Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Flatbush (West)-Ditmas Park-Parkville

1362 Ocean Avenue, Brooklyn

11230 · 48 apartments · 4 stories · City Council district 45

By · Updated · Data from NYC HPD

C
195open immediately hazardous violations · 406 per 100 apartments
B203Hazardous, open
A75Non-hazardous, open
!397Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

37 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyFLGSP 1362 Ocean Ave LLC
Landlord (head officer or owner)Brayan Lemus

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    134
  2. Peeling paint and plaster
    83
  3. Broken doors or locks
    38
  4. Lead paint
    38
  5. Leaks and water damage
    37
  6. Mice or rats
    36
  7. Plumbing, sinks and toilets
    29
  8. Roaches
    26
  9. Electrical problems
    18
  10. Mold
    16
  11. No heat or hot water
    8
  12. Missing smoke or CO detector
    7
  13. Missing window guards
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C157 days
from 310 closed · NYC typical: 87 days
B148 days
from 499 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Other repairsProperly repair or replace the broken or defective upper window sash counter balance offset 1 at east wall in the 2nd room from eastIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376639
  • B
    MoldTrace and repair the source and abate the visible mold condition lees than 10 sq.ft south window frame in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376679
  • B
    Broken doors or locksProperly repair or replace the broken or defective intercom system from entrance door of the building to north wall in the private hallwayIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366554
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376176
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376178
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366557
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub-floor in the 1st room from east at northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366562
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376154
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19366563
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub-floor in the 1st room from east at southIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19366564
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19366565
  • B
    Other repairsProperly repair with similar material the broken or defective sloping concrete sub floor in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376175
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2026 · fix by Dec 6, 2026 · Violation #19371097
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tiles at the north wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376172
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376171
  • C
    Other repairsProperly repair or replace the broken or defective 2nd upper window sash from north at the east wall in the 1st room from east at northIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376167
  • C
    Broken doors or locksProperly repair or replace the broken or defective closet door in the 1st room from east at northIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376165
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from east at northIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376164
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19376179
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376624
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376626
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376155
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376628
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tile at west, north and east wall in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376629
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376631
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door at west wall in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376632
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2026 · fix by Dec 6, 2026 · Violation #19371099
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Nov 12, 2026 · fix by Dec 6, 2026 · Violation #19371100
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19366560
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 12, 2026 · fix by Dec 6, 2026 · Violation #19371101
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19371241
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376633
  • B
    Other repairsProperly repair or replace the broken or defective lower window sash counter balance offset 1 at east wall in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376634
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at southIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376159
  • C
    Other repairsProperly repair or replace the broken or defective upper window sash counter balance, egress window at east wall in the 1st room from eastIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376635
  • C
    Other repairsProperly repair or replace the broken or defective upper sash glass pane at the window in the bathroomIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376163
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the 2nd room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376637
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19376636
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash glass panel offset 2 at east wall in the 2nd room from eastIssued Nov 12, 2026 · fix by Nov 18, 2026 · Violation #19376638
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at upper sash at window in the 2nd room from north at westIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19356449
  • C
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at wash basin and bath tub in the bathroomIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · rent impairing · Violation #19356448
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19343869
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19343855
  • B
    Other repairsProperly repair or replace the broken or defective light switch cover at south wall in the private hallwayIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19343861
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19343836
  • B
    Other repairsProperly repair or replace the broken or defective bell/buzzer/intercom system in the entranceIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19343839
  • C
    Other repairsProperly repair or replace the broken or defective lower window sash counter balance, offset 2 at east wall in the 1st room from eastIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19343850
  • C
    Other repairsProperly repair or replace the broken or defective spring balance at lolwer window sash at fire escape window in the 1st room from northIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337519
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337520
  • B
    Plumbing, sinks and toiletsProperly secure the loose faucet at sink in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337515
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the entranceIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337514
  • B
    Other repairsProperly repair or replace the broken or defective inoperative bell and return buzzer from building entrance toIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324254
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in clogged waste drain pipe at bathtub in the bathroomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19324554
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19324248
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at south wall in the kitchenIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19324228
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19324220
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in clogged waste drain pipe at wash basin in the bathroomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19324249
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19324242
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at window lower sash, offset 2 in the 4th room from eastIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324260
  • B
    Broken doors or locksProperly repair or replace the broken or defective wall cabinet door at north wall in the kitchenIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19324238

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

232017
232018
202019
202020
352021
1672022
5352023
3592024
3032025
3372026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,883 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.