Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford-Stuyvesant (West)

273 Monroe Street, Brooklyn

11216 · 6 apartments · 3 stories · City Council district 36

By · Updated · Data from NYC HPD

C
7open immediately hazardous violations · 117 per 100 apartments
B34Hazardous, open
A9Non-hazardous, open
!50Past the fix-by date

On average, NYC buildings have 19.7 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyGATES CLUSTER DEVELOPMENT, LP
Landlord (head officer or owner)Robyn Lucas

As registered with HPD.

What the city has done here

When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.

1Repairs the city did itself
$1,330Billed to the owner for them
2Court cases HPD brought
0Cases tenants brought

Latest city repairs

  • $
    General repairs · $1,330Leaks and water damageMar 6, 2014 · Details

Latest Housing Court cases

  • §
    Many unfixed violationsOpened Apr 1, 2019 · Pending · Details
  • §
    Warrant to get in and inspect or repairOpened Sep 13, 2017 · Closed · Details

Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.

Open problems

All open violations in the building, by type.

  1. Other repairs
    13
  2. Broken doors or locks
    9
  3. Peeling paint and plaster
    8
  4. Leaks and water damage
    6
  5. Missing smoke or CO detector
    4
  6. No heat or hot water
    4
  7. Lead paint
    2
  8. Bedbug report not filed
    1
  9. Mold
    1
  10. Electrical problems
    1
  11. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C33 days
from 2 closed · NYC typical: 84 days
BNot enough data
NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective lock at window at fire escape window at south wall in the 3rd room from northIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958055
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from northIssued May 28, 2026 · fix by Jul 2, 2026 overdue · rent impairing · Violation #18958054
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958058
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 25, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18665603
  • C
    Lead paintProvide ready access to buildings heating system door locked leading to boiler room at public hall, 1st storyIssued Feb 25, 2026 · fix by Mar 3, 2026 overdue · Violation #18665604
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17819171
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17819170
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at entrance in the 1st room from eastIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17819172
  • B
    Broken doors or locksRefit the entrance door in the bathroomIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17794385
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Apr 2, 2025 · fix by Apr 8, 2025 overdue · Violation #17794384
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from eastIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17794381
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the kitchenIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17794382
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the foyerIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17794383
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Apr 2, 2025 · fix by Apr 8, 2025 overdue · Violation #17794386
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wood door at north in the bathroomIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17214091
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 1st room from eastIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · rent impairing · Violation #17214089
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17214088
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at westIssued Apr 4, 2024 · fix by May 9, 2024 overdue · Violation #16775241
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at westIssued Apr 4, 2024 · fix by May 9, 2024 overdue · Violation #16775240
  • B
    Broken doors or locksProperly repair with similar material the broken or defective wooden door at entrance in the bathroomIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742394
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Mar 14, 2024 · fix by Apr 18, 2024 overdue · Violation #16742393
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 2 sq.ft at east wall in the bathroomIssued Mar 8, 2024 · fix by Apr 12, 2024 overdue · Violation #16733277
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Nov 14, 2023 · fix by Dec 19, 2023 overdue · Violation #16346856
  • B
    Electrical problemsProperly repair or replace the broken or defective all electrical switch at all walls in the entire apartmentIssued Nov 14, 2023 · fix by Dec 19, 2023 overdue · Violation #16346857
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Nov 14, 2023 · fix by Dec 19, 2023 overdue · Violation #16346855
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 14, 2023 · fix by Dec 10, 2023 overdue · Violation #16346858
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at east wall in the bathroomIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · Violation #16346860
  • B
    Other repairsReplace the broken or defective base board radiator element in the bathroomIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · rent impairing · Violation #16346861
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 2nd room from eastIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16346863
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor in the kitchenIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16346862
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 30, 2023 · fix by Oct 27, 2023 overdue · rent impairing · Violation #16338141
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from eastIssued Oct 25, 2023 · fix by Nov 29, 2023 overdue · rent impairing · Violation #16331101
  • C
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Mar 25, 2022 · fix by Mar 31, 2022 overdue · Violation #15066412
  • B
    Other repairsProperly secure the loose base board radiator at south wall in the 3rd room from eastIssued Mar 25, 2022 · fix by Apr 29, 2022 overdue · Violation #15066411
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Mar 25, 2022 · fix by Apr 29, 2022 overdue · Violation #15066410
  • B
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock obstructing egress to window leading to fire escape in the 1st room from eastIssued Mar 25, 2022 · fix by Apr 29, 2022 overdue · Violation #15066413
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding more than 4 inches…Issued Mar 30, 2021 · fix by May 4, 2021 overdue · Violation #14093961
  • B
    Other repairsReplace with new the broken or defective balance at lower window sash at south wall in the 1st room from eastIssued Nov 19, 2020 · fix by Dec 24, 2020 overdue · Violation #13902258
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at front areawayIssued Mar 18, 2020 · fix by Apr 22, 2020 overdue · Violation #13653350
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jan 27, 2020 · fix by Mar 2, 2020 overdue · Violation #13562722
  • B
    Broken doors or locksProperly repair the broken or defective door in the bathroomIssued Jan 27, 2020 · fix by Mar 2, 2020 overdue · Violation #13562728

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

92017
352018
42019
122020
22021
52022
142023
102024
92025
92026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 151 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 17, 2026 at 10:15 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.