Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Erasmus

215 Martense Street, Brooklyn

11226 · 29 apartments · 4 stories · City Council district 40

By · Updated · Data from NYC HPD

C
2open immediately hazardous violations · 7 per 100 apartments
B19Hazardous, open
A1Non-hazardous, open
!22Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Who owns and manages it

Owning company215 MARTENSE LLC
Landlord (head officer or owner)Alan Shamah

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    8
  2. Mold
    3
  3. Broken doors or locks
    3
  4. Peeling paint and plaster
    3
  5. Plumbing, sinks and toilets
    2
  6. Electrical problems
    1
  7. Missing smoke or CO detector
    1
  8. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C75 days
from 18 closed · NYC typical: 87 days
B107 days
from 40 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 3rd room from east at northIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18085483
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18085480
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at east wall in the bathroomIssued May 30, 2025 · fix by Jul 4, 2025 overdue · Violation #17935403
  • B
    Broken doors or locksProperly repair with similar material the broken or defective closet door at east wall in the private hallwayIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901935
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line under washbasin in the bathroomIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901933
  • B
    Broken doors or locksProperly repair or replace the broken or defective door that has exposed broken metal in the entranceIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901932
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line at toilet in the bathroomIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901934
  • B
    Other repairsProperly repair or replace the broken or defective repair wood floor frame in the entranceIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901931
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 19, 2025 · fix by Jun 2, 2025 overdue · Violation #17901930
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower window sash at window at south in the kitchenIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17719142
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Feb 27, 2025 · fix by Mar 5, 2025 overdue · Violation #17719140
  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq feet at east wall in the 1st room from eastIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17657969
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from eastIssued Jan 31, 2025 · fix by Mar 7, 2025 overdue · Violation #17657970
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17657963
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroomIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17657966
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jan 30, 2025 · fix by Mar 6, 2025 overdue · Violation #17657968
  • B
    Other repairsProperly repair with similar material the broken or defective sagging wooden floor in the private hallwayIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17437663
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor in the 2nd room from eastIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17437660
  • B
    Other repairsProperly repair or replace the broken or defective floor under gas range in the kitchenIssued Nov 25, 2024 · fix by Dec 30, 2024 overdue · Violation #17437661
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17401193
  • B
    MoldTrace and repair the source and abate the visible mold condition 15 sq.ft at ceiling and north and east wall in the bathroomIssued Jul 18, 2024 · fix by Aug 22, 2024 overdue · Violation #17093477

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
32018
22019
92021
32022
382024
392025
112026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 136 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.