Housing violations · Bedford-Stuyvesant (West)
140 Herkimer Street, Brooklyn
11216 · 16 apartments · 4 stories · City Council district 36
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs16
- Broken doors or locks6
- Mold4
- Mice or rats4
- Roaches2
- Leaks and water damage2
- Peeling paint and plaster1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 39 closed · NYC typical: 87 days
from 88 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the trash bags at yard at public hallIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19348991
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19133945
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19133940
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19133939
- BOther repairsProperly repair with similar material the broken or defective wood floor throughout in the 1st room from northIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19133941
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19133944
- BOther repairsProperly repair or replace the broken or defective defective cabinet at south wall in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19133952
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles throughout in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19133943
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19013180
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19013181
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 4, 2026 · fix by Mar 18, 2026 overdue · Violation #18680836
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at south, west walls and ceiling in the bathroomIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18680830
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 27, 2026 · fix by Feb 22, 2026 overdue · Violation #18588174
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 27, 2026 · fix by Feb 22, 2026 overdue · Violation #18588175
- CMoldTrace and repair the source and abate the visible mold condition more than 25 square feet at ceiling north south and west walls in the bathroomIssued Jan 27, 2026 · fix by Feb 22, 2026 overdue · Violation #18588170
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hinges in the entranceIssued Jun 6, 2025 · fix by Jun 20, 2025 overdue · Violation #17963484
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door hinges in the entranceIssued May 16, 2025 · fix by May 30, 2025 overdue · Violation #17904122
- BOther repairsRemove all encumbrances consisting of bicycles at public hall, 1st storyIssued Jan 6, 2025 · fix by Feb 10, 2025 overdue · rent impairing · Violation #17598676
- BOther repairsReplace with new the missing newel cap at intermediate landing at public hall stairs, 1st storyIssued May 7, 2024 · fix by Jun 11, 2024 overdue · Violation #16952829
- BMoldTrace and repair the source and abate the visible mold condition approx 12 sq feet at north in the bathroomIssued Nov 16, 2023 · fix by Dec 21, 2023 overdue · Violation #16379988
- BOther repairsProperly repair or replace the broken or defective buzzer in the foyerIssued Jun 7, 2023 · fix by Jul 12, 2023 overdue · Violation #16017250
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 5, 2023 · fix by Jul 1, 2023 overdue · Violation #16016364
- BOther repairsProperly repair or replace the broken or defective window counter balance lower sash at north wall in the 1st room from north at westIssued Jun 5, 2023 · fix by Jul 10, 2023 overdue · Violation #16016366
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape in the 4th room from north at westIssued Jun 5, 2023 · fix by Jul 10, 2023 overdue · Violation #16016370
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Jun 5, 2023 · fix by Jun 19, 2023 overdue · Violation #16016369
- BBroken doors or locksProperly repair the broken or defective door bell buzzer intercom system from building entrance to box at east wall in the foyerIssued Jul 29, 2022 · fix by Sep 2, 2022 overdue · Violation #15288838
- BOther repairsProperly repair the broken or defective counter balance at upper and lower sash window in the 1st room from north at westIssued Jul 29, 2022 · fix by Sep 2, 2022 overdue · Violation #15288818
- BOther repairsProperly repair the broken or defective bell and return buzzer system from vestibule building to east wall in the private hallwayIssued Jul 14, 2021 · fix by Aug 18, 2021 overdue · Violation #14435604
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at fire passageway at northwestIssued Jun 28, 2021 · fix by Aug 2, 2021 overdue · Violation #14406423
- BOther repairsProperly repair the broken or defective lower window sash counter balance at south wall in the kitchenIssued Sep 18, 2020 · fix by Oct 23, 2020 overdue · Violation #13812475
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood counter top at sink cabinet in the kitchenIssued Sep 18, 2020 · fix by Oct 23, 2020 overdue · Violation #13812482
- BOther repairsProperly repair with similar material the broken or defective vinly floor tiles in the kitchenIssued Oct 15, 2019 · fix by Nov 19, 2019 overdue · Violation #13330098
- BOther repairsReplace with new the missing escutcheon plate in the kitchenIssued Oct 15, 2019 · fix by Nov 19, 2019 overdue · Violation #13330099
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2019 · fix by Nov 5, 2019 overdue · Violation #13330088
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.