Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (South)

2030 Adam C Powell Boulevard, Manhattan

10027 · 57 apartments · 8 stories · City Council district 9

By · Updated · Data from NYC HPD

C
143open immediately hazardous violations · 251 per 100 apartments
B359Hazardous, open
A72Non-hazardous, open
!568Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

31 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open problems

All open violations in the building, by type.

  1. Other repairs
    171
  2. Peeling paint and plaster
    115
  3. Leaks and water damage
    67
  4. Broken doors or locks
    52
  5. Mold
    31
  6. Roaches
    30
  7. Missing smoke or CO detector
    28
  8. Plumbing, sinks and toilets
    24
  9. Mice or rats
    20
  10. Electrical problems
    16
  11. No heat or hot water
    10
  12. Missing window guards
    5
  13. Bedbugs
    3
  14. Lead paint
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C210 days
from 124 closed · NYC typical: 87 days
B128 days
from 62 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364179
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the private hallwayIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364185
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash at west wall in the kitchenIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364183
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364181
  • C
    Broken doors or locksProperly repair or replace the broken or defective mortice lock at apartment entrance in the entranceIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19364188
  • B
    Other repairsProperly repair or replace the broken or defective bell/buzzer system in the private hallwayIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19364186
  • B
    Other repairsProperly repair or replace the broken or defective intercom at public hall, 1st storyIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19158567
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19158561
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19136110
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 2 sq feet at west wall in the 2nd room from eastIssued Jul 21, 2026 · fix by Aug 25, 2026 overdue · Violation #19095510
  • B
    Other repairsProperly repair or replace the broken or defective intercom system in the entire apartmentIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18982528
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 1st storyIssued Jun 4, 2026 · fix by Jun 18, 2026 overdue · Violation #18982630
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · Violation #18975146
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from eastIssued Jun 2, 2026 · fix by Jul 7, 2026 overdue · rent impairing · Violation #18975145
  • B
    Other repairsProperly repair or replace the broken or defective intercom at public hall, 7th storyIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954216
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 5, 2026 · fix by May 31, 2026 overdue · Violation #18851398
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 21, 2026 · fix by May 17, 2026 overdue · Violation #18806968
  • B
    Other repairsProperly repair with similar material the broken or defective wooden sub floor in the 1st room from northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18806966
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at the east wall in the bathroomIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18806969
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 12 sq feet at ceiling, east and south wall in the bathroomIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18770094
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Apr 7, 2026 · fix by Apr 13, 2026 overdue · Violation #18770092
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18733068
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18733069
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the foyerIssued Mar 23, 2026 · fix by Mar 29, 2026 overdue · rent impairing · Violation #18733067
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from eastIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18733064
  • C
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from eastIssued Mar 23, 2026 · fix by Mar 29, 2026 overdue · rent impairing · Violation #18733063
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18703984
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Feb 10, 2026 · fix by Feb 16, 2026 overdue · Violation #18637278
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 10, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18637276
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 10, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18637275
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 3, 2026 · fix by Jan 31, 2026 overdue · rent impairing · Violation #18607378
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 3, 2026 · fix by Jan 31, 2026 overdue · rent impairing · Violation #18607379
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Feb 3, 2026 · fix by Mar 10, 2026 overdue · Violation #18607381
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 3, 2026 · fix by Feb 9, 2026 overdue · Violation #18607382
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 30, 2026 · fix by Jan 30, 2026 overdue · rent impairing · Violation #18611047
  • B
    Other repairsProperly repair or replace the broken or defective window balance lower sash offset 1 and offset 2 window at north wall in the 3rd room from eastIssued Jan 30, 2026 · fix by Mar 6, 2026 overdue · Violation #18611051
  • B
    Other repairsProperly repair or replace the broken or defective window balance lower sash offset 1 and offset 2 window at north wall in the 1st room from eastIssued Jan 30, 2026 · fix by Mar 6, 2026 overdue · Violation #18611050
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 30, 2026 · fix by Jan 30, 2026 overdue · rent impairing · Violation #18611049
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the 1st room from northIssued Jan 22, 2026 · fix by Jan 22, 2026 overdue · rent impairing · Violation #18591563
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 5, 2026 · fix by Jan 4, 2026 overdue · rent impairing · Violation #18555881
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 5, 2026 · fix by Jan 4, 2026 overdue · rent impairing · Violation #18555882
  • C
    Other repairsProperly repair or replace the broken or defective spring balance on upper and lower window sash in the kitchenIssued Dec 18, 2025 · fix by Dec 24, 2025 overdue · Violation #18520677
  • C
    Other repairsProperly repair or replace the broken or defective spring balance on upper and lower window sash at east and west window in the 1st room from northIssued Dec 18, 2025 · fix by Dec 24, 2025 overdue · Violation #18520676
  • C
    Other repairsProperly repair or replace the broken or defective defective spring balance on upper and lower window sash at east and west window in the 2nd room from northIssued Dec 18, 2025 · fix by Dec 24, 2025 overdue · Violation #18520678
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 10, 2025 · fix by Jan 5, 2026 overdue · Violation #18491668
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 10, 2025 · fix by Jan 5, 2026 overdue · Violation #18491667
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2025 · fix by Nov 24, 2025 overdue · Violation #18337810
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2025 · fix by Nov 24, 2025 overdue · Violation #18337803
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18214902
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191546
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building entrance to panel at north wall in the private hallwayIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191549
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191548
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18191547
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 2, 2025 · fix by Sep 28, 2025 overdue · Violation #18191545
  • C
    Broken doors or locksProperly repair or replace the broken or defective heavy duty lockset at building front entrance door at public hall, 1st storyIssued Aug 1, 2025 · fix by Aug 7, 2025 overdue · Violation #18128724
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding a maximum temperature of 130 degress at all hot water fixtures in the entire…Issued Jul 18, 2025 · fix by Jul 24, 2025 overdue · Violation #18101174
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Jul 18, 2025 · fix by Jul 24, 2025 overdue · Violation #18101182
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection at wastepipe at sink in the kitchenIssued Jul 18, 2025 · fix by Jul 24, 2025 overdue · Violation #18101188
  • B
    Broken doors or locksProperly repair with similar material the broken or defective rubber gasket at upper and lower doors at refrigerator in the kitchenIssued Jul 18, 2025 · fix by Aug 22, 2025 overdue · Violation #18101190
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 18, 2025 · fix by Aug 13, 2025 overdue · Violation #18101164

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

362017
1022018
2852019
1432020
1532021
2022022
2642023
1442024
752025
592026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,550 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.