Housing violations · Bedford-Stuyvesant (East)
767 Monroe Street, Brooklyn
11221 · 8 apartments · 4 stories · City Council district 41
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Leaks and water damage3
- No heat or hot water2
- Peeling paint and plaster2
- Other repairs2
- Electrical problems2
- Broken doors or locks1
- Mold1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the kitchenIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19327308
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19327309
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water above 130 degrees. fah in the kitchenIssued Oct 28, 2026 · fix by Nov 3, 2026 overdue · Violation #19329399
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st storyIssued Oct 26, 2026 · fix by Nov 9, 2026 overdue · Violation #19327310
- CMice or ratsAbate the infestation consisting of mice at basementIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19156606
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156609
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19156608
- BOther repairsProperly repair with similar material the broken or defective metal strip at floor at entrance in the kitchenIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18973448
- BOther repairsProperly repair or replace the broken or defective intercom system from building front to return buzzer at west wall in the foyerIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18973449
- BElectrical problemsProperly repair or replace the broken or defective electrical light switch at east wall in the 2nd room from north at westIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18973450
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Mar 10, 2025 · fix by Mar 9, 2025 overdue · Violation #17747430
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 23, 2022 · fix by Jun 27, 2022 overdue · Violation #15165326
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 23, 2022 · fix by Jun 27, 2022 overdue · Violation #15165325
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.