Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · East Flatbush-Erasmus

307 Martense Street, Brooklyn

11226 · 27 apartments · 4 stories · City Council district 40

By · Updated · Data from NYC HPD

C
17open immediately hazardous violations · 63 per 100 apartments
B40Hazardous, open
A17Non-hazardous, open
!74Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyDitmas Park 307, LLC
Landlord (head officer or owner)Scott Silverman

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    19
  2. Lead paint
    12
  3. Peeling paint and plaster
    9
  4. Broken doors or locks
    9
  5. Missing smoke or CO detector
    7
  6. Mice or rats
    5
  7. Roaches
    5
  8. Mold
    4
  9. Plumbing, sinks and toilets
    2
  10. Leaks and water damage
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C126 days
from 26 closed · NYC typical: 87 days
B106 days
from 16 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 17, 2026 · fix by Apr 12, 2026 overdue · Violation #18714765
  • B
    Other repairsProperly repair with similar material the broken or defective base cabinet counter top at north wall in the kitchenIssued Mar 17, 2026 · fix by Apr 21, 2026 overdue · Violation #18714766
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from northIssued Sep 19, 2025 · fix by Oct 24, 2025 overdue · Violation #18235748
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18177199
  • B
    Other repairsProperly repair or replace the broken or defective rotted laminate countertop at west wall in the kitchenIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18177208
  • B
    Other repairsProperly repair or replace the broken or defective spring balance lower window sash at 1st window from east at south in the 2nd room from east at southIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18177207
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 22, 2025 · fix by Sep 17, 2025 overdue · Violation #18177202
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 22, 2025 · fix by Sep 17, 2025 overdue · Violation #18177203
  • B
    Other repairsProperly repair or replace the broken or defective wood window sill at 2nd window from west at north in the 2nd room from east at northIssued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18177206
  • B
    Other repairsProperly repair with similar material the broken or defective deteriorated grout on ceramic tiles at north wall, east wall, and west wall of shower enclosure…Issued Aug 22, 2025 · fix by Sep 26, 2025 overdue · Violation #18177201
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2025 · fix by Aug 7, 2025 overdue · Violation #18092291
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2025 · fix by Aug 7, 2025 overdue · Violation #18092290
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash in the 2nd room from eastIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18088016
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash in the 1st room from east at southIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18088006
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 14, 2025 · fix by Aug 7, 2025 overdue · Violation #18092292
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at west wall in the bathroomIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17796957
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at east wall in the bathroomIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17796955
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at northIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17796964
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at north wall in the bathroomIssued Apr 2, 2025 · fix by May 7, 2025 overdue · Violation #17796954
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 8, 2024 · fix by Sep 3, 2024 overdue · Violation #17174842
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17123845
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17123843
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17123844
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17123846
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 17, 2024 · fix by Aug 21, 2024 overdue · Violation #17123847
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 10, 2024 · fix by Jul 14, 2024 overdue · Violation #17112586
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 10, 2024 · fix by Jul 14, 2024 overdue · Violation #17112587
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south walls in the 1st room from eastIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16981626
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 20, 2024 · fix by Jun 15, 2024 overdue · Violation #16981625
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 20, 2024 · fix by Jun 15, 2024 overdue · Violation #16981624
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued May 20, 2024 · fix by Jun 24, 2024 overdue · Violation #16981623
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 8, 2024 · fix by Mar 5, 2024 overdue · Violation #16656578
  • B
    Broken doors or locksReplace with new the missing bathroom door in the bathroomIssued Dec 21, 2022 · fix by Jan 25, 2023 overdue · Violation #15629404
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of consisting of and unacceptable key lock installed at room door leading to fire escape in the 3rd room from east…Issued Dec 21, 2022 · fix by Dec 27, 2022 overdue · Violation #15629407
  • C
    Broken doors or locksRemove the illegal fastening slide bolt capable of being padlocked in the entranceIssued Dec 21, 2022 · fix by Dec 27, 2022 overdue · rent impairing · Violation #15629405
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Dec 21, 2022 · fix by Jan 25, 2023 overdue · Violation #15629402
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Dec 12, 2022 · fix by Jan 16, 2023 overdue · Violation #15608986
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of nails coming out from wood floor in the private hallwayIssued Sep 14, 2022 · fix by Sep 20, 2022 overdue · Violation #15370988
  • B
    Broken doors or locksProperly secure the loose doors at south and north wall cabinets in the kitchenIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370995
  • B
    Other repairsProperly secure the loose wall cabinets at south wall in the kitchenIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370993
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector that is missing in the entire apartmentIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370998
  • B
    Other repairsProperly secure the loose mirrow at wall cabinet in the bathroomIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370992
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370990
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). that is missing in the entire apartmentIssued Sep 14, 2022 · fix by Oct 19, 2022 overdue · Violation #15370996
  • B
    Other repairsProperly secure the loose wall cabinet at south wall in the kitchenIssued Aug 8, 2022 · fix by Sep 12, 2022 overdue · Violation #15300664
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the sink in the kitchenIssued Jul 13, 2022 · fix by Aug 17, 2022 overdue · Violation #15261064
  • B
    Leaks and water damageRepair the leaky and/or defective faucets bathtub in the bathroomIssued Jul 13, 2022 · fix by Aug 17, 2022 overdue · Violation #15261060
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector , missingIssued Jul 13, 2022 · fix by Aug 17, 2022 overdue · Violation #15261062
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). , missingIssued Jul 13, 2022 · fix by Aug 17, 2022 overdue · Violation #15261061
  • B
    Broken doors or locksProperly secure the loose wood doors to floor cabinets at north and south wall in the kitchenIssued Jul 13, 2022 · fix by Aug 17, 2022 overdue · Violation #15261063
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 12, 2022 · fix by Aug 5, 2022 overdue · Violation #15261637
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 11, 2022 · fix by Aug 6, 2022 overdue · Violation #15261069
  • B
    Other repairsReplace with new the broken or defective wood base at south floor cabinets in the kitchenIssued Jul 11, 2022 · fix by Aug 15, 2022 overdue · Violation #15261065
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in the waste pipe at wash basin in the bathroomIssued Jul 11, 2022 · fix by Aug 15, 2022 overdue · rent impairing · Violation #15261066
  • B
    Other repairsProperly secure the loose 9th and 13th marble treads up from bottom at public hall stairs, 1st storyIssued Mar 16, 2021 · fix by Apr 20, 2021 overdue · Violation #14072983
  • B
    RoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Sep 4, 2012 · fix by Oct 9, 2012 overdue · Violation #9558798
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Sep 4, 2012 · fix by Oct 9, 2012 overdue · Violation #9558799

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12017
72020
102021
572022
292024
452025
152026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 189 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.