Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Crown Heights (North)

195 Kingston Avenue, Brooklyn

11213 · 16 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
21open immediately hazardous violations · 131 per 100 apartments
B34Hazardous, open
A6Non-hazardous, open
!47Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyKINGSTON ASSOCIATES LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    19
  2. Lead paint
    16
  3. Other repairs
    8
  4. Mold
    4
  5. Broken doors or locks
    3
  6. Leaks and water damage
    3
  7. Electrical problems
    3
  8. Mice or rats
    3
  9. No heat or hot water
    1
  10. Roaches
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C77 days
from 7 closed · NYC typical: 87 days
B78 days
from 3 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature above the maximum allowable temperature of 130 degrees at all hot water fixtures in the…Issued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19347975
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347977
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19347978
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the private hallwayIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19347976
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at window header in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19313798
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19313797
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19313804
  • B
    Other repairsReplace the broken or defective watercloset in the bathroomIssued Oct 23, 2026 · fix by Nov 27, 2026 · rent impairing · Violation #19313800
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19313799
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248122
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248121
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at northIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248113
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248112
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at west wall in the 3rd room from east at northIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248120
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19248111
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 1, 2026 · fix by Sep 27, 2026 overdue · Violation #19178105
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartmentIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178087
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178104
  • B
    Broken doors or locksProperly repair or replace the broken or defective wood door at entrance in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178103
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlets at west wall in the 3rd room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178100
  • B
    Other repairsProperly repair with similar material the broken or defective wood at floor in the 3rd room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178098
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178097
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178095
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 2nd room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178094
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south, north walls and ceiling in the private hallwayIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178093
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at southIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178092
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178091
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178090
  • B
    Other repairsProperly repair or replace the broken or defective wood base cabinet at north in the kitchenIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178096
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178102
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the bathroomIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19178089
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607160
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft at south wall in the bathroomIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607163
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color atceiling in the kitchenIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607159
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the private hallwayIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607161
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607162
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 2, 2022 · fix by Aug 28, 2022 overdue · Violation #15297512
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 2, 2022 · fix by Aug 28, 2022 overdue · Violation #15297511
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued May 21, 2013 · fix by Jun 25, 2013 overdue · Violation #9842930
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint steam riser bathroom 1 sty northeastIssued May 21, 1996 · fix by Jun 10, 1996 overdue · Violation #1627604
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls entrance foyer 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627586
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling foyer 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627587
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling center room 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627592
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint east & south wall kitchen 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627591
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls bathroom 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627588
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling kitchen 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627590
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling bathroom 1 styIssued Dec 29, 1992 · fix by Jan 18, 1993 overdue · Violation #1627589
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls & ceiling kitchen 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627578
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling west room 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627585
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls & ceiling public hall 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627579
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls & ceiling bathroom 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627580
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint door frame bathroom 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627581
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint walls & ceiling foyer 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627582
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint entrance door to 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627583
  • C
    Lead paintRemove or cover in a manner approved by the department the peeling lead paint ceiling east room 1 sty northeastIssued Sep 29, 1992 · fix by Oct 19, 1992 overdue · Violation #1627584

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42017
62019
52021
42022
142024
12025
442026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 138 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.