Housing violations · Bedford-Stuyvesant (West)
609 Greene Avenue, Brooklyn
11221 · 6 apartments · 3 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
16 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs47
- Broken doors or locks15
- No heat or hot water14
- Electrical problems13
- Mold11
- Leaks and water damage10
- Peeling paint and plaster7
- Roaches6
- Plumbing, sinks and toilets4
- Mice or rats4
- Lead paint3
- Missing smoke or CO detector3
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 12 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north and south wall in the kitchenIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238481
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the private hallwayIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238478
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Sep 24, 2026 · fix by Oct 29, 2026 overdue · Violation #19238480
- BMoldTrace and repair the source and abate the visible mold condition less than 10sqft at west wall in the bathroomIssued Aug 7, 2026 · fix by Sep 11, 2026 overdue · Violation #19132082
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the private hallwayIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107294
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at east and west walls in the 4th room from northIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19107295
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq ft at west wall in the bathroomIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19062343
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at west wall in the bathroomIssued Jun 26, 2026 · fix by Jul 31, 2026 overdue · Violation #19040711
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at west and south wall in the bathroomIssued Jun 23, 2026 · fix by Jul 28, 2026 overdue · Violation #19032588
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq ft at west wall in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025502
- BOther repairsProperly repair with similar material the broken or defective wood stool in the 1st room from northIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18761793
- BOther repairsProperly repair or replace the broken or defective ventilation extraction system at ceiling in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18761797
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18761792
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at bathtub in the bathroomIssued Apr 9, 2026 · fix by May 14, 2026 overdue · rent impairing · Violation #18761794
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Apr 9, 2026 · fix by Apr 15, 2026 overdue · Violation #18761798
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at south wall at public hall stairs, 2nd storyIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18761802
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at north wall at public hall, 3rd storyIssued Apr 8, 2026 · fix by May 13, 2026 overdue · Violation #18761801
- BOther repairsProperly repair with similar material the broken or defective ceramic tile at north wall in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18698135
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 11, 2026 · fix by Mar 11, 2026 overdue · rent impairing · Violation #18698136
- BOther repairsProperly repair with similar material the broken or defective wood stoop at north window in the 1st room from northIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18691472
- BOther repairsProperly repair with similar material the broken or defective regrout at south east and west walls in the bathroomIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18687144
- BMoldProperly repair with similar material the broken or defective wood molding at floor in the 1st room from northIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18691474
- BOther repairsProperly repair or replace the broken or defective ventilation system at ceiling in the bathroomIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18691471
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west in the bathroomIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18691473
- CLead paintProvide ready access to buildings heating system door locked leading to cellar at boiler roomIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18687142
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18691476
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 9, 2026 · fix by Mar 8, 2026 overdue · rent impairing · Violation #18691477
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 6, 2026 · fix by Mar 5, 2026 overdue · rent impairing · Violation #18687145
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation at ceiling in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18675093
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18675092
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18675091
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18666519
- BOther repairsProperly repair with similar material the broken or defective wood stool at window at north in the 1st room from northIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18666518
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18666520
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18666521
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroomIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18666522
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hall 1st story to cellar at boiler roomIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · Violation #18666523
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 26, 2026 · fix by Feb 26, 2026 overdue · rent impairing · Violation #18666516
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 23, 2026 · fix by Mar 21, 2026 overdue · Violation #18659087
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Feb 23, 2026 · fix by Mar 1, 2026 overdue · Violation #18659085
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18659084
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18659086
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tile at west wall in the bathroomIssued Feb 23, 2026 · fix by Mar 30, 2026 overdue · Violation #18659089
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18649106
- BOther repairsProperly repair with similar material the broken or defective wooden window stoll in the 1st room from northIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18649109
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system in the bathroomIssued Feb 18, 2026 · fix by Mar 25, 2026 overdue · Violation #18649105
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 12, 2026 · fix by Mar 19, 2026 overdue · Violation #18634840
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18634842
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hall 1st story at boiler roomIssued Feb 12, 2026 · fix by Feb 18, 2026 overdue · Violation #18618562
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634843
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18618564
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 5, 2026 · fix by Feb 5, 2026 overdue · rent impairing · Violation #18618563
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 5, 2026 · fix by Feb 5, 2026 overdue · rent impairing · Violation #18618560
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18609741
- BOther repairsProperly repair with similar material the broken or defective wood stool at north window in the 1st room from northIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18609742
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18609743
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 2, 2026 · fix by Feb 1, 2026 overdue · rent impairing · Violation #18609744
- CLead paintProvide ready access to buildings heating system door locked leading to cellar at boiler roomIssued Jan 26, 2026 · fix by Feb 1, 2026 overdue · Violation #18594701
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at west in the bathroomIssued Jan 26, 2026 · fix by Mar 2, 2026 overdue · Violation #18594700
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 26, 2026 · fix by Jan 25, 2026 overdue · rent impairing · Violation #18594698
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.