Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (East)

403 Macon Street, Brooklyn

11233 · 16 apartments · 4 stories · City Council district 36

By · Updated · Data from NYC HPD

C
1open immediately hazardous violations · 6 per 100 apartments
B22Hazardous, open
A6Non-hazardous, open
!29Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Open in Google Maps ↗

Who owns and manages it

Owning companyOTA 403 MACON LLC
Landlord (head officer or owner)Ellen Guccione

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    10
  2. Other repairs
    8
  3. Broken doors or locks
    5
  4. Missing smoke or CO detector
    2
  5. Leaks and water damage
    2
  6. Bedbugs
    1
  7. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C100 days
from 8 closed · NYC typical: 87 days
B111 days
from 6 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at building front at fire escape, 4th storyIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18348904
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyerIssued Feb 20, 2025 · fix by Mar 27, 2025 overdue · Violation #17703649
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Mar 23, 2022 · fix by Apr 27, 2022 overdue · Violation #15042349
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st storyIssued Mar 23, 2022 · fix by Apr 27, 2022 overdue · Violation #15042350
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the 1st room from northIssued Mar 23, 2022 · fix by Apr 27, 2022 overdue · Violation #15042348
  • C
    Broken doors or locksReplace or repair the self-closing the doors that is missing or defective at building vestibule , 1st storyIssued May 26, 2021 · fix by Jun 21, 2021 overdue · Violation #14355933
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding more than 4 inches…Issued May 26, 2021 · fix by Jun 30, 2021 overdue · Violation #14355870
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 11, 2021 · fix by Feb 15, 2021 overdue · Violation #13971874
  • B
    Other repairsProperly repair with similar material the broken or defective the cabinet shelves at north wall by window in the kitchenIssued Jan 11, 2021 · fix by Feb 15, 2021 overdue · Violation #13971887
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Jan 7, 2021 · fix by Feb 11, 2021 overdue · Violation #13971866
  • B
    Missing smoke or CO detectorProvide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire…Issued Aug 25, 2020 · fix by Sep 29, 2020 overdue · Violation #13777154
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Aug 25, 2020 · fix by Sep 29, 2020 overdue · Violation #13776865
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Aug 25, 2020 · fix by Sep 29, 2020 overdue · Violation #13777156
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed bx cable at ceiling in the 1st room from northIssued Aug 17, 2020 · fix by Sep 21, 2020 overdue · Violation #13766843
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak from ceiling to south wall in the 1st room from northIssued Aug 17, 2020 · fix by Sep 21, 2020 overdue · Violation #13766832
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 1st room from northIssued Aug 17, 2020 · fix by Sep 21, 2020 overdue · Violation #13766840
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Aug 17, 2020 · fix by Sep 21, 2020 overdue · Violation #13766849
  • B
    Leaks and water damageSection 27-2026 adm code repair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524462
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524326
  • B
    Broken doors or locksSection 27-2005 adm code properly repair the broken or defective door frame in the bathroomIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524355
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective ceiling light fixture in the 5th room from northIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524402
  • B
    Broken doors or locksSection 27-2005 adm code properly repair the broken or defective door in the bathroomIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524419
  • B
    Other repairsSection 27-2005 adm code replace with new the missing escutcheon plate around heat riser in the bathroomIssued Nov 22, 2016 · fix by Dec 27, 2016 overdue · Violation #11524454

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42018
22019
102020
62021
112022
12024
182025
12026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 201 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.