Housing violations · Bushwick (West)
170 Irving Avenue, Brooklyn
11237 · 6 apartments · 3 stories · City Council district 37
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster6
- Other repairs4
- Broken doors or locks3
- Missing smoke or CO detector2
- Lead paint2
- Leaks and water damage2
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 2 closed · NYC typical: 87 days
from 7 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance at public hall, 1st storyIssued Jul 21, 2026 · fix by Aug 4, 2026 overdue · Violation #19077132
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512667
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512677
- BBroken doors or locksProperly repair with similar material the broken or defective brick wall around street entrance door at public hall, 1st storyIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512634
- BElectrical problemsProperly repair the broken or defective electric bell buzzer intercom system in the entranceIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512618
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at vestibule entrance at public hall, 1st storyIssued Aug 7, 2018 · fix by Sep 11, 2018 overdue · Violation #12512655
- BBroken doors or locksArrange and make self-closing the doors at the building entrance , 1st storyIssued Mar 16, 2018 · fix by Apr 20, 2018 overdue · Violation #12288495
- BOther repairsProperly repair the broken or defective intercom system between the building entrance and the dwelling units , 1st storyIssued Mar 16, 2018 · fix by Apr 20, 2018 overdue · Violation #12288491
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 1st room from eastIssued Nov 4, 2016 · fix by Dec 9, 2016 overdue · Violation #11480523
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2015 · fix by Nov 25, 2015 overdue · Violation #10981241
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2015 · fix by Nov 25, 2015 overdue · Violation #10981242
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765795
- BOther repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765812
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Jul 2, 2015 · fix by Aug 6, 2015 overdue · Violation #10765793
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchenIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315076
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the kitchenIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315067
- BOther repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture in the bathroomIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315081
- BPeeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Jul 21, 2014 · fix by Aug 25, 2014 overdue · Violation #10315079
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.