Housing violations · Midwood
1438 Ocean Avenue, Brooklyn
11230 · 51 apartments · 4 stories · City Council district 44
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
14 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs41
- Lead paint32
- Mice or rats25
- Peeling paint and plaster20
- Roaches20
- Broken doors or locks14
- Leaks and water damage13
- Plumbing, sinks and toilets12
- Mold10
- Missing smoke or CO detector8
- Electrical problems7
- Missing window guards4
- No heat or hot water2
- Bedbugs1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 78 closed · NYC typical: 87 days
from 94 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BElectrical problemsProperly repair or replace the broken or defective cracked electrical light switch cover at west wall in the 1st room from north at eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341780
- BOther repairsReplace with new the missing radiator shut-off valve knob at south wall in the 1st room from north at eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341779
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wash basin waste line in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19341764
- BOther repairsProperly repair with similar material the broken or defective wood floor in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341766
- BOther repairsProperly repair or replace the broken or defective exhaust ventilation system at ceiling in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341765
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,west and east walls in the 1st room from north at eastIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19341777
- BOther repairsReplace with new the missing knob at radiator shut- off valve south wall in the 1st room from north at westIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341782
- BOther repairsProperly repair with similar material the broken or defective rotten wood floor in the 1st room from north at westIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341781
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341770
- COther repairsProperly repair or replace the broken or defective spring balances at lower sash window to west wall in the bathroomIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19341771
- BOther repairsReplace with new the missing ceramic tiles at north and west walls in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341772
- BBroken doors or locksProperly repair or replace the broken or defective wood door frame in the entrance in the bathroomIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341774
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19341778
- BOther repairsReplace with new the missing knob at radiator shut -off valve at north wall in the 4th room from north at eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341787
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341785
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from north at eastIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19341784
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the entrance , east wall, in the 1st room from north at westIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19341783
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332070
- BOther repairsProperly repair with similar material the broken or defective grout inbetween tiles at west wall in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332065
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulk around the bathtub in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332063
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332062
- BBroken doors or locksRefit room entrance door in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332061
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332058
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332057
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 sq ft observed at ceiling and north wall in the…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332060
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332059
- BOther repairsProperly repair with similar material the broken or defective wood floor in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332064
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332056
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332069
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from northIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332068
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from northIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332067
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19332066
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274204
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274293
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 9, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19274290
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 3rd room from northIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · rent impairing · Violation #19274213
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteliine pipe at the sink in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274208
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · rent impairing · Violation #19274202
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Oct 9, 2026 · fix by Oct 23, 2026 overdue · Violation #19274266
- BOther repairsProperly repair with similar material the broken or defective coping at the east and north parapet wallsIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274163
- BOther repairsProperly repair with similar material the broken or defective roof membrane at the east parapet wallIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274168
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274218
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south, and east walls in the 1st room from north at eastIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274286
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274281
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274279
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 9, 2026 · fix by Nov 4, 2026 overdue · Violation #19274254
- BOther repairsProperly repair or replace the broken or defective lght fixture at ceiling at public hall, 3rd storyIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274176
- BOther repairsProperly repair with similar material the broken or defective grout and mortar joints at west and south walls in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274276
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19274215
- COther repairsImmediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect…Issued Sep 15, 2026 · fix by Sep 13, 2026 overdue · Violation #19220853
- CElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiriing at ceiling throughout cellarIssued Sep 15, 2026 · fix by Sep 21, 2026 overdue · Violation #19220858
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190812
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190811
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190810
- CLead paintReplace or repair the self-closing doors that is missing or defective hinges at door south 1, leading to south yard at public hall, 1st storyIssued Sep 8, 2026 · fix by Sep 22, 2026 overdue · Violation #19190819
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19190817
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at bathtub in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19190814
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190813
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood board at the bottom of the base cabinet under the sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190818
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west and north walls at shower in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190816
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.