Housing violations · Bushwick (East)
1229 Halsey Street, Brooklyn
11237 · 8 apartments · 4 stories · City Council district 37
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs33
- Peeling paint and plaster10
- Leaks and water damage5
- Mice or rats4
- Plumbing, sinks and toilets3
- Electrical problems3
- Broken doors or locks2
- Roaches2
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 8 closed · NYC typical: 87 days
from 15 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles at public hall, 4th storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153431
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles at public hall, 3rd storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153428
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles at public hall, 1st storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153421
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at vestibule , 1st storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153418
- BOther repairsProperly repair with similar material the broken or defective marble saddle in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153398
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153399
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153416
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic wall tiles at west wall at bathtub in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153401
- BOther repairsProvide a metal lower screen mesh at skylightIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153434
- BOther repairsProperly repair with similar material the broken or defective concrete landing at stoopIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153442
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling and west wall at bulkheadIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19153437
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at west wallIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · rent impairing · Violation #19153435
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the bathroomIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · rent impairing · Violation #16303106
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardent plaster at the ceiling and west wall at bulkhead at public hall, 4th storyIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · Violation #16303133
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from northIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · Violation #16303126
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from northIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · rent impairing · Violation #16303123
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 12, 2023 · fix by Nov 16, 2023 overdue · Violation #16303109
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Mar 23, 2023 · fix by Apr 27, 2023 overdue · Violation #15816855
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from northIssued Mar 23, 2023 · fix by Apr 27, 2023 overdue · Violation #15816861
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Mar 23, 2023 · fix by Apr 27, 2023 overdue · Violation #15816860
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the 3rd room from northIssued Mar 23, 2023 · fix by Apr 27, 2023 overdue · Violation #15816862
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 23, 2023 · fix by Apr 18, 2023 overdue · Violation #15816857
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 23, 2023 · fix by Apr 18, 2023 overdue · Violation #15816858
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from northIssued Mar 23, 2023 · fix by Apr 27, 2023 overdue · Violation #15816856
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2021 · fix by Oct 13, 2021 overdue · Violation #14558367
- COther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the west (rear) yardIssued Nov 15, 2019 · fix by Nov 23, 2019 overdue · Violation #13452604
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 4, 2019 · fix by Oct 25, 2019 overdue · Violation #13313853
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 3, 2019 · fix by Oct 24, 2019 overdue · Violation #13311478
- COther repairsProvide an adequate supply of gas to the fixtures in the entire apartmentIssued Oct 3, 2019 · fix by Oct 11, 2019 overdue · rent impairing · Violation #13311529
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 5th room from northIssued Sep 14, 2018 · fix by Oct 19, 2018 overdue · Violation #12574129
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods the drop ladder in down position at rear at fire escapeIssued Aug 20, 2018 · fix by Sep 24, 2018 overdue · rent impairing · Violation #12530988
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house hold garbage at rear at fire escape, 1st storyIssued Aug 20, 2018 · fix by Sep 24, 2018 overdue · Violation #12530990
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plex glass at main entrance door in vestibule at public hall, 1st storyIssued Aug 20, 2018 · fix by Aug 28, 2018 overdue · Violation #12535626
- CLeaks and water damageRepair the roof so that it will not leak at 4th story public hall at public hall, 4th storyIssued Aug 20, 2018 · fix by Aug 28, 2018 overdue · rent impairing · Violation #12528917
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the kitchenIssued Aug 17, 2018 · fix by Sep 21, 2018 overdue · Violation #12526665
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroomIssued Aug 17, 2018 · fix by Sep 21, 2018 overdue · Violation #12526662
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling and north wall in the 5th room from eastIssued Aug 17, 2018 · fix by Sep 21, 2018 overdue · Violation #12526659
- BOther repairsProvide an adequate supply of gas to the fixtures 'range' in the kitchenIssued Oct 13, 2015 · fix by Nov 17, 2015 overdue · rent impairing · Violation #10930644
- BOther repairsM/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at boiler roomIssued Apr 8, 2014 · fix by May 13, 2014 overdue · rent impairing · Violation #10199673
- CLead paintRemove all obstructions and repair all defects in roof rain leaders and gutter at rearIssued Mar 4, 2014 · fix by Mar 12, 2014 overdue · rent impairing · Violation #10154968
- BOther repairsProperly repair with similar material the broken or defective concrete and stone walls and floors throughout at cellarIssued Mar 4, 2014 · fix by Apr 8, 2014 overdue · Violation #10158780
- BOther repairsProperly repair with similar material the broken or defective collapsing sheetrock at ceiling outsiede the boiler room at cellarIssued Mar 4, 2014 · fix by Apr 8, 2014 overdue · Violation #10158782
- BOther repairsProperly fire-retard, in accordance with the rules and regulations of this department, the ceiling at cellarIssued Mar 4, 2014 · fix by Apr 8, 2014 overdue · rent impairing · Violation #10158783
- CMice or ratsAbate the nuisance consisting of rodents rats at cellarIssued Mar 4, 2014 · fix by Mar 12, 2014 overdue · rent impairing · Violation #10158778
- BOther repairsProperly repair the broken or defective concrete tread at 2nd and 3rd from bottom of building front at stoopIssued Jan 16, 2014 · fix by Feb 20, 2014 overdue · Violation #10096783
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color wall behind sink in the kitchenIssued Sep 9, 2013 · fix by Oct 14, 2013 overdue · Violation #9963939
- BOther repairsProperly repair with similar material the broken or defective wood floor and vinyl tiles in the kitchenIssued Jan 31, 2011 · fix by Mar 7, 2011 overdue · Violation #8784998
- BPeeling paint and plasterProperly repair with similar material the broken or defective plaster board ceiling at north east and north west at cellarIssued Oct 5, 2010 · fix by Nov 9, 2010 overdue · Violation #8631480
- BOther repairsProperly repair the broken or defective intercom sysyem in the entire apartmentIssued Jun 7, 2010 · fix by Jul 12, 2010 overdue · Violation #8455042
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.