Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush (West)-Ditmas Park-Parkville

1280 Ocean Avenue, Brooklyn

11230 · 66 apartments · 6 stories · City Council district 45

By · Updated · Data from NYC HPD

C
16open immediately hazardous violations · 24 per 100 apartments
B18Hazardous, open
A11Non-hazardous, open
!40Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

Who owns and manages it

Owning companyFLGSP 1280 Ocean Ave LLC
Landlord (head officer or owner)Brayan Lemus

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    8
  2. Broken doors or locks
    7
  3. Lead paint
    7
  4. Peeling paint and plaster
    6
  5. Other repairs
    6
  6. Roaches
    5
  7. Leaks and water damage
    3
  8. Missing window guards
    2
  9. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C177 days
from 116 closed · NYC typical: 87 days
B130 days
from 171 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19283076
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19283078
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19267130
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling at closet in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267140
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at closet ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19267139
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202151
  • B
    Other repairsProperly repair with similar material the broken or defective marble saddle at entrance at south wall in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202152
  • B
    Other repairsProperly repair with similar material the broken or defective rotted wood window sill at east wall in the 1st room from northIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202149
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19202150
  • B
    MoldTrace and repair the source and abate the visible mold condition at less than 10 sqft window frame from west at north wall in the private hallwayIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19025546
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19019523
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Mar 2, 2026 · fix by Mar 28, 2026 overdue · Violation #18677311
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 2, 2026 · fix by Mar 26, 2026 overdue · Violation #18685298
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Mar 2, 2026 · fix by Mar 26, 2026 overdue · Violation #18685299
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 2, 2026 · fix by Mar 26, 2026 overdue · Violation #18685297
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Mar 2, 2026 · fix by Mar 26, 2026 overdue · Violation #18685294
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Mar 2, 2026 · fix by Mar 26, 2026 overdue · Violation #18685296
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at, bathtub , north wall, in the bathroomIssued Mar 2, 2026 · fix by Apr 6, 2026 overdue · Violation #18677304
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square ft at ceiling and all walls in the bathroomIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18641141
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185596
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185595
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 2, 2024 · fix by Apr 28, 2024 overdue · Violation #16788203
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 1, 2024 · fix by Apr 27, 2024 overdue · Violation #16777651
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 1, 2024 · fix by Apr 27, 2024 overdue · Violation #16777650
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2024 · fix by Apr 22, 2024 overdue · Violation #16774698
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Feb 5, 2024 · fix by Feb 29, 2024 overdue · Violation #16653241
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 5, 2024 · fix by Mar 2, 2024 overdue · Violation #16640907
  • B
    MoldTrace and repair the source and abate the visible mold condition at( approximately 15 sqft ) 1st closet from south at west wall wall in the 1st room from northIssued Oct 26, 2023 · fix by Nov 30, 2023 overdue · Violation #16332217
  • C
    Lead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 3, 2023 · fix by Jul 27, 2023 overdue · Violation #16078574
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 17, 2019 · fix by Jan 7, 2020 overdue · Violation #13497912
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 12 sq ft at east wall in the kitchenIssued Apr 9, 2019 · fix by May 14, 2019 overdue · Violation #13002878
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 10sq ft at east wall in the 1st room from east at northIssued Apr 9, 2019 · fix by May 14, 2019 overdue · Violation #13002875
  • C
    MoldTrace and repair the source and abate the visible mold condition ,approxametly 40 sq. ft. north wall, east wall, baseboard at east wall, baseboard at north…Issued Feb 25, 2019 · fix by Mar 18, 2019 overdue · Violation #12927266
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at east and south walls (12 square feet) in the 2nd room from north at eastIssued Nov 30, 2018 · fix by Jan 4, 2019 overdue · Violation #12779342

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

172017
142018
702019
42020
332021
32022
1082023
1692024
472025
832026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 613 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.