Housing violations · Crown Heights (North)
1226 Lincoln Place, Brooklyn
11213 · 31 apartments · 4 stories · City Council district 35
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster21
- Other repairs10
- Leaks and water damage9
- Lead paint8
- Mold6
- Plumbing, sinks and toilets3
- Broken doors or locks3
- Roaches2
- No heat or hot water2
- Mice or rats1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 104 closed · NYC typical: 87 days
from 141 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around at bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368221
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368222
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and all walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368223
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368212
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 3rd storyIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368227
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 3rd storyIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368226
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19368210
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368214
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368215
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, west and east wall in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368216
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368217
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368218
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368219
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368220
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19368211
- CBroken doors or locksProvide ready access to buildings heating system lock door to boiler room at boiler roomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19368225
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 12, 2026 · fix by Nov 12, 2026 overdue · rent impairing · Violation #19368209
- BBroken doors or locksProperly repair or replace the broken or defective top cabinet door in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365440
- BOther repairsReplace with new the missing heat riser escutcheon plate at ceiling in the 2nd room from eastIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365442
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365441
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365443
- BOther repairs- §272024 provide and maintain a pure and wholesome water supply that was found discolored at all hot and cold water fixtures in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365439
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeds 130 degrees at all hot water fixtures temperature in the entire apartmentIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19339274
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19299353
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19299352
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 4th storyIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19278724
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2026 · fix by Nov 2, 2026 overdue · Violation #19278723
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at southIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19198030
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19198029
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19198031
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19198033
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19188013
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 3, 2026 · fix by Oct 8, 2026 overdue · Violation #19188012
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19158292
- BOther repairsProperly repair or replace the broken or defective first window from west at north in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137059
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective reglaze bathtub in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137055
- BOther repairsAbate the nuisance consisting of pests. evidence of beetles in the entire apartmentIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137058
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze bathtub in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19137061
- BPeeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 4th storyIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18935792
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 11, 2024 · fix by Jul 25, 2024 overdue · Violation #17114151
- CMoldTrace and repair the source and abate the visible mold condition approx 24 square feet at celing and all walls in the bathroomIssued Jul 11, 2024 · fix by Aug 6, 2024 overdue · Violation #17120145
- BMoldTrace and repair the source and abate the visible mold condition approx 20 square feet at celing and north wall in the 5th room from eastIssued Mar 11, 2024 · fix by Apr 15, 2024 overdue · Violation #16720463
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15093764
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15093762
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Apr 4, 2022 · fix by Apr 28, 2022 overdue · Violation #15093761
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 15, 2022 · fix by Apr 8, 2022 overdue · Violation #15042679
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 14, 2022 · fix by Apr 7, 2022 overdue · Violation #15037476
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 14, 2022 · fix by Apr 7, 2022 overdue · Violation #15037477
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 14, 2022 · fix by Apr 7, 2022 overdue · Violation #15037479
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 14, 2022 · fix by Apr 7, 2022 overdue · Violation #15037481
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.