Housing violations · Bedford-Stuyvesant (West)
340 Gates Avenue, Brooklyn
11216 · 8 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs15
- Peeling paint and plaster12
- Leaks and water damage10
- Missing smoke or CO detector4
- Broken doors or locks4
- Lead paint3
- Mold2
- Electrical problems2
- Bedbugs1
- Mice or rats1
- Roaches1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 3 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorRepair or replace the smoke detector missingIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18071533
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18071535
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missingIssued Jul 3, 2025 · fix by Aug 7, 2025 overdue · Violation #18071534
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from northIssued May 22, 2025 · fix by Jun 26, 2025 overdue · rent impairing · Violation #17895885
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west and south walls in the 4th room from northIssued May 22, 2025 · fix by Jun 26, 2025 overdue · Violation #17895884
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 5th room from northIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17895888
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from northIssued May 19, 2025 · fix by Jun 23, 2025 overdue · rent impairing · Violation #17895886
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891494
- BLeaks and water damageRepair the roof so that it will not leak at window recess in the kitchenIssued May 14, 2025 · fix by Jun 18, 2025 overdue · rent impairing · Violation #17891491
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891490
- BOther repairsReplace with new the missing escutcheon plate at ceiling at the riser in the 4th room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891489
- BOther repairsReplace with new the missing escutcheon plate at ceiling at the riser in the 1st room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891493
- BOther repairsProperly repair with similar material the broken or defective sagging wood floor in the private hallwayIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891486
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and south wall in the 3rd room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · rent impairing · Violation #17891497
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891495
- BOther repairsReplace with new the missing escutcheon plate at ceiling at the riser in the 3rd room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891488
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 3rd room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891487
- BLeaks and water damageRepair the roof so that it will not leak at window recess in the bathroomIssued May 14, 2025 · fix by Jun 18, 2025 overdue · rent impairing · Violation #17891492
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued May 14, 2025 · fix by Jun 18, 2025 overdue · Violation #17891485
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead at public hall, 4th storyIssued May 14, 2025 · fix by May 28, 2025 overdue · Violation #17891498
- BLeaks and water damageRepair the roof so that it will not leak at window recess in the 2nd room from northIssued May 14, 2025 · fix by Jun 18, 2025 overdue · rent impairing · Violation #17891496
- BMoldTrace and repair the source and abate the visible mold condition approx 5 sq feet at ceiling in the bathroomIssued Mar 12, 2024 · fix by Apr 16, 2024 overdue · Violation #16741238
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Nov 24, 2023 · fix by Dec 8, 2023 overdue · Violation #16397204
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 13, 2023 · fix by Dec 18, 2023 overdue · Violation #16368078
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 13, 2023 · fix by Dec 9, 2023 overdue · Violation #16368076
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective at the public hall stair bulkheadIssued May 4, 2023 · fix by May 18, 2023 overdue · Violation #15955662
- CLead paintReplace or repair the self-closing doors that is missing or defective at the bottom of the stair leading down to the cellar at cellarIssued May 4, 2023 · fix by May 18, 2023 overdue · Violation #15955664
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued May 4, 2023 · fix by May 4, 2023 overdue · Violation #15955661
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the cellar throughout at cellarIssued May 4, 2023 · fix by Jun 8, 2023 overdue · Violation #15955665
- BOther repairsProperly repair with similar material the broken or defective concrete seal around the flue at the boiler room at cellarIssued May 4, 2023 · fix by Jun 8, 2023 overdue · Violation #15955666
- BOther repairsProperly repair or replace the broken or defective handrail at the east wall at public hall stairs, 4th storyIssued May 4, 2023 · fix by Jun 8, 2023 overdue · Violation #15955668
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective at the boiler room at cellarIssued May 4, 2023 · fix by May 18, 2023 overdue · Violation #15955663
- BLead paintProperly secure the loose hand rail leading to bulkhead roof at public hall, 4th storyIssued May 3, 2022 · fix by Jun 7, 2022 overdue · Violation #15139607
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at vestuble at public hall, 1st storyIssued Mar 14, 2022 · fix by Apr 18, 2022 overdue · Violation #15001903
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the 5th room from northIssued Feb 5, 2019 · fix by Mar 12, 2019 overdue · Violation #12886774
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 4th room from northIssued Jan 26, 2015 · fix by Mar 2, 2015 overdue · Violation #10515162
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south and west walls in the 4th room from northIssued Jan 26, 2015 · fix by Mar 2, 2015 overdue · Violation #10515166
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382162
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from northIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382229
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of defective light switch in the kitchenIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382172
- BOther repairsProperly repair the broken or defective igniter for burners at stove in the kitchenIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382166
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling,north and east wall in the 2nd room from northIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382226
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 5th room from northIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382221
- BOther repairsProperly secure the loose water closet (tank and bowl) in the bathroomIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382212
- BMoldTrace and repair the source and abate the nuisance consisting of mold at bathtub caulking in the bathroomIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382188
- BOther repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · rent impairing · Violation #10382211
- BPlumbing, sinks and toiletsRepair the broken or defective connection at sink in the kitchenIssued Sep 19, 2014 · fix by Oct 24, 2014 overdue · Violation #10382183
- BOther repairsProperly repair the broken or defective lower sash inoperable front room west window 1st sty westIssued Aug 4, 2009 · fix by Sep 8, 2009 overdue · Violation #1493087
- BOther repairs& 309 m/d law abate the nuisance consisting of unopenable egress window at front room lower sash window 1 styIssued Aug 4, 2009 · fix by Sep 8, 2009 overdue · Violation #1493090
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.