Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bushwick (West)

1422 Greene Avenue, Brooklyn

11237 · 6 apartments · 3 stories · City Council district 37

By · Updated · Data from NYC HPD

C
33open immediately hazardous violations · 550 per 100 apartments
B43Hazardous, open
A11Non-hazardous, open
!87Past the fix-by date

On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyGREENE RESIDENCE LLC

As registered with HPD.

What the city has done here

When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.

39Repairs the city did itself
$63,408Billed to the owner for them
6Court cases HPD brought
2Cases tenants brought

Latest city repairs

  • $
    General repairs · $580May 6, 2025 · Details
  • $
    General repairs · $487Broken doors or locksFeb 11, 2025 · Details
  • $
    Plumbing · $4,325Leaks and water damageNov 9, 2023 · Details
  • $
    Heat and boiler · $4,590Leaks and water damageNov 3, 2023 · Details
  • $
    Plumbing · $1,959Oct 17, 2023 · Details
  • $
    Heat and boiler · $9,305Oct 6, 2023 · Details
  • $
    Heat and boiler · $11,635Aug 25, 2023 · Details
  • $
    Asbestos removal · $252Aug 22, 2023 · Details

Latest Housing Court cases

  • §
    No heat or hot waterOpened date unknown · Pending · Details
  • §
    Many unfixed violations (follow-up)Opened date unknown · Pending · Details
  • §
    Many unfixed violations (follow-up)Opened date unknown · Pending · Details
  • §
    No heat or hot waterOpened Sep 11, 2023 · Closed · Details
  • §
    Many unfixed violationsOpened Feb 8, 2022 · Pending · Details
  • §
    Tenants sued over repairs and harassmentOpened Dec 10, 2021 · Closed · judgment against the owner · Details
  • §
    Warrant to get in and inspect or repairOpened Aug 31, 2021 · Closed · Details
  • §
    Tenants sued for repairsOpened Sep 18, 2020 · Closed · judgment against the owner · Details

Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.

Open problems

All open violations in the building, by type.

  1. Other repairs
    35
  2. Peeling paint and plaster
    10
  3. Mold
    7
  4. Mice or rats
    6
  5. Leaks and water damage
    6
  6. No heat or hot water
    5
  7. Roaches
    5
  8. Broken doors or locks
    4
  9. Bedbug report not filed
    3
  10. Electrical problems
    3
  11. Plumbing, sinks and toilets
    3
  12. Lead paint
    2
  13. Missing smoke or CO detector
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C64 days
from 42 closed · NYC typical: 84 days
B169 days
from 9 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 8, 2026 · fix by Oct 4, 2026 overdue · rent impairing · Violation #19194501
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of wooden floor at basementIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19194750
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18644738
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at cellarIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18644756
  • C
    Other repairsProperly repair or replace the broken or defective air release valve at radiator in the 1st room from eastIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18644766
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from eastIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18644739
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling and walls at cellarIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · Violation #18644748
  • B
    Other repairsProperly repair with similar material the broken or defective fire retarding material at ceiling at cellarIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18644752
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18644767
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18564748
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Jan 13, 2026 · fix by Feb 17, 2026 overdue · Violation #18564747
  • B
    Other repairsProperly repair or replace the broken or defective bell, buzzer and return intercom system from building front entrance to in the entire apartmentIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468289
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash at window in the 5th room from northIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · Violation #18468292
  • B
    Broken doors or locksProperly repair or replace the broken or defective intercom system at building entrance door , 1st storyIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18414831
  • C
    Other repairsProperly repair with similar material the broken or defective fire rated material at west wall at cellarIssued May 6, 2025 · fix by May 12, 2025 overdue · Violation #17874617
  • C
    No heat or hot waterRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the broken sheet rock and old hot water heater at cellarIssued May 6, 2025 · fix by May 12, 2025 overdue · Violation #17880973
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wireIssued May 6, 2025 · fix by May 12, 2025 overdue · Violation #17874622
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor at cellarIssued May 6, 2025 · fix by May 12, 2025 overdue · Violation #17874621
  • C
    Lead paintProperly repair or replace the broken or defective door lock leading leading to cellar at public hall, 1st storyIssued May 6, 2025 · fix by May 12, 2025 overdue · Violation #17880943
  • B
    MoldTrace and repair the source and abate the visible mold condition around bathtub in the bathroomIssued Oct 21, 2024 · fix by Nov 25, 2024 overdue · Violation #17363289
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 18, 2024 · fix by Oct 23, 2024 overdue · Violation #17285188
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Sep 18, 2024 · fix by Oct 23, 2024 overdue · Violation #17285191
  • B
    Other repairsProperly repair with similar material the broken or defective concrete thread fiifth from bottom up at stoop, 1st storyIssued Jul 22, 2024 · fix by Aug 26, 2024 overdue · Violation #17132056
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jul 5, 2024 · fix by Aug 9, 2024 overdue · Violation #17104393
  • B
    MoldTrace and repair the source and abate the visible mold condition at base cabinet under sink in the kitchenIssued Mar 13, 2024 · fix by Apr 17, 2024 overdue · Violation #16747636
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 3rd storyIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · rent impairing · Violation #16724480
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 6, 2024 · fix by Apr 10, 2024 overdue · Violation #16724492
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall original violation 16188171 issued 24-aug-23 has been upgraded to class b per…Issued Dec 26, 2023 · fix by Jan 30, 2024 overdue · Violation #16551953
  • B
    MoldTrace and repair the source and abate the visible mold condition around bathtub in the bathroomIssued Dec 5, 2023 · fix by Jan 9, 2024 overdue · Violation #16502527
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from eastIssued Nov 13, 2023 · fix by Dec 18, 2023 overdue · Violation #16376882
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 4th room from eastIssued Nov 13, 2023 · fix by Dec 18, 2023 overdue · Violation #16376880
  • C
    Other repairsProperly repair with similar material the broken or defective wood balusters # 8th and 13th from east to south at public hall, 3rd storyIssued Nov 8, 2023 · fix by Nov 14, 2023 overdue · Violation #16369967
  • B
    Other repairsReplace with new the missing escutheon plate at riser in the 5th room from eastIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16369988
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Nov 8, 2023 · fix by Dec 13, 2023 overdue · Violation #16369982
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Nov 2, 2023 · fix by Nov 2, 2023 overdue · rent impairing · Violation #16356710
  • B
    Other repairsProperly repair or replace the broken or defective bell and buzzer at entrance building , 1st storyIssued Oct 17, 2023 · fix by Nov 21, 2023 overdue · Violation #16309950
  • C
    Lead paintProperly repair or replace the broken or defective door leading to the basement at public hall, 1st storyIssued Oct 17, 2023 · fix by Oct 23, 2023 overdue · Violation #16309956
  • B
    Other repairsProperly repair or replace the broken or defective intercom system in the foyerIssued Oct 17, 2023 · fix by Nov 21, 2023 overdue · Violation #16309962
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 12, 2023 · fix by Oct 12, 2023 overdue · rent impairing · Violation #16309944
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 15, 2023 · fix by Oct 11, 2023 overdue · Violation #16232439
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 15, 2023 · fix by Oct 20, 2023 overdue · Violation #16232463
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 15, 2023 · fix by Oct 11, 2023 overdue · Violation #16232440
  • B
    Plumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at cellarIssued Aug 28, 2023 · fix by Oct 2, 2023 overdue · Violation #16188161
  • C
    Other repairsProperly repair with similar material the broken or defective concrete flooring in cellarIssued Aug 22, 2023 · fix by Aug 28, 2023 overdue · Violation #16185261
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at west wall in cellarIssued Aug 22, 2023 · fix by Aug 28, 2023 overdue · Violation #16185276
  • B
    Broken doors or locksRefit door in the entranceIssued Aug 21, 2023 · fix by Sep 25, 2023 overdue · Violation #16177433
  • B
    Other repairsProperly repair or replace the broken or defective intercom system in the entranceIssued Aug 18, 2023 · fix by Sep 22, 2023 overdue · Violation #16176547
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 7, 2023 · fix by Sep 11, 2023 overdue · Violation #16151989
  • B
    Other repairsCleanse and disinfect to the satisfaction of this department after removing the standing water and rotted wood at floorIssued Jul 31, 2023 · fix by Sep 4, 2023 overdue · rent impairing · Violation #16136308
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 31, 2023 · fix by Aug 26, 2023 overdue · Violation #16136302
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 31, 2023 · fix by Aug 26, 2023 overdue · Violation #16136303
  • C
    Other repairsProperly repair the broken or defective paving at floor of cellarIssued Jul 31, 2023 · fix by Aug 6, 2023 overdue · Violation #16136305
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 26, 2023 · fix by Jul 25, 2023 overdue · rent impairing · Violation #16122111
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall at basementIssued Jul 25, 2023 · fix by Jul 31, 2023 overdue · Violation #16121935
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of water damaged wooden floor tiles at entire basement at basementIssued Jul 25, 2023 · fix by Jul 31, 2023 overdue · Violation #16121932
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jul 25, 2023 · fix by Jul 22, 2023 overdue · rent impairing · Violation #16120747
  • B
    Other repairsProperly repair or replace the broken or defective intercom system in the entire apartmentIssued Jul 19, 2023 · fix by Aug 23, 2023 overdue · Violation #16112206
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock set in the entranceIssued Jun 26, 2023 · fix by Jul 31, 2023 overdue · Violation #16063469
  • B
    Leaks and water damageRepair the leaky and/or defective faucets sink in the kitchenIssued Jun 26, 2023 · fix by Jul 31, 2023 overdue · Violation #16063477
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the 2nd room from northIssued Jun 26, 2023 · fix by Jul 31, 2023 overdue · Violation #16063479

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82017
32018
22019
1182020
802021
422022
802023
162024
182025
132026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 449 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 19, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.