Housing violations · Ocean Hill
214 Mac Dougal Street, Brooklyn
11233 · 20 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint38
- Peeling paint and plaster22
- Leaks and water damage12
- Other repairs8
- Missing smoke or CO detector7
- Plumbing, sinks and toilets5
- Broken doors or locks5
- Mold4
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 13 closed · NYC typical: 87 days
from 13 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, east, south, west walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364796
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364801
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364794
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 2nd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364800
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and west walls in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364799
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west, north and east walls in the 3rd room from northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east, south and west walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364797
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling,east, south and west walls in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19364791
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq ft observed at ceiling, east, south and west walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364792
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling,east, south and west walls in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19364793
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19339855
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling south east and west walls in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19339854
- BOther repairsProperly repair or replace the broken or defective shut off valve at radiator at west in the 2nd room from north at eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338661
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338660
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at eastIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338659
- BBroken doors or locksProperly repair or replace the broken or defective closet door at west wall in the private hallwayIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19328815
- BPlumbing, sinks and toiletsRepair the broken or defective connection at waste pipe at sink in the kitchenIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19328814
- BBroken doors or locksReplace with new the missing entrance door in the 1st room from north at eastIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19328813
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209015
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209016
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the 1st room from east at northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209017
- BBroken doors or locksProperly repair with similar material the broken or defective wood entrance door in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19209018
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18999744
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18693576
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective bathtub surface with spray enamel in the bathroomIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510707
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Dec 17, 2025 · fix by Jan 21, 2026 overdue · Violation #18510706
- COther repairsProperly repair or replace the broken or defective radiator air valve releasing steam and or water in the 2nd room from northIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · Violation #18441547
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling (32 sq ft) , north wall (18 sq ft),and east walls (10 sq ft)…Issued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18267978
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling , north wall and east walls in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267990
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267965
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267934
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267916
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at ceiling in the bathroomIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18267963
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, south wall, west walls and ceiling in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267922
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267920
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall , east wall, west wall south walls and ceiling in the 2nd room…Issued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18267917
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 29, 2023 · fix by Oct 3, 2023 overdue · Violation #16194263
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 29, 2023 · fix by Oct 3, 2023 overdue · Violation #16194265
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 23, 2022 · fix by Oct 17, 2022 overdue · Violation #15389940
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Sep 23, 2022 · fix by Oct 17, 2022 overdue · Violation #15389939
- BMissing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Oct 2, 2012 · fix by Nov 6, 2012 overdue · Violation #9593784
- BMissing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Oct 2, 2012 · fix by Nov 6, 2012 overdue · Violation #9593785
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Sep 24, 2009 · fix by Oct 29, 2009 overdue · Violation #4724799
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239083
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239086
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239087
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239101
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239103
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239104
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239105
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239108
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239106
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239109
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239092
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239110
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239080
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239093
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239081
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239082
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Dec 9, 2004 · fix by Jan 4, 2005 overdue · Violation #5239085
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.