Housing violations · East Flatbush-Erasmus
158 Linden Boulevard, Brooklyn
11226 · 20 apartments · 4 stories · City Council district 40
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster16
- Leaks and water damage9
- Other repairs7
- Broken doors or locks7
- Roaches3
- Mice or rats3
- Missing smoke or CO detector2
- Plumbing, sinks and toilets1
- Mold1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 54 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19234825
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor and east wall in the bathroomIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234819
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · rent impairing · Violation #19234821
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 21, 2026 · fix by Oct 17, 2026 overdue · Violation #19234816
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234818
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234823
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234817
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234822
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234820
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Sep 21, 2026 · fix by Oct 26, 2026 overdue · Violation #19234826
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19209832
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling south, north west, and south walls in the 2nd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209830
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective grout around toilet bowl in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209820
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east ceiling and south and west walls in the 1st room from north at eastIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209821
- BOther repairsProperly repair with similar material the broken or defective slopping sub flooring in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209822
- BBroken doors or locksRefit door in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209823
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209828
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209829
- BBroken doors or locksProperly repair with similar material the broken or defective wood door frame in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209825
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19209831
- BBroken doors or locksProperly repair with similar material the broken or defective closet door at south wall in the 1st room from north at westIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209824
- BOther repairsProperly repair or replace the broken or defective fixture at ceiling in the private hallwayIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209827
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19074798
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19074799
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19074797
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from north at eastIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · rent impairing · Violation #19074796
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18751609
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18751610
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at closet walls in the 1st room from north at westIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18751606
- BOther repairsReplace with new the missing radiator shut off knob at north wall in the 1st room from north at westIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18751607
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from north at eastIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18751603
- BOther repairsProperly repair with similar material the broken or defective wood floor near radiator in the 1st room from north at westIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18751605
- BBroken doors or locksProperly secure the loose base cabinet doors to hinges in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18751608
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468660
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468661
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18365383
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Nov 17, 2025 · fix by Dec 22, 2025 overdue · Violation #18365382
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Jun 10, 2025 · fix by Jul 15, 2025 overdue · Violation #17974075
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Jun 10, 2025 · fix by Jul 15, 2025 overdue · Violation #17974076
- BBroken doors or locksRefit the door in the entranceIssued Jun 9, 2025 · fix by Jul 14, 2025 overdue · Violation #17979423
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17741971
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Mar 11, 2025 · fix by Apr 15, 2025 overdue · Violation #17741972
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Mar 24, 2023 · fix by Apr 17, 2023 overdue · Violation #15837549
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.