Housing violations · Bedford-Stuyvesant (East)
278 Marion Street, Brooklyn
11233 · 7 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster28
- Broken doors or locks26
- Other repairs13
- Leaks and water damage10
- Mold9
- Plumbing, sinks and toilets9
- No heat or hot water7
- Lead paint4
- Missing smoke or CO detector4
- Mice or rats3
- Electrical problems2
- Roaches2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 21 closed · NYC typical: 87 days
from 30 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Oct 9, 2026 · fix by Nov 2, 2026 overdue · Violation #19289060
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288993
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 8, 2026 · fix by Nov 1, 2026 overdue · Violation #19288996
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265543
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at north wall in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265542
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265544
- CBroken doors or locksProvide ready access to buildings heating system locked door to cellar at fire passage way at west at boiler roomIssued Oct 2, 2026 · fix by Oct 8, 2026 overdue · Violation #19265541
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar entrance at building front at boiler roomIssued Jul 1, 2026 · fix by Jul 7, 2026 overdue · Violation #19044267
- COther repairsProvide an adequate supply of gas to the fixtures the range in the kitchenIssued Jul 1, 2026 · fix by Jul 7, 2026 overdue · rent impairing · Violation #19044265
- COther repairsProvide an adequate supply of gas to the fixtures at gas range in the kitchenIssued Jul 1, 2026 · fix by Jul 7, 2026 overdue · rent impairing · Violation #19035686
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 29, 2026 · fix by Jun 27, 2026 overdue · rent impairing · Violation #19035683
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 29, 2026 · fix by Jun 27, 2026 overdue · rent impairing · Violation #19035688
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 24, 2026 · fix by Jun 24, 2026 overdue · rent impairing · Violation #19024269
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 24, 2026 · fix by Jun 24, 2026 overdue · rent impairing · Violation #19024665
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jun 23, 2026 · fix by Jun 20, 2026 overdue · rent impairing · Violation #19016754
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at south wall in the 8th room from northIssued May 29, 2026 · fix by Jun 24, 2026 overdue · Violation #18951566
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 26, 2026 · fix by Jun 21, 2026 overdue · rent impairing · Violation #18949561
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square at window head and around frame in the 7th room from northIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18631483
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and all walls in the bathroomIssued Feb 9, 2026 · fix by Mar 16, 2026 overdue · Violation #18631482
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the 8th room from northIssued Dec 5, 2025 · fix by Jan 9, 2026 overdue · Violation #18488313
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling in the private hallwayIssued Oct 16, 2025 · fix by Nov 11, 2025 overdue · Violation #18308249
- CLead paintProvide ready access to buildings heating system gate at fire passageway leading to basement boiler room is lock at boiler roomIssued Oct 10, 2025 · fix by Oct 16, 2025 overdue · Violation #18287492
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at east, south walls and ceiling in the 2nd bathroom from northIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139381
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at east, north, west walls and ceiling in the bathroomIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139388
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the 2nd bathroom from northIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139384
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the 2nd bathroom from northIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139383
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 8th room from northIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139386
- BOther repairsProperly repair or replace the broken or defective 1st light fixture from north at ceiling in the private hallwayIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18139382
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18086261
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 2nd bathroom from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18086265
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the 2nd bathroom from eastIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18086262
- BBroken doors or locksRefit wood closet door at south in the 4th room from northIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086272
- BBroken doors or locksProvide door handle at south closet in the private hallwayIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086268
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 7th room from northIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086271
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 16, 2025 · fix by Jul 30, 2025 overdue · Violation #18086259
- BBroken doors or locksProperly repair with similar material the broken or defective wood door in the 1st bathroom from eastIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086266
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086269
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 4th room from northIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086273
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 16, 2025 · fix by Aug 20, 2025 overdue · Violation #18086274
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from northIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17756212
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 17, 2025 · fix by Mar 31, 2025 overdue · Violation #17756214
- BBroken doors or locksProperly repair or replace the broken or defective door jam in the 3rd room from northIssued Feb 28, 2025 · fix by Apr 4, 2025 overdue · Violation #17721181
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling in the private hallwayIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17721183
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 27, 2025 · fix by Mar 13, 2025 overdue · Violation #17721180
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the kitchenIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17721179
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling in the 1st room from northIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17721182
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 28, 2024 · fix by Nov 11, 2024 overdue · Violation #17372098
- BBroken doors or locksRefit door in the entranceIssued Jun 21, 2024 · fix by Jul 26, 2024 overdue · Violation #17043904
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 13, 2024 · fix by Jul 9, 2024 overdue · Violation #17043906
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 5th room from northIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · Violation #17043907
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from northIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · Violation #17043908
- BBroken doors or locksProperly repair with similar material the broken or defective wooden door at entrance in the 3rd room from northIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · Violation #17043909
- BLeaks and water damageRepair the leaky and/or defective water supply pipe wasteline under sink in the kitchenIssued Jun 13, 2024 · fix by Jul 18, 2024 overdue · rent impairing · Violation #17043905
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinge onIssued Oct 16, 2023 · fix by Oct 30, 2023 overdue · Violation #16308778
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 16, 2023 · fix by Oct 22, 2023 overdue · Violation #16308780
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of slide bolt with eye capable padlock installed at door in the entranceIssued Oct 16, 2023 · fix by Nov 20, 2023 overdue · Violation #16308779
- BOther repairsProperly repair or replace the broken or defective ventilation system at north wall in the bathroomIssued May 15, 2023 · fix by Jun 19, 2023 overdue · Violation #15984307
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective , at 1st public hall bulkhead from eastIssued Apr 11, 2023 · fix by Apr 25, 2023 overdue · Violation #15917310
- BOther repairsProperly repair the broken or defective intercom systemIssued Apr 11, 2023 · fix by May 16, 2023 overdue · Violation #15917292
- BOther repairsProperly repair the broken or defective enter com system at east wall in the private hallwayIssued Oct 12, 2021 · fix by Nov 16, 2021 overdue · Violation #14612003
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.