Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (East)

464 Madison Street, Brooklyn

11221 · 6 apartments · 3 stories · City Council district 36

By · Updated · Data from NYC HPD

C
26open immediately hazardous violations · 433 per 100 apartments
B72Hazardous, open
A25Non-hazardous, open
!122Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyMADISON EDJ LLC
Landlord (head officer or owner)Cheryl Ighodaro

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    34
  2. Peeling paint and plaster
    29
  3. Broken doors or locks
    17
  4. Mice or rats
    10
  5. Roaches
    9
  6. Leaks and water damage
    9
  7. Plumbing, sinks and toilets
    6
  8. Electrical problems
    3
  9. Missing smoke or CO detector
    2
  10. No heat or hot water
    1
  11. Lead paint
    1
  12. Mold
    1
  13. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C222 days
from 14 closed · NYC typical: 87 days
B537 days
from 51 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156700
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156699
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water exceeding the temperature of 130 degrees in the kitchenIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19156698
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156697
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19156702
  • C
    Other repairsProperly repair or replace the broken or defective counterbalance lower sash window at south in the 6th room from northIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19156701
  • C
    Other repairsProperly repair or replace the broken or defective medicine cabinet at south in the 3rd bathroom from northIssued Aug 24, 2026 · fix by Aug 30, 2026 overdue · Violation #19156705
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156696
  • B
    Other repairsProperly repair with similar material the broken or defective grout ceramic wall tiles at north east and west walls in the 3rd bathroom from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156704
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19156703
  • B
    Other repairsM/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling at center and rear approximately 25 square feetIssued Aug 13, 2025 · fix by Sep 17, 2025 overdue · rent impairing · Violation #18157443
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at public hallIssued Aug 13, 2025 · fix by Aug 27, 2025 overdue · Violation #18157450
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Jul 14, 2025 · fix by Jul 20, 2025 overdue · Violation #18092095
  • B
    Other repairsProperly repair with similar material the broken or defective wood base cabinet at west in the kitchenIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18092097
  • B
    Other repairsReplace with new the missing ceiling light fixture in the 5th room from north at westIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049515
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18049502
  • B
    Broken doors or locksReplace with new the missing closet doors at the east wall in the private hallwayIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049511
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049514
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049508
  • B
    Broken doors or locksRefit entrance door in the 6th room from north at eastIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049516
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze bathtub in the bathroomIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049504
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049513
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at the west wall in the private hallwayIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049509
  • B
    Other repairsProperly secure the loose wall cabinets at the west wall in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049506
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 27, 2025 · fix by Jul 23, 2025 overdue · Violation #18049505
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18049517
  • C
    Lead paintAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 13, 2025 · fix by Jun 8, 2025 overdue · rent impairing · Violation #17882963
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from northIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17882942
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 13, 2025 · fix by Jun 8, 2025 overdue · Violation #17882923
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling,east wall and south wall in the 5th room from northIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17882945
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 13, 2025 · fix by Jun 8, 2025 overdue · Violation #17882921
  • B
    Leaks and water damageRepair the roof so that it will not leak bulkhead at public hallIssued May 9, 2025 · fix by Jun 13, 2025 overdue · rent impairing · Violation #17882952
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at bulkhead ceiling and all walls at public hallIssued May 9, 2025 · fix by Jun 13, 2025 overdue · Violation #17882955
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 2nd storyIssued May 8, 2025 · fix by Jun 12, 2025 overdue · Violation #17882958
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Apr 24, 2025 · fix by May 29, 2025 overdue · Violation #17844614
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 24, 2025 · fix by May 20, 2025 overdue · Violation #17844615
  • B
    Other repairsProperly secure the loose base cabinet at west wall in the kitchenIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497932
  • B
    Broken doors or locksProperly secure the loose door at entrance in the 1st room from northIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497935
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the 2nd bathroom from northIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · rent impairing · Violation #17497940
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 4, 2024 · fix by Dec 30, 2024 overdue · Violation #17497939
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line at wash basin in the 2nd bathroom from northIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497938
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 4, 2024 · fix by Dec 30, 2024 overdue · Violation #17497937
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497936
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall and ceiling in the kitchenIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497934
  • B
    Other repairsProperly repair with similar material the broken or defective wood panel at bottom inside base cabinet at west wall in the kitchenIssued Dec 4, 2024 · fix by Jan 8, 2025 overdue · Violation #17497933
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 24, 2024 · fix by Nov 19, 2024 overdue · Violation #17370882
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 24, 2024 · fix by Nov 19, 2024 overdue · Violation #17370878
  • B
    Broken doors or locksProperly repair or replace the broken or defective wall cabinet doors and base cabinet doors at south and west walls in the kitchenIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17281399
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 19, 2024 · fix by Oct 15, 2024 overdue · Violation #17281400
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17281401
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674640
  • B
    Other repairsProperly repair or replace the broken or defective air exhaust mechanical vent at north wall in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674642
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674650
  • B
    Electrical problemsReplace with new the missing cover for electrical switch at east wall in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674657
  • B
    Broken doors or locksProperly repair or replace the broken or defective metal strike plate on door frame in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674659
  • B
    Broken doors or locksProperly repair or replace the broken or defective marble saddle at door frame in the 2nd bathroom from northIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674660
  • B
    Broken doors or locksProperly repair or replace the broken or defective hinges on door at upper and lower cabinet at west wall in the kitchenIssued Feb 21, 2024 · fix by Mar 27, 2024 overdue · Violation #16674631
  • B
    Other repairsProperly repair or replace the broken or defective air exhaust mechanical vent at south wall in the 1st bathroom from northIssued Feb 16, 2024 · fix by Mar 22, 2024 overdue · Violation #16674665
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 5th room from north at westIssued Feb 16, 2024 · fix by Mar 22, 2024 overdue · Violation #16674668
  • B
    Other repairsProperly repair or replace the broken or defective baseboard heating unit at west wall in the 5th room from north at westIssued Feb 16, 2024 · fix by Mar 22, 2024 overdue · Violation #16674669

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

322017
192018
32019
162020
152021
12022
292023
702024
552025
132026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 287 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.