2, 2026 overdue · Violation #19227342
  • B
    Other repairsProperly repair or replace the broken or defective outer glass pane at west wall window lower sash in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227752
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all ceilings and all walls in the entire apartmentIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227769
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227771
  • B
    Plumbing, sinks and toiletsProperly secure the loose countertop at sink base cabinet in the kitchenIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227772
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor panels in the foyerIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227773
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at southIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227775
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227329
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227777
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227781
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor panels in the private hallwayIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227782
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of carpet tack strips along walls at floor in the 2nd room from east at southIssued Sep 18, 2026 · fix by Oct 23, 2026 overdue · Violation #19227787

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1262017
822018
462019
502020
1722021
752022
792023
482024
372025
3642026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,191 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.