Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bushwick (West)

170 Irving Avenue, Brooklyn

11237 · 6 apartments · 3 stories · City Council district 37

By · Updated · Data from NYC HPD

C
3open immediately hazardous violations · 50 per 100 apartments
B15Hazardous, open
A2Non-hazardous, open
!20Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

Open in Google Maps ↗

Who owns and manages it

Owning company170 IRVING AVENUE LLC
Landlord (head officer or owner)Deodat Lowtan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    6
  2. Other repairs
    4
  3. Broken doors or locks
    3
  4. Missing smoke or CO detector
    2
  5. Lead paint
    2
  6. Leaks and water damage
    2
  7. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C100 days
from 2 closed · NYC typical: 87 days
B120 days
from 7 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19077132
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512667
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512677
  • B
    Broken doors or locksProperly repair with similar material the broken or defective brick wall around street entrance door at public hall, 1st storyIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512634
  • B
    Electrical problemsProperly repair the broken or defective electric bell buzzer intercom system in the entranceIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512618
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at vestibule entrance at public hall, 1st storyIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512655
  • B
    Broken doors or locksArrange and make self-closing the doors at the building entrance , 1st storyIssued Mar 16, 2018 · fix by Apr 20, 2018 overdue · Violation #12288495
  • B
    Other repairsProperly repair the broken or defective intercom system between the building entrance and the dwelling units , 1st storyIssued Mar 16, 2018 · fix by Apr 20, 2018 overdue · Violation #12288491
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from eastIssued Nov 4, 2016 · fix by Dec 9, 2016 overdue · Violation #11480523
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2015 · fix by Nov 25, 2015 overdue · Violation #10981241
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2015 · fix by Nov 25, 2015 overdue · Violation #10981242
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765795
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765812
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765793
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchenIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315076
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the kitchenIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315067
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture in the bathroomIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315081
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315079

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

72018
22020
12021
22022
12023
62024
32026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 114 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.