Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Hell's Kitchen

340 West 49 Street, Manhattan

10019 · 17 apartments · 5 stories · City Council district 3

By · Updated · Data from NYC HPD

C
9open immediately hazardous violations · 53 per 100 apartments
B18Hazardous, open
A7Non-hazardous, open
!21Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    7
  2. Broken doors or locks
    6
  3. Peeling paint and plaster
    6
  4. Mice or rats
    5
  5. Leaks and water damage
    5
  6. Missing smoke or CO detector
    2
  7. Roaches
    2
  8. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C541 days
from 25 closed · NYC typical: 87 days
B560 days
from 21 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19329627
  • C
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · rent impairing · Violation #19329619
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19329626
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19329624
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 28, 2026 · fix by Nov 11, 2026 overdue · Violation #19329620
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 28, 2026 · fix by Nov 23, 2026 · Violation #19329623
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 5th room from eastIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19329629
  • B
    Broken doors or locksRefit door in the 1st room from northIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286916
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286915
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19286914
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19168811
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19129451
  • B
    Broken doors or locksRefit closet door at west wall in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129450
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south and west walls in the 1st room from northIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129449
  • B
    Other repairsProperly repair or replace the broken or defective mechanical air vent at north wall in the kitchenIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19079355
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19079331
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19079337
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19079336
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19079332
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19079339
  • B
    Broken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19048344
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19048348
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Jul 2, 2026 · fix by Aug 6, 2026 overdue · Violation #19048345
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 4, 2026 · fix by Mar 30, 2026 overdue · Violation #18682835
  • B
    Other repairsProvide interior lower wire mesh screen skylight at bulkhead , 5th storyIssued Nov 21, 2023 · fix by Dec 26, 2023 overdue · Violation #16337892
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the bathroomIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16358338
  • B
    Other repairsProperly repair with similar material the broken or defective rotted wood floor in the kitchenIssued Nov 6, 2023 · fix by Dec 11, 2023 overdue · Violation #16358337

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

12018
472023
72024
382026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 93 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.