Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Ocean Hill

212 Hull Street, Brooklyn

11233 · 8 apartments · 4 stories · City Council district 37

By · Updated · Data from NYC HPD

C
4open immediately hazardous violations · 50 per 100 apartments
B4Hazardous, open
A1Non-hazardous, open
!9Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Who owns and manages it

Owning companyHull Street Associates LLC
Landlord (head officer or owner)Ian Lagowitz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    3
  2. Lead paint
    3
  3. Broken doors or locks
    1
  4. Roaches
    1
  5. Peeling paint and plaster
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C104 days
from 6 closed · NYC typical: 87 days
B105 days
from 45 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214439
  • B
    Other repairsProperly secure the loose handrail at east wall building front. , 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19214437
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 26, 2026 · fix by Jul 22, 2026 overdue · Violation #19029708
  • B
    Other repairsProperly repair with similar material the broken or defective cracked and spliced masonry lintels above windows at 2nd and 3rd stories , building front yardIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909669
  • B
    Other repairsProperly repair with similar material the broken or defective porcelain enamel method by reglazing at bath tub in the bathroomIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17692005
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 4, 2015 · fix by Dec 2, 2015 overdue · Violation #10988615
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 4, 2005 · fix by Apr 30, 2005 overdue · Violation #5431755
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 4, 2005 · fix by Apr 30, 2005 overdue · Violation #5431756

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

52018
182021
112023
12024
42025
572026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 270 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.