Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Brownsville

307 Legion Street, Brooklyn

11212 · 4 apartments · 2 stories · City Council district 41

By · Updated · Data from NYC HPD

C
40open immediately hazardous violations · 1,000 per 100 apartments
B65Hazardous, open
A26Non-hazardous, open
!131Past the fix-by date

8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyLegion plaza 7 llc

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    50
  2. Missing smoke or CO detector
    18
  3. Broken doors or locks
    17
  4. Peeling paint and plaster
    14
  5. Leaks and water damage
    11
  6. No heat or hot water
    5
  7. Plumbing, sinks and toilets
    4
  8. Lead paint
    4
  9. Electrical problems
    3
  10. Mold
    2
  11. Mice or rats
    2
  12. Roaches
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C183 days
from 1 closed · NYC typical: 87 days
B183 days
from 1 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective entry door in the 3rd room from east at northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18739099
  • C
    Other repairsReplace with new the missing 7th, 8th and 12th baluster at public hall stairs, 1st storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739111
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at boiler roomIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739106
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor and north wall in the bathroomIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739096
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739095
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739097
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 27, 2026 · fix by Apr 10, 2026 overdue · Violation #18739102
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall, 1st storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739114
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739113
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18739101
  • B
    Broken doors or locksProperly repair or replace the broken or defective entry door in the 3rd room from east at southIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18739098
  • C
    Other repairsProperly repair with similar material the broken or defective 1st, 2nd and 3rd wood treads and risers from top at bulkhead stairs to roof , 3rd storyIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739107
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18739100
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at wastepipe at sink in the kitchenIssued Mar 27, 2026 · fix by Apr 2, 2026 overdue · Violation #18739092
  • C
    Other repairsProvide adequate supply of cold water for the fixtures in the entire apartmentIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · rent impairing · Violation #18671913
  • C
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at basementIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · Violation #18671927
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · rent impairing · Violation #18671906
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at basementIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · Violation #18671925
  • C
    Electrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Feb 26, 2026 · fix by Feb 25, 2026 overdue · Violation #18671917
  • C
    Lead paintProperly repair with similar material the broken or defective wood stringer and all twelve wood treads at stairs leading to basement at basementIssued Feb 26, 2026 · fix by Mar 4, 2026 overdue · Violation #18671932
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 4th bedroom from east at northIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18642971
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 4th bedroom from east at northIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18642969
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor. at public hall, 2nd storyIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18642984
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the kitchenIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18642973
  • C
    Other repairsProperly repair or replace the broken or defective cold radiator in the entire apartmentIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18642966
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18642968
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line under the sink in the kitchenIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18642977
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st storyIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18642982
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardent material at ceiling and south wall at public hall, 1st storyIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18642983
  • B
    MoldTrace and repair the source and abate the visible mold condition aprox 8 sq ft at south wall in the kitchenIssued Jul 26, 2021 · fix by Aug 30, 2021 overdue · Violation #14461018
  • B
    Broken doors or locksProperly repair the broken or defective heavy duty lock at front door entrance at public hall, 1st storyIssued Mar 29, 2021 · fix by May 3, 2021 overdue · Violation #14094548
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Mar 26, 2021 · fix by Apr 30, 2021 overdue · Violation #14089828
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 26, 2021 · fix by Apr 21, 2021 overdue · Violation #14089825
  • B
    Missing smoke or CO detectorProvide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire…Issued Mar 26, 2021 · fix by Apr 30, 2021 overdue · Violation #14089835
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 26, 2021 · fix by Apr 21, 2021 overdue · Violation #14089822
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures , in the entire apartmentIssued Mar 25, 2021 · fix by Mar 31, 2021 overdue · Violation #14089737
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Mar 16, 2021 · fix by Mar 22, 2021 overdue · Violation #14072349
  • B
    MoldTrace and repair the source and abate the visible mold condition south wall ( approx 4 sq ft ) in the kitchenIssued Dec 11, 2020 · fix by Jan 15, 2021 overdue · Violation #13934709
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yardIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762848
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east and west walls in the bathroomIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762856
  • B
    Other repairsProperly repair the broken or defective south wood window frame in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762858
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 4th room from eastIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762853
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762852
  • B
    Broken doors or locksProperly repair the broken or defective lock assembly at building entrance door at public hall, 1st storyIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762849
  • B
    Leaks and water damageRepair the leaky and/or defective faucets sink in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762857
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak moisture penetrating south wall in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762860
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchenIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762861
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak moisture penetrating east wall in the bathroomIssued Aug 13, 2020 · fix by Sep 17, 2020 overdue · Violation #13762855
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Jul 28, 2020 · fix by Aug 3, 2020 overdue · rent impairing · Violation #13739521
  • C
    Other repairsProvide ready access to buildings heating system in the entire apartmentIssued Jul 28, 2020 · fix by Aug 3, 2020 overdue · Violation #13739524
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures in the entire apartmentIssued Jul 28, 2020 · fix by Aug 3, 2020 overdue · rent impairing · Violation #13739516
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the wall , 1st storyIssued Jul 2, 2020 · fix by Aug 6, 2020 overdue · Violation #13708491
  • C
    Broken doors or locksProperly repair the broken or defective lock at the building entrance door , 1st storyIssued Jul 2, 2020 · fix by Jul 8, 2020 overdue · Violation #13708506
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak on the ceiling in the bathroomIssued Jun 30, 2020 · fix by Aug 4, 2020 overdue · Violation #13708426
  • C
    Broken doors or locksProperly repair the broken or defective locking device at building street entrance doorIssued May 8, 2020 · fix by May 14, 2020 overdue · Violation #13670692
  • B
    Broken doors or locksReplace with new the missing door handle at 1st public hall bulkhead from east, 3rd storyIssued Dec 31, 2019 · fix by Feb 4, 2020 overdue · Violation #13523318
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective at roof at 1st public hall bulkhead from east, 3rd storyIssued Dec 31, 2019 · fix by Jan 21, 2020 overdue · Violation #13523315
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of loose light fixture at ceiling at public hall, 1st storyIssued Sep 9, 2019 · fix by Sep 17, 2019 overdue · Violation #13262147
  • B
    Other repairsReplace with new the missing baluster # 7,8 and 12 from 1st story to 2nd story at public hall stairs, 1st storyIssued Sep 9, 2019 · fix by Oct 14, 2019 overdue · Violation #13262131
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective in the entranceIssued Sep 5, 2019 · fix by Sep 26, 2019 overdue · Violation #13261179

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

112017
322019
452020
192021
12022
12023
12024
12025
342026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 250 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.